CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.

Slides:



Advertisements
Similar presentations
Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Advertisements

CMP COUNTRY ANALYSIS 13 th SG meeting Madrid 7 th February 2010.
15 November th SG meeting Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
15 th September 2013 Enagás and TIGF Information to NRAs.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
Roadmap for the early implementation of the CAM Network Code (CAM Roadmap) Main achievements to date and lessons learned Violeta Bescós, Market Adviser.
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
PILOT PROJECT ON CAM 17 th SG meeting Madrid 27 th September 2012.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
UNC Mod 485: CMP-LTUIOLI Progress Update 3 April 2014.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market Interconnection Point Oude Statenzijl H-gas Kick-off Meeting.
Madrid 15 th July 2009 OS for the development of new gas interconnection capacity between Spain and France after th SG meeting.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
Madrid, 1 st April 2008 Offering of capacities under the OSP.
32 nd IG meeting 15 th July 2015 Enagás, GRTgaz, REN and TIGF.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
French transport structure SG meeting Madrid – 15 July 2009.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
2006 December 11th ERGEG South GRI – 2 nd IG Assessment of the capacity at the GRTgaz / TIGF interface South Gas Regional Initiative – 2 nd Implementation.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Gaz de France Réseau de Transport Jacques Laurelut How Gaz de France – Transport can contribute to further competition in France
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Gas Regional Initiative – North West Region Paris Workshop 11 May 2007 Workshop on Interconnections & Primary Capacity Market Kick-off Meeting on IP 14.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
© 2011 The Williams Companies, Inc. All rights reserved. Consolidated Nominations Jeramie Kilpack Mary White.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
Allocation of capacities. 2 Allocation of Capacities Determination of capacities Calculation of pipeline capacities is based on the physical laws governing.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
Congestion Management
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
25th IG meeting 13th December 2013
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
26th IG meeting 23th January 2014
Results of the First Phase of the OS 11th IG meeting
Roadmap for the early implementation of the CAM Network Code (CAM Roadmap) Main achievements to date and lessons learned Violeta Bescós, Market Adviser.
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
24rd SG meeting 8th february 2018
Enagás, GRTgaz, REN and TIGF
Presentation transcript:

CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011

2 PROPOSAL  The Long-Term UIOLI procedure could be applied at the following IPs:  GRTgaz North-GRTgaz South  GRTgaz South-TIGF  TIGF-Enagás  TIGF-Naturgás Energía Transporte  The Long term UIOLI procedure will be applicable from 1 st April Where can be applied the UIOLI procedure? NORTH SPAIN SOUTH TIGF NORTH SPAIN SOUTH TIGF

3 PROPOSAL  Every network user could trigger the UIOLI procedure when: 1.there is no primary capacity available at the point in the direction requested, thus the TSO is unable to meet at least 1 duly justified request from a shipper, 2.the network user is unable to get the firm capacity in the secondary market (either on a bilateral basis, or bulletin board, if any applied), and 3.the period requested by the network user is higher than a season*.  If all these conditions are fulfilled, the affected TSO will apply the UIOLI procedure in coordination with the adjacent TSO and under the supervision of the NRAs.  The procedure is not triggered if access has not been denied to any shipper by the TSO. When is the UIOLI procedure triggered? * Season is defined according to the Information Memoradum of the 2013 OS and 2015 OS

4 PROPOSAL How will the reduction be performed? Winter season capacity and summer season capacity shall be released If daily used capacity is on average less than 80% of its daily contracted capacity during: the last winter season, the last summer season, and the last 12 months  Daily used capacity shall be studied for the 12 previous months shipper by shipper … unless the existing shipper(s) is/are able to justify its/their behavior (see slide 7)  This proposal might be adjusted once the CAM NC has been approved.

5 PROPOSAL  If the 3 conditions previously mentioned in slide 3 are met, the amount of capacity to be released will be the following:  The capacity freed up with the above rule must not be higher than the capacity requested (and thus allocated to the new entrant).  The “α” factor will be adjusted upwards to ensure that the total booked capacity by all shippers is not lower at the end of the process than at the beginning of the process.  Capacity will be released up to a maximum of 2 years.  In the analysis of the average used capacity the capacity reduced due to maintenance works should be not taken into account. How much capacity will be released? Reassignment = Daily Entry (Exit) Capacity Subscribed – α * Average Daily Quantities Scheduled for Offtake (Delivery) α ≥ 1.05 (i.e. the maximum reassignment takes place when α = 1.05 )

6 PROPOSAL 2 working days TSO concerned will get in touch with the adjacent TSO 6 working days Concerned and eligible shippers should agreed between themselves TSOs will analyze the used of the existing contracts. TSOs will communicate the outcome of the analysis to the concerned shippers and encourage them to sell the capacity in the secondary market TSOs will inform NRAs 10 working days If the requested shipper has not been able to get the capacity TSOs will trigger the UIOLI procedure TSOs to trigger the UIOLI procedure 5 working days TSO will reallocate the capacity TSOs will communicate the shippers the new reallocation of capacity TSOs will inform NRAs 5 working days Shippers not accepting the reallocation justify their refusal 3 working days Final reallocation decision and communication to the shippers Main deadlines Shipper requests capacity and the 3 conditions are fulfilled TSOs will inform NRAs TSOs will recalculate (if needed) and communicate the shippers the new reallocation of capacity TSOs will inform NRAs Shippers TSOs

7 PROPOSAL  The reasons to refused the reallocation of capacity claimed by shippers might be one of the following:  the existence of Public Service Obligation (PSO), and/or  the existence of provisions in a supply or procurement contract that is in force or that is to come into force in the near future; and/or  the existence of exceptional and temporary circumstances justifying why the network user may keep the capacity for which the TSOs have requested reassignment. Reasons to refuse the reallocation

Thank you for your attention!

9 PROPOSAL Example Initial booked capacity  IP fully booked by 4 shippers.  Total technical capacity 7,500 kWh/day 1

10 PROPOSAL Example New entrant requests capacity and … 1.there is no primary capacity available at the point in the direction requested, thus the TSO is unable to meet at least 1 duly justified request from a shipper, 2.the network user is unable to get the firm capacity in the secondary market (either on a bilateral basis, or bulletin board, if any applied), and 3.the period requested by the network user is higher than a season. 2

11 PROPOSAL Example TSOs jointly study the utilisation rates of the contracts 3 Annual, winter and summer utilisation rates of shipper 3 and shipper 4 are below 80% Capacity shall be released

12 PROPOSAL Example Maximum reduction of capacity (α = 1.05) 4 Maximum reduction is above the requested capacity α should be higher  Each shipper shall be reduced proportionally to the maximum utilization rate between: the annual, the summer and winter utilization rate of each shipper

13 PROPOSAL Example Final allocation of capacities  Effective reduction: α =