Keys to Process An event at the beginning A Countable result A Customer who triggered the event Cross functional (& cross departmental) Focus at higher.

Slides:



Advertisements
Similar presentations
A BPM Framework for KPI-Driven Performance Management
Advertisements

Quality Planning Tools PMI Westchester Quality SIG Pawan Kumar, Quality SIG Member, PMP November 2007.
Project leaders will keep track of team progress using an A3 Report.
<<Date>><<SDLC Phase>>
Process Mapping. Why Flow Chart? To understand a process or system To (visually) depict all key steps in a process or system To compare existing and ‘ideal’
IE673Session 5 - Process Management1 Process Management.
How to Document A Business Management System
©2006 OLC 1 Process Management: The Foundation for Achieving Organizational Excellence Process Management Implementation Worldwide.
Supply Chain Management
Putting It all Together Facilitating Learning and Project Groups.
IIBA Denver | may 20, 2015 | Kym Byron , MBA, CBAP, PMP, CSM, CSPO
10.1 Identify Stakeholders
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
BUSINESS PROCESS ANALYSIS
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
SIPOC.
PRESENTED BY TRUST THOMAS EROMOSELE STUDENT NO:
Management System Auditing
What is Business Analysis Planning & Monitoring?
Foundation in Business Analysis
Electronic Business Systems
Performance Management Measuring Performance Using Information to Improve Performance.
The Software Development Life Cycle: An Overview
Project Management Process Overview
Requirements Management with Use Cases Module 6: Define the System Requirements Management with Use Cases Module 6: Define the System.
1 Chapter 6 System Engineering. 2 System Engineering What is a computer-based system? A set or arrangement of elements that are organized to accomplish.
Organize to improve Data Quality Data Quality?. © 2012 GS1 To fully exploit and utilize the data available, a strategic approach to data governance at.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Managing by value stream
Roles and Responsibilities
KEYWORDS REFRESHMENT. Activities: in the context of the Logframe Matrix, these are the actions (tasks) that have to be taken to produce results Analysis.
A GENERIC PROCESS FOR REQUIREMENTS ENGINEERING Chapter 2 1 These slides are prepared by Enas Naffar to be used in Software requirements course - Philadelphia.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
SacProNet An Overview of Project Management Techniques.
Applying Business Process Re-engineering
Project Life Cycle – Project Initiation © Ed Green Penn State University All Rights Reserved.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
CISB444 - Strategic Information Systems Planning Chapter 3 : Developing an IS/IT Strategy: Establishing Effective Processes Part 2.
©1999 Addison Wesley Longman Slide 1.1 Business Processes 3.
Define Phase Jimmie Carr OPERMGT 380 Boise State University.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
The Development of BPR Pertemuan 6 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Develop Project Charter
Logistics/Supply Chain Control
The Value Driven Approach
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Week 12: Performance Management and Performance Budgeting Discuss Eureka exercise Review mid-term Conceptual Origins of Performance Management Government.
Version 10.0  The High Performance Organisation Ltd Creating A Process Based Management System 1 Welcome Creating a Process Based Management.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
7-1 McGraw-Hill/Irwin Operations Strategy Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. Business Process- Focused Strategies and.
Quality Management Theory Terms, Concepts, & Principles.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
0 ©2015 U.S. Education Delivery Institute While there is no prescribed format for a good delivery plan, it should answer 10 questions What a good delivery.
(c) Adaptive Processes Consulting Be with the Best!
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
TCRF Strategic Planning Process A Stakeholders’ Consultative Retreat- Morogoro 26 th -27 April 2013.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Presented by: S.M.Tabatabaee Nasab SCOR spans: All customer interactions, from order entry through paid invoice All product (physical material.
© BMA Inc All rights reserved. The Value Stream Managing by value stream.
1 Home Care Support Outcome Based Specification Workshop 26 th November 2009.
1 International Institute of Business Analysis Vision: The world's leading association for Business Analysis professionals” Mission: To develop and maintain.
Process Mapping Overview 10/8/ Agenda Overview of Processes Core and Support Processes Process Redesign Process Mapping Concepts Information Model.
BUSINESS PROCESS ANALYSIS
Background Non-Formal Education is recognized as an important sub-sector of the education system, providing learning opportunities to those who are not.
Is there another way besides accreditation?
Fundamental Cornerstones of Managerial Accounting Chapter Six
MODELLING BUSINESS PROCESSES
Establishing a Strategic Process Roadmap
Sepsis Program Development
Presentation transcript:

Keys to Process An event at the beginning A Countable result A Customer who triggered the event Cross functional (& cross departmental) Focus at higher level Scope bound by authority of sponsor

Process identification Use bottom-up approach –activities, milestones, etc. Identify outside related process Document the scope of the process Assess current process performance Identify new process performance goals

Process identification Brainstorming –Think outside the box! –Generate as many ideas, wacky ones too –Everyone contributes –Cluster similar ideas, cull –Delphi

Process identification Brainstorming –Milestones any desired result of a process or activity e.g. Item is shipped, customer request is met –Rename milestones into steps use verb-noun format –e.g., Ship Item, Reply Customer

Process identification Link Steps –match inputs to outputs –Determine cardinality Identify prospect Schedule meeting Conduct Mkt meeting Establish contract Receive Order Assemble Order Ship Order Calculate Acct. Due Issue Invoice Receive Payment Distribute Payment 1:1 1:M 1:1 M:11:1

Process identification Assemble processes –Group steps with 1:1 links synchronizable flow patterns –Link groups using M:1 or 1:M Variable timing cycles –Name the groups Use active verbs

Process identification Identify prospect Schedule meeting Conduct Mkt meeting Establish contract Receive Order Assemble Order Ship Order Calculate Acct. Due Issue Invoice Receive Payment Distribute Payment 1:1 1:M 1:1 M:1 1:1 Acquire Customer Fulfill Order Collect Account Receivable

Identify event Trigger event –initiated by an actor, customer establishes process boundary –time events –protocol events eliminate these customer reinitiates this process

Stakeholders & results Result –Desired outcome from a process –Discrete, countable –e.g., Order is taken, Customer is seated Objective –Performance target –e.g. Reduce manufacturing cost by 5%

Stakeholders & Results Results –Satisfy a customer –satisfy you & organization –identify all stakeholders and their expectations (results) –good starting point for process identification

Process identification Determine primary steps –represent critical milestones internal to the process –Five to seven –Use decomposition, alternate steps Identify roles Develop data model, ontology

Choosing a process Divine Intervention Analytical approach –Identify critical success factors (CSF) –Identify major processes (5 to 7) –Build a matrix of process by csf –Determine impact of process on csf –Assess broken-ness of process –Compute choice index

Initial Assessment Case for action Metrics Stakeholders Enablers Rationale and Direction Process Poster!

Case for action and vision Case for action –concise statement of why the current process can not be left as-is. –Factual, unexaggerated –persuasive, gripping Vision –articulates the goals for the to-be process

Metrics Count of processes, activities, etc. Time for process –cycle time, work time, time worked, wait time Process participants Efficiency measures Cost measures

Stakeholders Three major groups –Customers –Performers –Owners Other vested parties –Suppliers, government agencies, public, industry groups

Customer Effort required of the customer Should customer monitor process Reasonable rules and requirements Single customer relationship Does anyone care

Enablers The current workflow design Information Technology Motivation and measurement Human resources Policies and Rules Facilities

Case for Action Business context –what is forcing this change External problems Internal problems Diagnostics Consequences of inaction