Debuncher Stochastic Cooling Paul Derwent March 3, 2016.

Slides:



Advertisements
Similar presentations
Stephen Benson U.S. Particle Accelerator School January 28, 2011 Establishing Lasing in the FEL* * This work was supported by U.S. DOE Contract No. DE-AC05-84-ER40150,
Advertisements

C. Dimopoulou A. Dolinskii, T. Katayama, D. Möhl, F. Nolden,
Pulse Techniques. Off-Resonance Effects Initial magnetization along z x-pulse (  = 0) On-resonance: M z -> -M y Off-resonance: phase 
Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
Measurements of adiabatic dual rf capture in the SIS 18 O. Chorniy.
DDC Signal Processing Applied to Beam Phase & Cavity Signals
Electron Cooling in the Accumulator McGinnis Electron Cooling in the Accumulator Dave McGinnis.
Bunch shape monitor for Linac-4 A.V.Feschenko Institute For Nuclear Research (INR), Moscow , Russia.
Run 2 PMG 2/16/06 - McGinnis Run II PMG Stacking Rapid Response Team Report Dave McGinnis February 16, 2006.
Beam line characterization with the TOFs1 Demonstrating the emittance-momentum matrix Mark Rayner, CM26 California, 24 March Initial.
RF Synchronisation Issues
The Fermilab Antiproton Source Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab 3 December 2007.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Spectrum Analyzer Basics Copyright 2000 Agenda Overview: What is spectrum analysis? What measurements do we make? Theory of Operation: Spectrum analyzer.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
Paul Derwent 18-Oct-15 1 Stochastic Cooling in the Fermilab AntiProton Source Paul Derwent Beams Division/Pbar/CDF Sunday, October 18, 2015.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Eric Prebys, FNAL. USPAS, Knoxville, TN, January 20-31, 2014 Lecture 20 - Cooling 2 Anti-protons are created by hitting a target with an energetic proton.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
Debuncher “phase jump” project Decouple Debuncher RF frequency from MI 120 GeV frequency – MHz could move by ~1-2 kHz –Can center beam in Debuncher.
Quantitative Optimisation Studies of the Muon Front-End for a Neutrino Factory S. J. Brooks, RAL, Chilton, Oxfordshire, U.K. Tracking Code Non-linearised.
Beam-based vacuum observations and their consequences Sergei Nagaitsev August 18, 2003.
SPECTRUM ANALYZER 9 kHz GHz
Beam loss and longitudinal emittance growth in SIS M. Kirk I. Hofmann, O. Boine-Frankenheim, P. Spiller, P. Hülsmann, G. Franchetti, H. Damerau, H. Günter.
Paul Derwent 14 Dec 00 1 Stochastic Cooling Paul Derwent 14 Dec 00
RAL Muon Beam Line Properties. ISIS 70 MeV H- injection Ring accelerates up to 800 MeV in about 10 ms 50 Hz cycle - Dual Harmonic System ~ 2 x 1.5 MHz;
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
RF System for HESR Status report, January 2006 F. Etzkorn / A. Schnase, with help from S. An, K. Bongardt.
P.W. Gorham et al.. TEST BEAM A SLAC Time relative to beam entry Antenna V/V rms Time relative to beam entry Antenna V/V rms close to shower maximumshower.
A simple formula for calculating the momentum spread from the longitudinal density distribution and RF form Recycler Meeting March 11, 2009 A. Shemyakin.
Accumulator Stacktail Cooling Paul Derwent December 18, 2015.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Evolution of beam energy distribution as a diagnostics tool Alexey Burov, Bill Ng and Sergei Nagaitsev November 13, 2003.
Microwave Schottky Pickups at Fermilab Ralph J. Pasquinelli January 14, 2004.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
47th Annual Meeting of the Division of Plasma Physics, October 24-28, 2005, Denver, Colorado ECE spectrum of HSX plasma at 0.5 T K.M.Likin, H.J.Lu, D.T.Anderson,
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
 NICA is being constructed  For heavy ions we need very highluminosity level – 10 cm s  For keeping up such level we inevitably need cooling  Stochastic.
Pbar Production Status & Plans to get to 25mA/hr Keith Gollwitzer Antiproton Source August 31, 2006.
1Ben ConstanceCTF3 working meeting – 09/01/2012 Known issues Inconsistency between BPMs and BPIs Response of BPIs is non-linear along the pulse Note –
Bunched-Beam Phase Rotation - Ring Coolers? - FFAGs? David Neuffer Fermilab.
Marina Dolinska 28 th August, Cooling methods Electron (SIS18, ESR, RESR, NESR, HESR) Stochastic (ESR, CR, RESR, HESR) Laser (ESR ??, HESR ??).....other.
Christopher Gerth & Christopher Behrens Mini-Workshop on Longitudinal Diagnostics for FELs 11/12 March 2013, PSI, Villigen TDS induced energy spread.
ANALOG SPECTRUM ANALYSIS. TOPICS Bank-of-filters spectrum analyzer Sequential spectrum analyzer –Variable tuning filter spectrum analyzer –Superheterodyne.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
ELENA RF Manipulations S. Hancock. Apart from debunching before and rebunching after cooling, the principal role of the rf is to decelerate the beam and.
Brian Drendel May 21, Stacking Pbars stacked: E10 Time stacking: Hr Average stacking rate: E10/Hr Uptime Number of pulses.
E. Schneidmiller and M. Yurkov FEL Seminar, DESY April 26, 2016 Reverse undulator tapering for polarization control at X-ray FELs.
6 July 2010 | TU Darmstadt | Fachbereich 18 | Institut Theorie Elektromagnetischer Felder | Sabrina Appel | 1 Micro bunch evolution and „turbulent beams“
Measurement and Instrumentation
HOMs in high-energy part of the Project-X linac. V. Yakovlev, N. Solyak, J.-F. Ostiguy Friday 26 June 2009.
Seeding in the presence of microbunching
Stochastic cooling system: Start-up and project modes
HOM-BPM study in STF for cavity miss-alignment detection
Beam based measurements
402.5 MHz Debunching in the Ring
M. Migliorati, C. Vaccarezza INFN - LNF
Final Cooling For a High-Luminosity High-Energy Lepton Collider
Upcoming longitudinal MDs
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Pulsed electron beam cooling experiments: data & preliminary results
Presentation transcript:

