WFIRST Large-cell structure concept design Preview Work in progress 3/4/2016Robin Lafever1.

Slides:



Advertisements
Similar presentations
SOHO Instructions Cut out the lower bus bottom panels, sides, and top deck. Glue bottom panels together. Fold the side panels on the lines, bending tabs.
Advertisements

1 Ritva Keski-Kuha JWST Deputy OTE Manager May 19, 2009 JWST OTE Development Status JWST-PRES
LWIR FPA Mirror Image Problem & Recovery April 11, 2011 Roy W. Esplin Dave McLain.
TMA-65 Workup Robin Lafever 30 April Detector geometry.
Voyager Spaceprobe1:48 scale Read all the instructions and review the parts sheets before starting. Note the red stars for aligning the HGA dish, support.
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
Solar Orbiter EUS: Thermal Design Considerations Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Considerations.
Delta II –7920 Fitup Study Model TMA-56 f10 optics In-Line configuration Delta II Launch Vehicle 7920 H 10L Composite Fairing.
ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June
Twenty years ago IRAS gave us what is still our best view of the mid  infrared sky.
Constellation Orion Visible Light Constellation Orion Infrared Light.
Thermal Modeling and Model Correlation of the LORRI Telescope
WFIRST Instrument reference information July 1, 2015.
Observatory - Overview July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 1 Single Observatory Stowed.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
1 Mirror subsystem: telescope structure Functions: Functions: Support mirrors subsystem to S/C Support mirrors subsystem to S/C Accommodate cryostat Accommodate.
9/13/2015Robin Lafever BigBoss1. Fiber and Ferrule 9/13/2015Robin Lafever BigBoss2 Typical fiber and Ferrule: My current model is out of date. Jerry Edelstein.
Mars Reconnaissance Orbiter1:48 scale READ ALL THE INSTRUCTIONS AND INSPECT THE PARTS SHEETS FIRST. Score fold lines and cut out the parts. High Gain Antenna.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
Overview of AMS-02 Changes due the addition of the Permanent Magnet
SNAP Integration Model V. S14 The SNAP Integration Model Mechanical [ SC4 Breakout ] Robin Lafever LBNL Engineering.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
Notes from Apr 21 Whiteboard session 1 Robin Lafever Thursday afternoon, 21 Apr We convened around a Whiteboard to try to integrate the spectrum of ideas.
Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011.
DRM1 design description SDT 5/17/12 1. WFIRST DRM candidate design summary At SDT6 2/2-3/2012 consensus for full-up mission, aka “DRM1” was: 1.3m aperture,
Spacecraft Interface/Handling Ring Robert Besuner 12 August 2004.
WFIRST IFU -- Preliminary “existence proof” Qian Gong & Dave Content GSFC optics branch, Code 551.
After considerable pushing and shoving, this configuration show some promise. I have taken some liberties with the geometry and turned mounts inside-out.
Primary mirror Secondary mirror Spectroscopy focal plane Imager focal plane Beamsplitter Fully articulated solar panels and antenna Tertiary mirror Prism.
Robin Lafever1 JDEM Focal Plane Assembly Full-scale Mock up and Cold Plate Engineering model Prepared for Michael Levi and Henry Heetderks JDEM.
M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 1 Fabrication and assembly notes.
Henry Heetderks Space Sciences Laboratory, UCB
Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing.
Structural Practices Principles of Space Systems Design U N I V E R S I T Y O F MARYLAND Structural Design Practices Payload interfaces to launch vehicles.
S-17 Reference Model Status Robin Lafever 21 October 2004.
1 Shield and Fold Mirror Dimensions Michael Sholl 3 February 2005 MODIFIED by Robin Lafever 23 Feb 2005.
Lower Baffle Robert Besuner 26 August Background/Purpose This study follows on to 12 August study of the Spacecraft Interface/Handling Ring. —In.
Typical PSA cabinet used in these layouts is based on a Type A, Series 400 Stainless Steel unit from Terra Universal. Catalog cut is shown below. CAD Models.
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
Small Satellite Conference - GEMS Presentation August 12, 2009 Big Astrophysics in A Small Package Erin Walter GEMS Spacecraft Lead/Orbital.
As-built 09 April 2008 Cuore concrete support structure with jack screws in place Cuore site with elevator deck ready for installation 1 Robin Lafever.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
Extended Detector Cutoff Considerations WFIRST Project Office May
SuperNova / Acceleration Probe Thermal System Wes Ousley November 16, 2001.
ISWG - December 7, Destiny, The Dark Energy Space Telescope.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
From Cosmic Dreams - to Earthly Realities Niels Lund Danish National Space Center.
Fox-1 Thermal Design Dick Jansson, KD1K. Fox-1 Thermal Design Objective – Create a thermal environment that will enhance the performance of the electronic.
SNAP CCD packaging study Flex-fold Internal flexure frame Robin Lafever September 2003 CCD Aluminum Nitride Invar frame CRIC, Clocks Molybdenum frame CCD.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
STC "VOSKHOD", PROJECT "SPECTR-UV", JUNE 2006 Next slide Next slide Previous slide Possible layouts of Field Cameras.
EXTP Accomodation Study Hong Bin, Zhang Long Institute of Spacecraft System Engineering. CAST Oct 27th, 2015.
Solar Orbiter EUS: Thermal Design Progress Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Progress Bryan.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
Ares V an Enabling Capability for Future Space Science Missions H. Philip Stahl, Ph.D. NASA MSFC.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
Spacecraft Mockups Applied to SNAP M-21 Baseline Mockup.
Rose Navarro HMI Lead Thermal Engineer
Wide-Field Imager for Solar PRobe Plus (WISPR)
Maxim Pathfinder Prework 16 August 1999
Hawkeye Mechanical Design Snapshot
Henry Heetderks Space Sciences Laboratory, UCB
STARSHINE on Station Conceptual Configurations
LROC Meeting 2005/11/30 LRO CONCEPT-.
LRO CRaTER Preliminary Temperature Predictions Design A Concept  Old Concept April 12, 2005 Cynthia Simmons/ESS.
SOHO Instructions Cut out the lower bus bottom panels, sides, and top deck. Glue bottom panels together. Fold the side panels on the lines, bending tabs.
THERMAL CONTROL SYSTEM
Standardized CCD and MCT detector mounting configurations
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

