Pedestrian Overpass Locations City of Kent 1. Objectives Find a location in Kent for a pedestrian overpass Allow better traffic movement by removing pedestrian.

Slides:



Advertisements
Similar presentations
ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
Advertisements

Meridian Road Interchange Rebuild ITD Board Meeting June 18, 2009.
A presentation of the Washington State School for the Blind A presentation of the Washington State School for the Blind A Presentation of the Washington.
Washington Street Redesign Andrew Brunn, Kamila Misiak, Sarah Thomas The Long Term Solution.
Williamson County Bond Program: City of Georgetown PARKS ELEMENT – –Hike and bike trail expansion from Bootys Road Park to Williams Drive along Bootys.
Project Background and Objectives
Chapter 14, Section 2: Urban Land Use Standards: SEV1c, 5d
Heather Strassberger, AICP Bicycle, Pedestrian, and Human Services Transportation Planner Baltimore Metropolitan Council.
Walkability and Urban Form " Using GIS to measure walkability of neighbourhoods" URISA Ontario Conference May 5, 2009 Planning, Housing, and Community.
COMPLETE STREETS ROCHESTER, MINNESOTA September 28, 2011 Mitzi A. Baker, AICP Active Living Rochester Rochester-Olmsted Planning Department.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Important Notes for Sustainable Streets Power Point users: (1) Copyright permission for many of the images included in this file has been granted to Ellen.
9/7/2012 MBS UU.
Boston Cyclists Union Gateway East Needs a Safe Bikeway for Everybody.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Blind Spots at Intersections and Crosswalks
State Highway 6 Corridor Access Plan. SH 6 Project Description Project Initiated and funded by –City of Houston –Missouri City –City of Sugar Land –Harris.
Evaluation of Geographic Information Systems Spatial Analysis Tools in the Resolve of Service Areas for Transportation Systems: Case Study of the Bus Rapid.
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
Transportation System Issues and Challenges
 Jebessa Dara  Josh Finley  Jon Gibson  Rodney Pfiefle.
3rd Street Light Rail Process and Challenges of Developing Transit Signal Priority Javad Mirabdal, Jack Fleck & Britt Thesen Department of Parking and.
With Pictures.  Bus Bus Schedule CarBike BicycleTruck.
Walking and Biking the Busiest Roads Around Atlanta: a Bike/Ped Plan that establishes non-motorized transportation among regional-scale priorities Regan.
Seattle Bicycle Advisory Board June 6, 2012 Bicycle Master Plan Update.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
Effective Transportation Planning City of Seattle, WA.
Welcome. Challenges  Overcoming perceptions, some real, that  Gardner is not open for business  We aren’t consistent in the application of our codes.
People commuting to UW suffer delays, congestion using both public and private transportation. We propose a park & ride system with express shuttle service.
Official Plan Zoning Bylaw Land Uses
Highway Functional Classification Chapter 16 Dr. TALEB M. AL-ROUSAN.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Transit-Oriented Development in Los Angeles County By Jennifer Tolentino Fall 2010.
MAPPING SUSTAINABLE WELLBEING Erin Coutts Global Development And Environment Institute, Tufts University.
National Institute for Transportation and Communities (NITC) UTC SAFETY SUMMIT MARCH 19-20, 2015.
Transportation Safety Characteristics of Washington’s Interstate 90 Presented by: Tom Abbott & Aaron Hulst.
LEED-ND IN LOS ANGELES COUNTY November 2, 2010 Alexandra Oster.
Cycling Scotland Presentation
Roads without trails Streams Mameyes Watershed Boundary Intersect Buffer 50 meters Buffer 100 meters Intersect represents all of the areas along stream.
Nuclear Power Plant Site Exploration By: Spencer Livermore Blake Costa Nate Dillow Charlie Nystrom Ryan Brunner.
Edge as Integration Main Bicycle line Edge as Integration.
ELSA RODRIGUEZ URBAN PLANNING 206A Proposed Affordable Mixed-Use Housing Projects in the City of Glendale.
Mason to Metro Bicycle Route Project. Proximity to DC DC was listed as the forth best biking city in the United States by Bicycling Magazine Had an 80%
Complete Streets The Columbus Experience Road School March, 2014.
HB 277 Regional Transportation Sales Tax Preliminary Project List Presentation Mayor and City Council Work Session March 1, 2011.
Planes, trains & automobiles… Transport. Roads – some facts… Six million more vehicles on our roads now than in 1997 More two car households than no car.
HOW GOVERNMENT REGULATION CREATES SPRAWL: JACKSONVILLE AS A CASE STUDY.
2035 General Plan Update Planning Commission Study Session on Draft Circulation Element February 2, 2016.
Mobility for all Modes Update to the Transportation Chapter of the City’s Comprehensive Plan City Council May 27,
Complete Streets Training Module 4b – Designing for All Users.
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
The Key Elements of Developing a Traffic Control Plan
The American River Parkway
Crossing Lake Washington
Sidewalks in bellevue Team JACK Matt Schnell Peter Kwon Hiroyuki Ikeda
Early Voting Starts Oct. 20 | Election Day Nov
CONSTRUCTION METHODS & TECHNOLOGY
Name: _________________ Class: ________
Adam Parast Kendra Hartstrom April Pust Sean Liner
Section 12.3 Mass Movement A lot of material moves all at one time
WESt Sammamish park project
Design Standards.
Integrating Trails into Transportation Networks
CONSTRUCTION OF NEW AND REHABILITATION OF EXISTING NON-MOTORISED FACILITIES IN BIRKENHEAD Contract number. 206Q/2017/18.
Presentation transcript:

Pedestrian Overpass Locations City of Kent 1

Objectives Find a location in Kent for a pedestrian overpass Allow better traffic movement by removing pedestrian crossings Locate next to transit stops, bike trails and commercial areas Avoid costly construction areas and sewer lines 2

Overall Project Location 3

Costly Construction Areas Erosion Hazard Areas Seismic Hazard Areas Landslide Hazard Areas 4

Costly Construction Areas 5

Commercial Areas 6

Bike Trials 7

Analysis Buffer ◦.5 miles for Trails ◦.25 miles for commercial areas Union Intersections Clip Erase 8

Possible Locations Along principal arterials Within.5 mi of trials and.25 of commercial areas and transit stops Avoid hazard areas and sewer lines 9

Possible Locations 10

Chosen Location Just before intersection of Washington and Meeker 8 transit stops within close proximity Commercial and shopping areas on both sides of Meeker 11

Chosen Location 12

Data Used Cities / Incorporated Areas Hazard Areas ◦ Seismic, Erosion and Landslide Water Bodies Washington Counties Public Lands Trails King County Transportation Network Sewer Lines Metro Bus Stops 13