INTERFACING ETCS WITH LEGACY CC-SYSTEMS TRACK - SIDE.

Slides:



Advertisements
Similar presentations
Migration Considerations and Techniques to MPLS-TP based Networks and Services Nurit Sprecher / Nokia Siemens Networks Yaacov Weingarten / Nokia Siemens.
Advertisements

Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST.
Ivan Tuháček UIC ERTMS World Conference, Istanbul 2014
Marmaray A Solution for a High-speed, Cross-urban Application
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
Pardubice, Czech Republic - 25 Oct 2004
Modern testing methodologies and their added values Vito CALIANDRO SIGNALLING PRODUCT LINE MANAGER.
Thales Axle Counter The Challenges for a modern Train Detection System
Technologies used in telecommunication networks
© Invensys 00/00/00Invensys proprietary & confidentialSlide 1.
Amtrak Advanced Civil Speed Enforcement PTC System Status Report
Data and Computer Communications
I/O Channels I/O devices getting more sophisticated e.g. 3D graphics cards CPU instructs I/O controller to do transfer I/O controller does entire transfer.
Data and Computer Communications
TMP 205 rev.00 La gestione del traffico ferroviario con le nuove tecnologie satellitari Come GALILEO puo’ contribuire a rendere piu’ efficienti le linee.
SATLOC – state of the art George Barbu – Union Internationale des Chemins de Fer Satellite based operation and management of local low traffic lines.
SCADA and Telemetry Presented By:.
Technique for assuring that a transmitting entity does not overwhelm a receiving entity with data Necessary when data is being sent faster than it.
1 Satisfiability Testing in the Railway Industry Simon Chadwick Head of Research Westinghouse Rail Systems Limited, Chippenham, UK SAT2009 Twelfth International.
A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based.
Management Information Systems Lection 04 Networks CLARK UNIVERSITY College of Professional and Continuing Education (COPACE)
May 20, 2008 Train Detection 1 Train Detection Systems Mid-States Highway-Rail Grade Crossing Safety Conference Session 4 Use of New Technology for Highway-Rail.
ARRC Collision Avoidance System
ERTMS state of the art and evolution of the applications considering customer’s orientations.
Communication Based Train Control
1 Product & Technology Quality Excellence Support American Global Products Product & Technology TeSysPort Ethernet Interface for TeSys June 5, 2007.
Peter Gurník, Oldřich Trégl Satellite based train location.
Flexible, Modular Interlocking Systems for a modern railway network
 AUTOMATION  PLC  SCADA  INSTRUMENTATION  DRIVES & MOTORS.
10/14/2015 2:14 AM1 LAN Overview (5.1) CSE 3213 Fall 2011.
Introduction to Software Development. Systems Life Cycle Analysis  Collect and examine data  Analyze current system and data flow Design  Plan your.
Convergence Technology. Ch 01 Telecom Overview  Define communications and telecommunications  Components of a communications system  Difference between.
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
Internet 0 for Industrial Applications Fred Cohn 13-Dec-07.
EURAILSPEED - Milano – November 8th, 2005 MGV SNCF Train Set for on-board Measurement at Great Velocity Eric REBEYROTTE– Technical Manager of SNCF Engineering.
18. December 2006 Banedanmark Draft Signalling implementation plan.
Signalling: Convergence of needs
Right on Track towards a safe and interoperable Europe? 2 April 2014 Luc Lallemand Vice President EIM CEO Infrabel Belgium Rail Infrastructure Manager.
UIC ERTMS World Conference ERTMS Baselines Pio GUIDO, Head of ERTMS Unit Istanbul, 2 April 2014.
ROLE OF SIGNALLING IN RAILWAYS
Network Media Guided Media ( transmit the data over a wire)
A. Magnien - 1/12/2003 ERTMS on the PBKAL corridor Financial analysis, a first step Dec. 3, 2003.
Railway Demonstration. 2 Low-Density Traffic Lines * n Single track, few trains/day –High safety requirements –High installation and maintenance costs.
Dr. John P. Abraham Introduction to Computer Networks INTRODUCTION TO COMPUTER NETWORKS.
UIC ERTMS Conference 2006 Importance of infill functionality for the performance behavior and safety ÖBB Infrastruktur Betrieb AG - Netztechnik August.
UIC ERTMS Conference - Budapest 4 th -6 th April 2006 STRATEGY AND EXPERIENCES OF THE ERTMS DEPLOYMENT IN SPAIN Antonio Domínguez Chala ADIF.
CERTIFER 1 J.P PRONOSTP.OZELLO UCI ERTMS CONFERENCE BUDAPEST.
To Create a Better Life through Green Network ERTMS Application in Korean Railroad
1 Date UK Rail Train Comms & RFID Tim Lane – Network Rail Telecoms.
ERTMS Strategy Group Agenda Item 3 – Key Strategic Issues 11 th April th April 2006.
Programmable Logic Controller & Distributed Control System Yoon-Je Choi 17 th June 2006.
ETCS Level 1 Deployment in Luxembourg UIC ERTMS CONFERENCE 2006 BUDAPEST François JAEGER Director CFL Member of the CFL board of.
An overview of I&C Systems in APR 1400 Parvaiz Ahmed Khand December 28, 2007.
ERTMS/ETCS BENEFITS FOR RAILWAYS WORLD WIDE Norwin Vögeli
// Eating the Elephant ETCS Requirements for GB railway.
Data and Computer Communications Eighth Edition by William Stallings Chapter 1 – Data Communications, Data Networks, and the Internet.
Singapore Downtown Line (SIGNALLING - SIRIUS)
5/16/2018 ERTMS/ETCS - the European Rail Traffic Management System David Gillan Chairman, UNISIG Director, Business Development, Invensys Rail Systems.
Communications in Railway Centralized Traffic Control Systems
ERTMS Application on Tests and Maintenance
Innovation solution for a decommissioning strategy of the class B:
ATO over ETCS Benoît BIENFAIT 10/2/2016.
EU / Russia – interoperable Automatic Train Protection
Designed-in Logic to Ensure Safety of Integration and Field Engineering of Large Scale CBTC Systems Author: Fenggang Shi.
Fiber Optic Communication By
Panel 1: “ERTMS, deployment, results, advantages, “game changers”
EU / Russia – interoperable Automatic Train Protection
WANs and Routers Module 1: WANs & Routers.
Railway Conference Pardubice
Principles of Information Technology
Presentation transcript:

