ROC managers meeting, Barcelona, 15-16.1.06 Luciano Gaido (thanks to Paolo Veronesi for the slides) ROC-IT status.

Slides:



Advertisements
Similar presentations
– n° 1 Review resources access policy, procedures, rules and challenges: The Italian experience and future challenges Antonia Ghiselli INFN-CNAF Workshop.
Advertisements

LCG Tiziana Ferrari - SC3: INFN installation status report 1 Service Challenge Phase 3: Status report Tiziana Ferrari on behalf of the INFN SC team INFN.
Deployment Team. Deployment –Central Management Team Takes care of the deployment of the release, certificates the sites and manages the grid services.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Consistency of Accounting Information with.
– n° 1 VO Magic – Planck – Compchem in the production infrastructure.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
08/11/908 WP2 e-NMR Grid deployment and operations Technical Review in Brussels, 8 th of December 2008 Marco Verlato.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Pilot Test-bed Operations and Support Work.
Quarterly report SouthernTier-2 Quarter P.D. Gronbech.
Grid Infrastructure for the ILC Andreas Gellrich DESY European ILC Software and Physics Meeting Cambridge, UK,
LCG Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete 1 Service Challenge Phase 4: Piano di attività e impatto sulla.
Enabling Grids for E-sciencE The INFN GRID Marco Verlato (INFN-Padova) EELA WP2 E-infrastructure Workshop Rio de Janeiro, August 2007.
Fabric Monitor, Accounting, Storage and Reports experience at the INFN Tier1 Felice Rosso on behalf of INFN Tier1 Workshop sul.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks WMSMonitor: a tool to monitor gLite WMS/LB.
EGEE is a project funded by the European Union under contract IST Support Operation Challenge – 1 SOC-1 Alistair Mills Torsten Antoni ARM-4,
Certification and test activity IT ROC/CIC Deployment Team LCG WorkShop on Operations, CERN 2-4 Nov
Jürgen Knobloch/CERN Slide 1 A Global Computer – the Grid Is Reality by Jürgen Knobloch October 31, 2007.
FP6−2004−Infrastructures−6-SSA EUChinaGrid Infrastructure Giuseppe Andronico - INFN Catania Concertation Meeting – Budapest,
Eine Einführung ins Grid Andreas Gellrich IT Training DESY Hamburg
Fabric Monitoring at the INFN Tier1 Felice Rosso on behalf of INFN Tier1 Joint OSG & EGEE Operations WS, Culham (UK)
EGEE is a project funded by the European Union under contract INFSO-RI SA1 All Activity Meeting 13 September 2004 Ian Bird, Cristina Vistoli and.
Grid DESY Andreas Gellrich DESY EGEE ROC DECH Meeting FZ Karlsruhe, 22./
LCG Storage Accounting John Gordon CCLRC – RAL LCG Grid Deployment Board September 2006.
HLRmon accounting portal DGAS (Distributed Grid Accounting System) sensors collect accounting information at site level. Site data are sent to site or.
Recent improvements in HLRmon, an accounting portal suitable for national Grids Enrico Fattibene (speaker), Andrea Cristofori, Luciano Gaido, Paolo Veronesi.
Certification and test activity ROC/CIC Deployment Team EGEE-SA1 Conference, CNAF – Bologna 05 Oct
INFSO-RI Enabling Grids for E-sciencE RDIG - Russia in EGEE Viatcheslav Ilyin RDIG Consortium Director, EGEE PMB SINP MSU (48),
INFSO-RI Enabling Grids for E-sciencE The EGEE Project Owen Appleton EGEE Dissemination Officer CERN, Switzerland Danish Grid Forum.
tons, 150 million sensors generating data 40 millions times per second producing 1 petabyte per second The ATLAS experiment.
EGEE is a project funded by the European Union under contract INFSO-RI Grid accounting with GridICE Sergio Fantinel, INFN LNL/PD LCG Workshop November.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America The EELA Grid Infrastructure Roberto Barbera.
