E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi,

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' July 27 meeting Global Design Effort 1 Low Power RF Tests (3) in S1-G.
Advertisements

E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
of LFD Compensation Study S1 Global Cryomodule
Lutz Lilje DESY -MPY- XFEL Tuner Lorentz Force Detuning System Setup New Saclay design.
Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
Capture Cavity 2 Update Tim Koeth April 3 rd Testing at 4.5K.
Cost comparison of tuners H. Hayano, KEK AWLC14
Shuichi Noguchi, KEK6-th ILC School, November Auxiliary Components  Input Power Coupler  HOM Dumping Coupler  Frequency Tuner  He Jacket  Magnetic.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
R&D on Cavity Integration and Test H. Hayano,
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
Qualification Tests for the ILC Blade-Tuner Carlo Pagani University of Milano & INFN Milano - LASA Material prepared by: Rocco Paparella & Angelo Bosotti.
Shuichi Noguchi,SRF2007,10.71 New Tuners for ILC Cavity Application Shuichi Noguchi KEK.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
ILC FAST TUNER R&D PROGRAM at FNAL Status Report CC2 Piezo Test Preliminary Results Ruben Carcagno (on behalf of the FNAL FAST TUNER Working Group) 4/5/06.
E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 1 Cavity string assembly at KEK for S1-Global Eiji Kako (KEK, Japan)
Shuichi NoguchiHayama ILC Lecture, Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance 
E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 1.
E.Kako (KEK) 2009.Dec. 26 1 S1-Global Cryomodule Overview No connection No beam tube No gate-valve Closed by Blind Flange Gate-valve Pumping system Pumping.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
ALCPG11 1 Comparison of Tuner Performance in S1-G Cryomodule Rocco Paparella, on behalf of S1-Global team.
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)
GDE 4/Mar/20081 Lorentz Detuning Calculation for the transient response of the resonant cavity Introduction “Two modes” model Method of the.
20 October 2010 – C.Pagani IWLC S1-Global Tuner Performance Study Carlo Pagani, on behalf of INFN Milan team.
KEKB crab RF architecture & controls K.Nakanishi KEK Dec. 16, 2010 LHC-CC10 1.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
Hayama ILC Lecture, , Shuichi Noguchi 1 Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance.
Tuner, Coupler WP & specification table H. Hayano, KEK GDE Sendai.
SLIM BLADE TUNER. Modifications & Reliability. Lessons learned from FNAL’s Cryomodule #2 & S1-Global Presented by Yuriy Pischalnikov (FNAL) S1-Global tuners.
SLIM BLADE TUNER. Modifications & Reliability. Lessons learned from FNAL’s Cryomodule #2 & S1-Global Presented by Yuriy Pischalnikov for FNAL Tuner team.
Warren Schappert Yuriy Pischalnikov FNAL SRF2011, Chicago.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
SRF Cavities Resonance Control FNAL experience Presented by Yuriy Pischalnikov for Resonance Control Group Fermilab- Los Alamos MaRIE Project Meeting March.
Shuichi Noguchi, KEKTTC Meeting at IHEP Beijin, Slide Jack Tuner.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
SRF Cavities Resonance Control. CW mode of operation (FNAL’s experience). Yu. Pischalnikov W. Schappert FNAL TTC CW SRF Meeting, Cornell University, 12June,
S1G Experiment Schedule Plan
ILC10 Beijing Global Design Effort
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
R. Paparella, INFN-Milan, LASA Laboratory, Segrate, Italy
SCRF 21-25/Apr/2008 Measurement & Calculation of the Lorentz Detuning for the transient response of the resonant cavity Introduction “Two.
S1-G for TTC meeting Global Design Effort
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
LCLS II SRF Cavity Tuner (developed by FNAL)
Tuner system Zhenghui MI 2017/01/17
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Vertical Test System and T-mapping/X-ray-mapping at KEK-STF
Tuner system for CEPC MI Zhenghui 2016/09/14
Construction and First Coo-down Test of cERL Injector Cryomodule
TTC meeting, Milano Global Design Effort
Cavity Degradation Experience at S1-Global
Presentation transcript:

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi, M. Satoh, T. Shishido, K. Watanabe, Y, Yamamoto N. Ohuchi, Y. Kojima, H. Nakai, T. Matsumoto (KEK, Japan) C. Pagani, A. Bosotti, R. Pararella (INFN, Italy) Y. Pischalnikov (FNAL, USA)

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 2 Low power rf tests in S1-G 2010, June - July

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 3 Low power rf tests in S1-G. Stroke of motor tuner. Q L of variable input coupler. Adjustment of fo = MHz QL = 3.0 x Calibration of Qt, monitor coupler. HOM filter property. Qext of HOMs. Stroke and hysteresis of piezo tuner. Single pulse response of piezo tuner. Multi-pulse response of piezo tuner. Stability and reproducibility of fo. Mechanical vibration modes (cw). Damping of mechanical vibration. FFT analysis of mechanical vibration. Cross-talk of vibr. between two cavities

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 4 Low power rf tests in S1-G Four types of frequency tuning system with piezo tuner Two types of input couplers with variable coupling Blade Tuner / center (FNAL) Saclay Tuner / end (DESY) Slide-Jack Tuner / center Slide-Jack Tuner / end (KEK) TTF-III Coupler (DESY/FNAL)STF-II Coupler (KEK)

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 5 Stroke of Motor Tuner Cryomodule - CCryomodule - A Trouble of two motor tuners occurred in C2/ACC011 (Blade) and A4/MHI-09 (Slide-Jack/end) !! MHz MHz MHz

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 6 Blade Tuner for FNAL Cavities C2/ACC011 cavity Blade tuner does not work. One piezo does not go > +110V.

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 7 Slide-Jack Tuner for KEK Cavities A4/MHI-09 cavity Slide-Jack tuner does not work.

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 8 Q L of Variable Input Coupler 3. X 10 6 Cryomodule - CCryomodule - A Q L = 2.0 ~ 8. x 10 6 (FNAL) Q L = 1.3 ~ 4. x 10 6 (DESY) Q L = 2.0 ~ 4. x 10 6 (KEK)

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 9 Adjustment of Frequency and Q L Cavity Frequency Loaded Q (Q L ) 1. C1/AES MHz 3.02 x C2/ACC MHz 3.01 x C3/Z MHz 3.04 x C4/Z MHz 3.01 x A1/MHI MHz 2.93 x A2/MHI MHz 2.95 x A3/MHI MHz 2.96 x A4/MHI MHz 3.05 x 10 6

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 10 Calibration of Q t, Q HOM1, Q HOM2 Cavity Q t Q t (VT) error Q HOM1 Q HOM2 1.C1/AES x x % 6.08 x x C2/ACC x x % 9.45 x x C3/Z x x % 9.23 x x C4/Z x x % 4.93 x x A1/MHI x x % 1.90 x x A2/MHI x x % 1.53 x x A3/MHI x x % 9.27 x x A4/MHI x x % 9.96 x x10 13 error of Q t = -20 / +28 % Q HOM1, Q HOM2 > 1 x10 12, OK

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 11 Hysteresis of Piezo Tuner (Cryo-A) 50Hz/div 100Hz/div50Hz/div 50W RF Amp. + PLL (Vpiezo = 0 ~ +500V) 200Hz 350Hz 450Hz A1; MHI-05 KEK A3; MHI-07 KEK A2; MHI-06 KEK A4; MHI-09 KEK

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 12 Hysteresis of Piezo Tuner (Cryo-C) 50W RF Amp. + PLL (Vpiezo = 0 ~ +200V) C1; AES004 FNAL C2; ACC011 FNAL C3; Z108 DESY C4; Z109 DESY 500Hz/div200Hz/div 2500Hz 600Hz 1000Hz Breakdown at 110V

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 13 Pulse Response by Pezo Tuner (Cryo-A) Piezo Drive Frequency = 250 Hz  Pt Piezo Drive Pulse (freq., Vpp) Single Pulse Response (parameters ; frequency ; amplitude ; delay time)

