16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.

Slides:



Advertisements
Similar presentations
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Advertisements

Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
LHC Commissioning WG, 22/05/2007 LHC Systems Cryogenics….as seen by “Beam Handlers” G. Arduini, S. Redaelli Many thanks to: A. Butterworth, S. Fartoukh,
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
Powering of the Superconducting Circuits: Procedures and Strategies for Circuit Validation Antonio Vergara on behalf of the Hardware Commissioning Coordination.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Logging Mike Lamont Georges Henry Hemlesoet AB/OP Discussions with M. Pace & C. Roderick.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
PostMortem Workshop January LHC “Post Mortem” Workshop: Introduction Initiative by Robin Lauckner, Adriaan Rijllart and myself, helped by many other.
For more info:
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
European Organization For Nuclear Research Future Database Requirements in the Accelerator Sector Ronny Billen Database Futures Workshop – 6-7 June 2011.
TRACKING OF FAULTS AND FOLLOW-UP Accelerator Fault Tracking project Jakub Janczyk (TE-MPE-PE / BE-CO-DS) with input from: Andrea Apollonio, Chris Roderick,
Status of ITER collaboration for Machine Protection I. Romera On behalf of the colleagues who contribute to the project Thanks to: Sigrid, Markus, Rüdiger,
Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
Running scenario 2009/10 Run through components – and then synthesis.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Andrzej Siemko On behalf of the MPP-GMPMA Task Force: (A. Ballarino, R. Denz, B. Khomenko, A.Perrin, P. Pugnat, A. Rijllart, L. Serio, A. Siemko, A. Vergara.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
OVERVIEW OF THE NEW FEATURES PVSS SCADA SYSTEMS USED DURING HCC MP3 - Frédéric BERNARD.
MA PM performance, Adriaan Rijllart Post Mortem data handling and performance Adriaan Rijllart, Beno î t Pannetier, Boris Khomenko, Greg Kruk,
European Organization For Nuclear Research PS2 Naming Conventions: the Options Ronny Billen 15 June 2009 Accelerators and Beams Department Controls Group.
PM System Architecture Front-Ends, Servers, Triggering Ingredients Workshop on LHC Post Mortem Session 1 – What exists - PM System, Logging, Alarms Robin.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
UNICOS LHCLoggingDB Josef Hofer EN/ICE/SCD. Agenda The LHC Logging Database Purpose of the LHCLogging component Basic concepts Advanced concepts Logging.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
Systems, their relations & information. Concepts and Status of the new central service for tracking relations between CERN accelerator systems TE/MPE TM.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
European Organization For Nuclear Research CERN Accelerator Logging Service Overview Focus on Data Extraction for Offline Analysis Ronny Billen & Chris.
AB-CO Review September Session on circuit commissioning Session on circuit commissioning Post-Mortem requirements F. Rodríguez-Mateos on behalf.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
PLCs at CERN for machine protection and access interlocks Session: Machine Protection and interlock systems at different labs I. Romera Ramírez (CERN /
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Data providers Volume & Type of Analysis Kickers
R. Denz, A. Gomez Alonso, AT-MEL-PM
Powering LHC magnets version 30/3/2007.
Testing of SC Magnets Status - November 2010
The HL-LHC Circuits: Global View and Open Questions
Summary of first LHC logging DB meeting
Powering the LHC Magnets
J. Uythoven for the MPE-MI & MS Teams
The Control System For LHC Hardware Commissioning
Powering from short circuit tests up to nominal
Detailed global view on protection and detection of the circuits
TEST PLANS for HL LHC IT STRING
Machine Protection Xu Hongliang.
+ many slides from various colleagues (KH, Rudiger, Paul, …)
Friday 15th February - morning
Hardware Commissioning
Presentation transcript:

16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO

R. Billen January 2007Post-Mortem WorkshopLogging - 2/10 Topics  Purpose of the LHC Logging Service  Architecture overview  Interaction with the Post-Mortem system Combining and correlation of slow logging data and external transient data Combining and correlation of slow logging data and external transient data Naming conventions and enforcement Naming conventions and enforcement Data lifetime policy Data lifetime policy  Ideas and possibilities Better use of the Naming database Better use of the Naming database Storing of PM summary information Storing of PM summary information  No conclusion

R. Billen January 2007Post-Mortem WorkshopLogging - 3/10  Logging Project started in 2001  First operational implementation used in autumn 2003 Logging Service - Purpose  Need to know what’s going on in and around the LHC by logging heterogeneous time series data, in order to manage information required to improve the performance of the machine and individual systems; meet specific INB requirements to record beam history; make available long term operational statistics for management; avoid duplicate logging developments.  Any client can use the service, including the injectors and the experiments  Exponential increase in data volumes  Expected to stabilize after 1 st year of LHC operation ~5TB per year

10g AS LHC Logging Service Architecture Logging DB Measurement DB Technical Services DB HTTP JDBC PL/SQL Custom Java Applications Generic Usage Records/day Nov-2006