INTERFACING ETCS WITH LEGACY CC-SYSTEMS TRACK - SIDE

2 NEED FOR MIGRATION Elimination of National Systems and their replacement with ETCS – In most cases coming to the end of their life cycle. Two different strategies: – All train first, then trackside straight to ETCS in a big – bang. – Trackside dual (or triple fitted) as an overlay, then gradual fitting of trains. Need to interface to National Systems. Need to replace or enhance the existing Signalling Systems

3 MIGRATION STRATEGIES GRADUAL MIGRATION – Maintain the existing ATP National System – Trains equipped with ETCS STM national system – Automatic switch over can be performed (national function) Full ATP national system – No Automatic switch over. Only under special design of dedicated interface LEVEL 2- LEVEL 1 NATIONAL

4 MIGRATION STRATEGIES GRADUAL MIGRATION – It allows progressive ETCS implementation On board Trackside – ATP national system as a fall back during a period as desired – It allows a mixed traffic of equipped and non equipped trains – No need of special interface between ETCS/ATP track side Eurobalises for beginning and end of ETCS territory Existing National SystemETCS L1 or L2

5 MIGRATION STRATEGIES Spanish experience – Trains equipped with ETCS L1 and L2 and complete independent ASFA national system (no STM) ASFA National System ETCS L1 ETCS L2

6 INTERFACES Interfaces ETCS L1, L2 / existing signalling systems – Relay type interlockings – Line side signals – Electronic interlockings – CTC ETCS level 2/Level 1 RBC EURO- BALISE LEU Interlocking LEU EURO- BALISE

7 INTERFACES

8 ETCS/SIGNALLING INTERFACES ETCS level 1 – Relay type interlocking/Track side elements LEU, discrete Interface with parallel inputs Direct wiring to any interlocking or signal aspects LEUs centralized at relay room (1) LEUs line side installed (2) Relatively simple interface No LEUs interconnection Max. speed determined by line side signals No centralized TSR´s LEU Interlocking SIGNAL LAMPS I/F 1 2