Debuncher Stochastic Cooling Paul Derwent March 3, 2016

Debuncher Cooling -- Derwent 2 Debuncher sequence  Bunch rotation: ~100 msec  Exchange large momentum spread (~4%) short time spread (~2 nsec)  For Small momentum spread (0.4% or 36 MeV) DC beam  Stochastic cooling  Momentum and transverse  Liquid He front end (T eff = 30 K)  4-8 GHz in 4 bands  2400 W/plane (transverse), 4800 W (longitudinal)  Cooling Specifications: Momentum: 60 MeV to 6 MeV in 1.9 seconds Transverse: 320 π mm mr to 45 π mm mr in 1.9 seconds

Debuncher Cooling -- Derwent 3 Bunch Rotation  Large initial momentum distribution after Bunch Rotation  Large time spread from MI ~ 2 nsec  Energy offset contributes to width and produces high energy tail  Hardware in place (B. Ashmanskas, Cornell) to fix energy offset  Implementation in operations in coming weeks

Debuncher Cooling -- Derwent 4 Measurement technique  Measure cooling rate and asymptotic width  Use 95% width  How far stacktail has to move beam to get 97.5% efficiency  Look at one Schottky band  5.2 GHz  8813th harmonic  Uses Debuncher Momentum Band 2  Spectrum Analyzer:  Center 5.2 GHz  Span 0 Hz  Resolution Bandwidth 1 MHz  Use 21.4 MHz IF output  Vector Signal Analyzer  Center 21.4 MHz  Span 350 KHz ~100 MeV/c at 8813th harmonic  7 averages  Traces every 0.22 seconds  Start at end of bunch rotation  5 Pulses

Debuncher Cooling -- Derwent 5 Sample pulse

Debuncher Cooling -- Derwent 6 Initial Width  Initial beam distribution > 100 MeV  Function of bunch rotation performance  Beam outside of span move into span  Cooling reach ~110 MeV  Beam outside of cooling reach heated, N+1 harmonic overlap  Can affect 95% width calculations

Debuncher Cooling -- Derwent 7 Performance  5 Pulses: plot average and RMS of the 95% width  Fit to exponential + constant  Reworked Medium level  Installed variable gain attenuators  Variable gain amps run at constant gain  New equalizers  Optical Notch filters coming!

Debuncher Cooling -- Derwent 8 Desired Performance  Debuncher 95% Width:  Stacktail Cooling sets cycle time  With DRF2 on: Solution: t = 2.42, W = 7.28 MeV/c  Future?  Optical notch filters: more gain and smaller asymptotic width  Bunch length on target and Bunch rotation alignment: initial width Solution: t=1.5, W=4.5 MeV/c

Debuncher Cooling -- Derwent 9 Transverse Systems  Bands 1 & 2 have large common mode signals, which limit gain (as total power is limited)  Notch filters under design to minimize impact of common mode  Installed in Fall 03 shutdown  Working on similar measurements of transverse performance Betatron signalCommon Mode signal