R. Billen January 2007Post-Mortem WorkshopLogging - 5/10  For a complete PM analysis, slow logging data will need to be combined with transient data captured by the PM server  Many data sources are the same for PM and Logging Interlocks: PIC, WIC, BIC Interlocks: PIC, WIC, BIC Beam instrumentation: BCT, BL, BPM Beam instrumentation: BCT, BL, BPM Equipment: Power Converters, Collimators, RF, Beam Dump Equipment: Power Converters, Collimators, RF, Beam Dump Quench Protection System Quench Protection System Technical infrastructure: CV, electricity Technical infrastructure: CV, electricity Cryogenics: production, instrumentation Cryogenics: production, instrumentation Vacuum: pressures Vacuum: pressures  Two prerequisites are to be fulfilled Consistent identification of the data Consistent identification of the data Coherent time-stamping of the data Coherent time-stamping of the data  The same logic holds for Alarms, Setting, Trims,... Integration with other services  Name of Parameter or Entity  UTC at the data source

R. Billen January 2007Post-Mortem WorkshopLogging - 6/10 General naming scheme <LHC entity>:<quantity code>.. 95% An “occurrence” may slip in to guarantee uniqueness of the entity For example: LHC half cell CERN works Powering subsector To specify in more detail the entity, if necessary For example: STATUS VOLTAGE TEMPERATURE INTENSITY “Naming of LHC Entities and their Parameters for the CERN Control Centre” LHC-C-QA-0002 EDMS

R. Billen January 2007Post-Mortem WorkshopLogging - 7/10 Signal names in practice   Have been logged during hardware commissioning heat runs SignalDescriptionSystem MQ.12L3:U_1_EXT Voltage across first half of MQ.12L3 external aperture QPS MB.A8R7:ST_MAGNET_OK Magnet status (SC or quenched) MB.A8R7 QPS RCD.A56B2:I_DIDT Current slope in corrector circuit RCD.A56B2 QPS DQAMG.UA63.RQ4.L6:ST_FIP WorldFIP status from controller on circuit RQ4.L6 QPS DQQDL.A8R7:ST_PWR_PERM Power permit from quench loop controller DQQDL.A8R7 QPS RCD.A56B2:ST_ABORT_PIC Quench status signal received by PIC for circuit RCD.A56B2 PIC RB.A12.ODD:CMD_ABORT_PIC Fast abort request issued by PIC for odd side on circuit RB.A12 PIC CIP.UA63.ML6:ST_SUPPLY_24V_1 Status of the first 24V power supply in CIP.UA63.ML6 PIC RPTE.UA87.RB.A81:I_REF Current reference of 13kA power converter on MB circuit PC RPTE.UA87.RB.A81:STATE_PLL Phase-locked loop state of 13 kA power converter on MB circuit PC RPLB.UA83.RCOSX3.L8:I_MEAS  Measured current of 120A power converter for inner triplet skew octupole corrector circuit PC RPMBB.UA83.RQSX3.L8:STATE  State of 600A power converter for inner triplet skew quadrupole corrector circuit PC

R. Billen January 2007Post-Mortem WorkshopLogging - 8/10 A different key per data store PM Server file system folder../RPLB.UA83.COSX3.L8/2006_01... file pmdata-100Hz.sdds Measurement database table records var-name RPLB.UA83.COSX3.L8:I_MEAS var-id 2877 Logging database table records var-name RPLB.UA83.COSX3.L8:I_MEAS var-id Layout database table records slot RPLB.UA83.COSX3.L8 slot-id LASER alarms database table records FF FFC_50 FM RPLB.UA83.COSX3.L8 FC 23 (voltage source fault) MTF EDMS doc file slot RPLB.UA83.COSX3.L8 file 24HrsHeatRun_lasse_ for all accelerators Naming database for all accelerators Entity codes / Equipment codes RPLB Entities entity code RPLB location UA83 function COSX3.L8 Parameters entity RPLB.UA83.COSX3.L8 quantity code I_MEAS unit ampere data type numeric

R. Billen January 2007Post-Mortem WorkshopLogging - 9/10 Naming database  The naming database has implemented the quality assurance definition rules  Public portal :  The naming database can be used as: Centrally maintained equipment code catalogue Centrally maintained equipment code catalogue Dictionary for entity parameters (signals) Dictionary for entity parameters (signals) Preparation of foreseen entities and their parameters Preparation of foreseen entities and their parameters Propagation of definitions to other data stores Propagation of definitions to other data stores Generation of supervision systems configuration Generation of supervision systems configuration  Usable for all accelerators  Currently 150,000+ signals defined

R. Billen January 2007Post-Mortem WorkshopLogging - 10/10 Data lifetime  Data stored in the logging database will be kept for the lifetime of LHC  Policy for keeping PM events (after analysis) has to be defined as well  The more data there is, the more difficult it will be to analyze 10 7 records/ hour from QPS sector (i.e. a lot of noise) 10 7 records/ hour from QPS sector (i.e. a lot of noise)  Logging database could hold summary information per PM event  Data definitions may vary over time  Renaming (for whatever reason)  Correcting historical errors (e.g. inversion of power converter cabling  End-user must be confident when retrieving data for analysis ...Data Management of PM related data risks to get tricky over time