Construction + Materials IV: Construction Documents What are they? How can I do them too?

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
IX- CONSTRUCTION PLANNING
Operations 105, Class 4 Architectural Process. Guest Lecturer John was raised in Memphis, Tennessee, but gladly claims to be a Volunteer Texan! John received.
INSTRUCTORS, FACULTY AND COMMITTEES MUST PLAN WHERE WE WANT THE STUDENT TO GO. THE COURSE OUTLINE GUIDES THE STUDENT ON WHERE TO GO AND HOW.
Programming Dream Environment Identify Goals Listen & Learn Heritage Perception Image Future Challenges Restraints Budget Process Workflow Culture Executive.
Commercial Building Project Portfolio
Requirements Engineering n Elicit requirements from customer  Information and control needs, product function and behavior, overall product performance,
Project Close Out CTC-470.
Typical phases of a project: 1.Schematic Design 2.Design Development 3.Construction Documents 4.Construction Administration.
Conditions of the Contract for Construction
PROCEDURES FOR SELECTING THE CONTRACTOR
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
Construction Engineering 221 Cost Estimating and Bidding.
Design & Layout of Foodservice Facilities
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
Construction Specifications
Loss Control Program Compliance Audits An overview of the purpose and procedures of program auditing.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
9 Closing the Project Teaching Strategies
12/28/08 - L6 ProcessesCopyright Joanne DeGroat, ECE, OSU1 The Request for Information (RFI)
Requirements Analysis
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
ACCOUNTING INFORMATION SYSTEMS
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Chapter 2 Introduction to Construction Procedures
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Preparing the Bid Package (A Developers Perspective)
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Chapter 22 Lighting Design Process: Design Phases 1.
Preliminary Project Descriptions/Outline Specifications
ID Media IV Fall 2012 Introduction. Course Description Advanced communication skills are developed through three-dimensional presentations employing.
Demystifying RFI’s, RFP’s and Proposals to Win Business.
Preparatory Seminar for HKIE-STL Examination,Dec., 2009 By Dr. K.S.Law.
Unit 3. Expressing ideas in prints Lines Symbols Dimensions.
What are they? How can I do them too? Construction + Materials IV: Construction Documents.
ID Media IV Introduction. Review the syllabus Goals of the course Structure of semester and classes Projects and grading Schedule.
Dr. John MacCarthy UMBC CMSC 615 Fall, 2006
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
ID 475 Advanced Issues. This course explores the process of advanced and current integrated design trends in Interior Design as related to whole building.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 UNIT 6 Fields, Careers, Work Skills.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Design process.
Design V Prof. Jill Bouratoglou
Architecture, Civil Engineer, and Interior Designer
CONTRACT DOCUMENTS.
Pre-Construction Services
Commercial Building Project Portfolio
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Architecture during Construction ‘observation administration’
Chapter 3 The Marketing Research Process and
Architect A Person who works closely with clients to design structures by making preliminary drawings, sketches, and suggestions for material to be used.
Process Drawings Matrix, Bubble, and Block Plans
Pre-contract Planning and Practice
Client Requirements (review) Bubble Diagrams
Engineering Project Tendering.
MODULE 2 – Project Introduction
Reading Prints Unit 3.
Design process.
FIVE PROJECT PHASES.
Presentation transcript:

Construction + Materials IV: Construction Documents What are they? How can I do them too?

The Traditional Phases of Design:

Purpose of this Process  Facilitate dialog with your client  Anticipate the opportunities and constraints of a given project  Examine exact construction and materials before construction begins  Communicate your design to the people who will build it  Quality assurance during construction

Where’s the contract part?

In your contract…  Schematic Design Prepare design analysis and alternatives Typically diagrams and concepts boards Sketches in perspective, plans and elevations Occasionally materials swatches and square-foot cost estimate  Design Development Detailed dimensional study of chosen scheme Code analysis Most typically plans, sections, elevations, and a full materials board Cost Estimate Occasionally photo-realistic renderings to examine complex design situations  Construction Documents Complete drawn description of all elements of the project Complete written description of all products, including where and an how they are to be used  Bidding and negotiation Assist in preparing and distributing copies of all documents Answer contractor questions Prepare and distribute sketches, request for information (RFI) responses and addenda Advise you client about issues that arise  Construction administration Visit site to verify compliance with the contract documents Answer questions; distribute RFI’s and addenda Advise you client Prepare punch list and certificate of Substantial Completion

Your responsibilities:

CD’s vs. FF&E Documents

Organization:

In this course…  Produce a schematic design  Go through Design Development Code analysis Produce main drawings Cost estimate  Partial Construction documents Drawing set organization, including a specialized computer program for automating drawings Procedures for detailing various common elements Specifications of various sorts  There will be more lecturing during the first half, and more practical application after the mid-term

Consider constructability as you design  Concept statement  Conceptual diagrams  Understanding typical construction methods and procedures  Understanding characteristics of different materials

So what’s the project?

The Endicott Natatorium  In the Post Center gymnasium  Detailed program in the syllabus  You will quickly develop design using existing conditions and bubble diagram  Presentations a week from next class  Here are some examples from last year’s project, a Bowling Alley: