LHC Fri 6 & Sat 7 Nov 2015 06:00 End instabilities MD, dump to refresh air at dump TDE cavern 08:00 Access for vacuum team at the TDE starting 10:30 Access.

Slides:



Advertisements
Similar presentations
LHC 9 & 10 May :50: Start ramp for de-squeeze optics measurements 10:15: Measured squeezed optics 12:00: Dump 13:00: Start local aperture measurements.
Advertisements

LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC 14 & 15 April :22: Ramp to 6.5 TeV lost due to MUFO, resulting in quench 10:30: Access during cryo recovery 16:00: Pre-cycle 17:05: RB.A78 short.
LHC 15 April :19: UFO event detected by on BLM 15.R8 and beam dump 8:46: P2 cold compressor trip and recovery during morning shift. Access given.
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
LHC machine status ~ Daily Summary ~ Daily beam commissioning meeting Week 42 - October 14 th, 2015 CERN, Geneva, CH M. Lamont and S. Redaelli for the.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Friday Access in shadow of SPS interventions (RF, extraction septa power supply) Lead into problem on the cooling of the extraction septa in SPS Both beams.
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 16 G. Arduini, J. Wenninger
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Saturday 2/4/ :00-09:00 Problems with SPS:
Wednesday 8th August & night
Friday March 4th 08h32: Access for beam dump system.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday Morning – recovery from cryo.
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Saturday 7th May Sat – Sun night
Programme for Saturday 10 July
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
Monday 14:00 beam dump Access:
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
LHC Morning Meeting - G. Arduini
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
MD Planning Fri – Sat (1. – 2.7.)
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Friday 15th February - morning
Another Immortal Fill….
Monday 27th August & night
Thursday Morning/Afternoon
Saturday 26 November 2011.
Presentation transcript:

LHC Fri 6 & Sat 7 Nov :00 End instabilities MD, dump to refresh air at dump TDE cavern 08:00 Access for vacuum team at the TDE starting 10:30 Access finished, start pre-cycle 10:55 BLM front-end problem point 3, change CPU 12:00 Injecting for Crystal extraction MD, active halo control & BSRT 13:00 Crystal channelling at injection 14:30 First ramp, dumped at 15:05 due to ‘cryo trip’ of MS.R5, action taken to reduce CS warning level and increase speed of PID 16:40 Dump at injection due to ROD.A4B2 circuit trip 17:15 Ramping again, channelling found at 6.5 TeV 18:51 Beams dumped 19:45 Injecting for Optics team, non linear errors MD 20:40 Ramp. Some problems collimators and orbit correction. Solved. 23:30 Squeezed to 40 cm, ready for optics measurements 00:23 Beams dumped, QPS trigger RSD1.A34B2 LHC Morning meeting – JU, ML & RT107/11/2015

LHC Fri 6 & Sat 7 Nov :00 BETS-TCDQ interlock on beam dump  reset by specialist 02:47 B1 injection septum tripped  since then no B1 anymore until this morning. WIC TI2 is bad for all warm magnets of the line. Access TI2 soon. 03:44 injecting B2 05:45 Stop beam with TCP IP3, shower tripped ATLAS Performing ballistic optics MD with B2 only 2LHC Morning meeting – JU, ML & RT07/11/2015

Summary Active Halo Control MD ADT narrow-band excitation of bunches with pre-blown tails Frequency scans performed for B2H, then repeating fixed frequency excitation as in last MD (0.295) No significant losses were observed Losses occurred when moving closer to tune of Fast sweep with octupoles off, did not produce significant losses. Data to be analysed offline 3LHC Morning meeting – JU, ML & RT07/11/2015 Roderick & Collimation Team

BSRT MD 4LHC Morning meeting – JU, ML & RT07/11/2015

Crystal Collimation MD 5LHC Morning meeting – JU, ML & RT07/11/2015 Traditionally busy in the control room with Stefano and large collimation & UA9 team

IR Non-linear MD Started at 8 at injection. At flattop there were problems with the settings and the reference orbit. Main sextupoles in 34 B2 tripped at ~12:20 just after we had set-up for the first scan. Being back at injection at ~2am would not allow time for any measurement at 40cm (next MD should start at 4am at inj.) so we decided to start the spare MD "chromatic amplitude detuning" at injection. 6LHC Morning meeting – JU, ML & RT07/11/2015

Pressure B2 dump block TDE 7LHC Morning meeting – JU, ML & RT07/11/2015 TDE N2 bottle Intervention Intervention AM: no leak found, but N2 bottle was found closed  opened Around 17:00: bottle starts to top-up the TDE, compensating the leak If we are sure that the pressure measured is the pressure in the TDE we can lift the present intensity restrictions. Intervention foreseen Monday, TS3.

Status of MD3 Block 8LHC Morning meeting – JU, ML & RT06/11/2015 New Ongoing, B2 only