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 14 Single Pulse Response (Cryo-A) A1; MHI-05 KEK A2; MHI-06 KEK A3; MHI-07 KEK A4; MHI-09 KEK 50W RF Amp. + PLL (Vpiezo = 470V, 400Hz) 270Hz 450Hz 470V

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 15 Single Pulse Response (Cryo-C) C4; Z109 DESY C2; ACC011 FNAL C1; AES004 FNAL C3; Z108 DESY 1000Hz 600Hz 1100Hz 1200Hz 135V100V 180V170V 50W RF Amp. + PLL (Vpiezo : 400Hz)

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 16 Single Pulse Response (Cryo-A + Cryo-C) DESY Saclay tuner 1 piezo (2  F) FNAL Blade tuner 2 piezo (4  F) KEK Slide-Jack tuner 1 piezo (0.2  F)

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 17 Mechanical Vibration Modes (Cryo-A) A1/MHI-05A2/MHI-06 A3/MHI-07A4/MHI-09 Pt  Vpiezo 10 o /div. 500V 250V 5 Hz 250 Hz 5 pulse 250 Hz 5 pulse 250 Hz 5 pulse 250 Hz 5 pulse Pt  Vpiezo

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 18 Mechanical Vibration Modes (Cryo-C) C1/AES004C2/ACC011 C3/Z108C4/Z109 Pt  Vpiezo 10 o /div. 25 o /div. 10 o /div. 25V 5 Hz 250 Hz 5 pulse 250 Hz 5 pulse 250 Hz 5 pulse 250 Hz 5 pulse Pt  Vpiezo

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 19 Mechanical Vibration Modes (Cryo-A&C) CW mode measurementSingle-pulse mode measurement C4/Z109: Vpiezo = +40V, 1kHz A2/MHI-06: Vpiezo = +200V, 1kHz 5 o /div. FFT Analysis FFT Analysis 100ms/div. 4ms/div. Vpiezo = +100V, 100Hz, cw A4/MHI-09: Pt   Frequency sweep, manually

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 20 Mechanical Vibration Modes (Cryo-A) Vpiezo = +200V (CW) 536Hz 351Hz 246Hz Vpiezo = +200V, 1 kHz (1 pulse) 227Hz 318Hz521Hz 378Hz 535Hz 516Hz 323Hz 225Hz A1/MHI-05 A2/MHI-06 A1/MHI-05 A2/MHI-06

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 21 Mechanical Vibration Modes (Cryo-A) Vpiezo = +200V (CW) 206Hz 298Hz Vpiezo = +200V, 1 kHz (1 pulse) 571Hz 382Hz 330Hz 326Hz 459Hz 561Hz 194Hz 297Hz A3/MHI-07 A4/MHI-09 A3/MHI-07 A4/MHI-09

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 22 Mechanical Vibration Modes (Cryo-C) Vpiezo = +15V (CW) 201Hz 354Hz 504Hz 345Hz 168Hz126Hz 529Hz Vpiezo = +40V, 1 kHz (1 pulse) 345Hz 179Hz 509Hz 356Hz 204Hz C1/AES004 C2/ACC011

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 23 Mechanical Vibration Modes (Cryo-C) Vpiezo = +15V (CW) 320Hz 261Hz 246Hz 332Hz Vpiezo = +40V, 1 kHz (1 pulse) 260Hz 322Hz 448Hz 245, 252Hz 313Hz 436Hz C3/Z108 C4/Z109

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 24 Propagation of Mechanical Vibration Pt  Vpiezo Pt  Vpiezo  A1/A2 (KEK) C3/C4 (DESY) C1/C2 (FNAL) A3/A4 (KEK) 10 o /div. 250Hz, 40V 200Hz, 40V 330Hz, 400V 535Hz, 400V A1 A2 C3C1 A3 A4 C2C4 100ms/div. 1 o /div.

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 25 Microphonic vibration A1/MHI-05 (KEK)A3/MHI-07 (KEK) C1/AES004 (FNAL)C3/Z108 (DESY) 222Hz326Hz 25Hz252Hz

E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 26 Schedule of High Power Tests