9 INTERFACES ETCS level 1 – Relay type Interlocking – LEU Networked version TCP/IP suitable for fibre optic comms. links to interlocking and Control Centre Temporary Speed Restrictions direct from Control Centre – Remote Maintenance and Diagnosis – Max. speed can be higher 4 Balises / LEU LEU LEUs CONCENTRATOR INTERLOCKING LEU TDM PARALLEL I/O

10 INTERFACES ETCS level 1 – Electronic Interlocking – LEU Networked version – Non standard interface Manufacturer's owned. LEU LEUs CONCENTRATOR INTERLOCKING LEU TCP/IP

11 INTERFACES ETCS level 2 – Relay type Interlocking RBC Interlocking VITAL PARALLEL INPUTS TDM Safety Interface Vital parallel I/O Transmission Digital module Serial vital comms protocol Non standard Manufacturer's owned Technically feasible Operationally not advisable Maintenance Investment Lifecycle

12 INTERFACES ETCS level 2 – Electronic Interlocking – Serial Interface – Vital communications protocol – Non standard interface Manufacturer's owned Signalling LAN RBC INTERLOCKING

13 INTERFACES ETCS level 2 – Electronic IL. Spanish experience – Westrace comms protocol has been implemented into Alcatel´s RBC in Spanish HS lines: La Sagra – Toledo; Segovia – Valladolid; Lérida – Barcelona – Invensys RBC comms protocol has been implemented into Alcatel´s Intersig interlocking in Córdoba – Málaga HS line – Westrace comms protocol has been implemented into Siemens CBTC in L9 driverless Barcelona Metro Interlocking protocol RBC Interlocking RBC protocol RBC Interlocking

14 INTERFACES ETCS Level 2 – Level 2. Different manufacturers – RBC - RBC Safe Communication Interface is being specified within UNISIG. Signalling LAN RBC UNISIG SUBSET – 039. FIS for RBC - RBC handover. UNISIG SUBSET – 098. RBC – RBC Safe Comm. Interface. UNISIG SUBSET – 099. RBC – RBC Test specification for Safe Comm. I/F

15 INTERFACES ETCS level 2 – Level 1 – Crossing from Level 2 to Level 1 is performed automatically on board (national function) – Eurobalises marking the border of Levels 1 an 2 ETCS L1ETCS L2

16 INTERFACES ETCS L1 ETCS L2 ETCS level 2 – Level 1 – L2 overlapping L1 – L1 used as fallback system – Automatic switch over as national function

17 INTERFACES ETCS level 1 / level 2 - CTC INTERLOCKING CLC hot stand by LEU Eurobalises ETCS LEVEL 1 EQUIPMENT ERTMS – CENTRAL EQUIPMENT RBC JRU LOCAL OPERATION LEVEL 2 LEVEL 1 ETCS comms Interface CTC ETCS Central Control ETCS comms protocol Manufacturer's owned SIL 2 comms

18 CONCLUSIONS GRADUAL MIGRATION – Maintain the existing ATP National System during migration period ETCS Level 1 – Advantages Overlays existing signalling with minimal change GSM-R not required Interoperability now well proven On-board is compatible with higher levels (add radio) – Disadvantages No capacity improvement (can be negative unless in-fill is fitted) High Cost (Line side Electronic Unit + in-fill+ cabling) Trackside does not migrate easily to higher levels ETCS Level 2 with SIGNALS – Advantages Overlays on existing train protection Balises become fixed (no trackside electronics) – Disadvantages GSM-R is required Radio coverage may need to be improved over voice

19 CONCLUSIONS ETCS Level 2 WITHOUT SIGNALS – Advantages Cab-signalling system with cost savings Significant capacity increases through variable train detection sections – Disadvantages All trains need to be fitted Radio based cab-signalling of this complexity is new to the mainline railway industry Fall back system requested? – High density traffic lines – Low traffic lines Signalling Systems – Cost effective solutions/technical feasibility Gradual enhancement Replacement