WFIRST Large-cell structure concept design Preview Work in progress 3/4/2016Robin Lafever1

Shown here, is a Delta-4 Fairing, from an earlier model, rescued from the CAD warehouse.. 3/4/2016Robin Lafever2

WFIRST, as presented, will easily fit into a Delta-4 payload fairing, conforming to all clearances and stay- out zones. Note: the Hi-gain Antenna is in a negotiable zone. NBD The WFIRST payload includes the Telescope, Spacecraft Bus, and Payload attach fitting. The payload is shown in Launch configuration. 3/4/2016Robin Lafever3 Delta-4 fairing Telescope Spacecraft Bus Payload attach fitting ( Cover removed )

WFIRST in operational configuration 3/4/2016Robin Lafever4 ( Cover removed ) MLI (Gold) Solar Panels Radiators Hi-gain Antenna Spacecraft deck

WFIRST in operational configuration 3/4/2016Robin Lafever5 ( Cover removed ) MLI (Gold) Solar Panels Radiators Spacecraft deck Hi-gain Antenna

3/4/2016Robin Lafever6 Internal baffles Telescope Baffle structure Solar Panels Radiators Spacecraft deck Hi-gain Antenna

3/4/2016Robin Lafever7 Internal baffles High density baffles Optical Bench structure Radiators Spacecraft deck Hi-gain Antenna

3/4/2016Robin Lafever8 Internal baffles IR detector assembly High density baffles Optical Bench structure Focal Plane assembly And Shroud Radiators Spacecraft deck Hi-gain Antenna

3/4/2016Robin Lafever9 Internal baffles IR detector assembly High density baffles Optical Bench structure Focal Plane assembly And Shroud Radiators Spacecraft deck Hi-gain Antenna

3/4/2016Robin Lafever10 Internal baffles IR detector assembly High density baffles Optical Bench structure Focal Plane assembly And Shroud 5-sided Ti Box hardpoint, Typical for all optical mounts. Note cell structure. Instrument deck Hi-gain Antenna

3/4/2016Robin Lafever11 Internal baffles IR detector assembly High density baffles Optical Bench structure Focal Plane assembly And Shroud Instrument deck Spacecraft deck Hi-gain Antenna

3/4/2016Robin Lafever12 Internal baffles IR detector assembly High density baffles Optical Bench structure Focal Plane assembly And Shroud Instrument deck Spacecraft deck Hi-gain Antenna

3/4/2016Robin Lafever13 Internal baffles IR detector assembly High density baffles Optical Bench structure Focal Plane assembly And Shroud Instrument deck Spacecraft deck Hi-gain Antenna

3/4/2016Robin Lafever14 Internal baffles IR detector assembly High density baffles Optical Bench structure Focal Plane assembly And Shroud Radiators Spacecraft deck Hi-gain Antenna