M. Cristina Vistoli EGEE SA1 Organization Meeting EGEE is proposed as a project funded by the European Union under contract IST Regional Operations.
HLRmon accounting portal The accounting layout A. Cristofori 1, E. Fattibene 1, L. Gaido 2, P. Veronesi 1 INFN-CNAF Bologna (Italy) 1, INFN-Torino Torino.
Enabling Grids for E-sciencE Experience Supporting the Integration of LHC Experiments Computing Systems with the LCG Middleware Simone.
INFN GRID Production Infrastructure Status and operation organization Cristina Vistoli Cnaf GDB Bologna, 11/10/2005.
INFSO-RI Enabling Grids for E-sciencE Operations Parallel Session Summary Markus Schulz CERN IT/GD Joint OSG and EGEE Operations.
INFSO-RI Enabling Grids for E-sciencE Round the regions ROC managers Lyon.
IT-INFN-CNAF Status Update LHC-OPN Meeting INFN CNAF, December 2009 Stefano Zani 10/11/2009Stefano Zani INFN CNAF (TIER1 Staff)1.
The INFN Grid Project Successful Grid Experiences at Catania Roberto Barbera University of Catania and INFN Workshop CCR Rimini,
1 GRID – Stato dell’arte Alessandro Paolini (INFN-CNAF) Workshop della Commissione Calcolo e Reti dell'INFN Laboratori Nazionali del Gran Sasso 10 – 13.
LCG Workshop User Support Working Group 2-4 November 2004 – n o 1 Some thoughts on planning and organization of User Support in LCG/EGEE Flavia Donno LCG.
II EGEE conference Den Haag November, ROC-CIC status in Italy
– n° 1 Grid di produzione INFN – GRID Cristina Vistoli INFN-CNAF Bologna Workshop di INFN-Grid ottobre 2004 Bari.
INFN Grid – Referee Meeting Enabling Grids for E-sciencE Bolgona, 6-7 Marzo 2007 Testbeds e infrastruttura di produzione C.Aiftimiei – INFN-PADOVA D.Cesini.
Daniele Cesini - INFN CNAF. INFN-CNAF 20 maggio 2014 CNAF 2 CNAF hosts the Italian Tier1 computing centre for the LHC experiments ATLAS, CMS, ALICE and.
1/3/2006 Grid operations: structure and organization Cristina Vistoli INFN CNAF – Bologna - Italy.
INFSO-RI Enabling Grids for E-sciencE Resource allocation and negotiation update C. Vistoli, R. Rumler Operations workshop Bologna.
Jürgen Knobloch/CERN Slide 1 Grid Computing by Jürgen Knobloch CERN IT-Department Presented at Physics at the Terascale DESY, Hamburg December 4, 2007.
HLRmon Enrico Fattibene INFN-CNAF 1EGI-TF Lyon, France19-23 September 2011.
Using HLRmon for advanced visualization of resource usage Enrico Fattibene INFN - CNAF ISCG 2010 – Taipei March 11 th, 2010.
WorkShop 2007 sul Calcolo e Reti dell'INFN Enabling Grids for E-sciencE Rimini, 7-11 Maggio 2007 Operation and Support at INFN-GRID Daniele Cesini – INFN-CNAF.
The status of IHEP Beijing Site WLCG Asia-Pacific Workshop Yaodong CHENG IHEP, China 01 December 2006.
NERSC/LBNL at LBNL in Berkeley October 2009 Site Report Roberto Gomezel INFN 1.
INFN-Grid WS, Bari, 2004/10/15 Andrea Caltroni, INFN-Padova Marco Verlato, INFN-Padova Andrea Ferraro, INFN-CNAF Bologna EGEE User Support Report.
– n° 1 The Grid technology and infrastructure in Italy present and future Cristina Vistoli INFN CNAF, Bologna Italy.
– n° 1 The Grid Production infrastructure Cristina Vistoli INFN CNAF.
Servizi core INFN Grid presso il CNAF: setup attuale
INFN Grid Project Targets, organisation, procedures
Job monitoring and accounting data visualization
Support Operation Challenge – 1 SOC-1 Alistair Mills Torsten Antoni
LCG Service Challenge: Planning and Milestones
Giuseppe Andronico INFN Catania
INFN-GRID: Stato ed Organizzazione
Technical Board Meeting, CNAF, 14 Feb. 2004
GRID activities INFN/CNAF
Presenter (on behalf of the authors): Cristina Vistoli
INFN – GRID status and activities
The INFN TIER1 Regional Centre
HLRmon accounting portal
The INFN-GRID RLS A. Cavalli - INFN-CNAF
Presentation transcript:

ROC managers meeting, Barcelona, Luciano Gaido (thanks to Paolo Veronesi for the slides) ROC-IT status

ROC managers meeting, Barcelona, Luciano Gaido, INFN-Torino 2 Summary ● GRID-IT resource centers ● Supported VOs ● Statistics about GRID-IT usage ● Grid CORE services ● Statistics about RBs usage at CNAF ● ROC shifts

ROC managers meeting, Barcelona, Luciano Gaido, INFN-Torino 3 Grid-IT Resource Centers 29 Sites INFN + INFN-T1 3 SPACI 1 ENEA 1 ESA 1CNR 1 SNS 1 INAF 1 ITB 1 Uni Perugia 40 GRID-IT 27 EGEE/LCG

ROC managers meeting, Barcelona, Luciano Gaido, INFN-Torino 4 Supported VOs 11 Italian 4 LHC 6 Other 2 Cert 23 supported VOs

ROC managers meeting, Barcelona, Luciano Gaido, INFN-Torino 5 Jobs/Day (Sept to Dec 2005) Daily average: ~6600 INFN-T1 not included Daily average: ~3200

ROC managers meeting, Barcelona, Luciano Gaido, INFN-Torino 6 Jobs/Site (Sept to Dec 2005) ~ jobs~ jobs INFN-T1 not included

ROC managers meeting, Barcelona, Luciano Gaido, INFN-Torino 7 Jobs/VO (Sept to Dec 2005) ~ jobs ~ jobs INFN-T1 not included

ROC managers meeting, Barcelona, Luciano Gaido, INFN-Torino 8 CPU time/VO (Sept to Dec 2005) ~ 98 years, 2 month, 18 days~ 358 years, 7 months, 11 days INFN-T1 not included

ROC managers meeting, Barcelona, Luciano Gaido, INFN-Torino 9 CORE services in the production grid ● 8 RBs (with DGAS support) ● 1 VOMS server (12 VOs supported) ● 4 GridICE servers ● 7 BDIIs ● 1 RLS (12 VOs supported, moving to LFC) ● 2 LFC servers (1 installation in progress, 12 VOs supported as central catalog) ● 1 MYPROXY server (several RBs supported) ● 3 HLR servers (1 installation in progress) ● Many other resources for SC, testing and development purpose (only at CNAF ~200 hosts, many other ones in TO, PD)

ROC managers meeting, Barcelona, Luciano Gaido, INFN-Torino 10 CNAF RBs usage (Sept to Dec 2005) LHC % IT % CERT139384% OTHER % TOT % VOJob #Job % Alice % Atlas83382% Cms % Lhcb9920% VOJob #Job % Bio140504% Compchem1080% Enea4490% Gridit176945% Inaf17820% Ingv % Planck260% Theophys33781% Virgo32361% VOJob #Job % Babar % Biomed % Cdf00% Esr00% Magic00% Zeus00% VOJob # Job % Dteam95583% Infngrid43801%

ROC managers meeting, Barcelona, Luciano Gaido, INFN-Torino 11 ROC shifts

ROC managers meeting, Barcelona, Luciano Gaido, INFN-Torino 12 Links ● INFN Production Grid ● Italian ROC Ticketing System ● Italian ROC Monitoring ● Italian GridICE server ● Service Challenge 4 Service Definition