Introduction to BMPs U.S. Department of the Interior Bureau of Land Management May 2006.

Slides:



Advertisements
Similar presentations
© Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry June 5, 2008.
Advertisements

WATER QUALITY ANALYSIS for ANTIDEGRADATION
U.S. Department of the Interior Bureau of Land Management Wildlife Management Updated: January 2013.
1 Montana's Rocky Mountain Front just outside of Browning, Montana. September, Photo: Oil and Gas Accountability Project.
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management June 2007.
BLM Bureau of Land Management Oil and Gas Permitting Process Expediting Oil and Gas Development in Western States Kent Hoffman.
Reduce Unnecessary Disturbance Part 3 U.S. Department of the Interior Bureau of Land Management November 2006.
U.S. Department of the Interior Bureau of Land Management Wildlife Management November 2006.
Split Estate Private Surface / Public Minerals What Does it Mean to You? 2006.
Page 1 Copyright © ALL Consulting, All Rights Reserved January 3, 2003ALL Consulting Overview of Coal Bed Natural Gas Best Practices and Mitigation.
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
RESILIENCE AND INTACTNESS A Manager’s Perspective.
SHALE PLAYS IN THE INTERMOUNTAIN WEST: LEGAL AND POLICY ISSUES Development of Shale: Water Resource Concerns & Policy Considerations Katy Dunlap, Esq.
Final Reclamation Part 5 U.S. Department of the Interior Bureau of Land Management May 2006.
IPM Issues in the West Kevin Fitzsimmons University of Arizona Department of Soil, Water and Environmental Science.
Green Building and Sustainable Architecture
Siting Considerations for Utility Scale Photovoltaic Power Generation Systems. Tim Green, Brookhaven National Laboratory NE FWS Biologists Conference February.
Environmental Assessment August 2012 Oil & Gas Lease Sale.
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management May 2006.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Environmental Impact Assessment Review Process for Oil and Gas Projects In Saskatchewan Larry Lechner, P. Eng. Director Environmental Assessment Branch.
Master Development Plans (MDPs) Oil and Gas Projects.
Environmental Quality Incentives Program (EQIP) Grazing – Our Most Commonly Used Conservation Practices.
Planning for Travel and Transportation Management National Training Center Course # Unit Six Transportation System Development.
U. S. Department of the Interior Bureau of Land Management Division of Fluid Minerals, 1.
Chesapeake Energy Shale Operations Overview
Production Operations U.S. Department of the Interior Bureau of Land Management November 2006.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
BLM-Alaska Overview Bud C. Cribley BLM-Alaska State Director Western Interstate Region Board of Directors Meeting Board of Directors Meeting May 21, 2014.
Wyoming Landscape Conservation Initiative An Approach to Landscape Scale Conservation in Southwest Wyoming October 23, 2014.
Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson.
1 The Lower Athabasca Regional Plan: A Case Study Biol. 595 Sept. 16, 2009.
2011 TRB Workshop Camp Withycombe Small Arms Firing Ranges Green Remediation-Case Study Sunrise Corridor Project 1 Presented by: Len Farr AMEC Earth &
Employees can help reduce water pollution by preventing dirt and debris from being washed into the storm drain system during the following activities:
Roan Plateau Proposed Plan Garfield County Energy Advisory Board Oct. 5, 2006.
Taking the Next Step: Implementing the TMDL. What IDEM Provides to Help With Implementation  Compiling all the data in one place  Data-driven recommendations.
Going Green. Green Building and Sustainable Architecture What is Sustainability? Sustainable Design Sustainable Building Life Cycle Pre-Building Phase.
1 Federal Oil and Gas Planning, NEPA, and Development Scott F. Archer USDI - Bureau of Land Management April 8, 2009.
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
SFS Best Practices Presentation Key “Best Practice” Drivers for the Crop Sector 1.Reduce Nutrient, Sediment and Herbicide Runoff 1.Riparian buffer strips,
I-90 Snoqualmie Pass East Project Tanya Lamb Urban Geography, GEOG 481 Description 15-mile stretch Hyak (MP 55.1) to Easton (MP 70.3) 2010 scheduled to.
Challenges and Opportunities for Increased Access to On-shore Federal Lands Natural Gas Technologies What’s New & What’s Next Orlando, FL January 30-February.
Proper Site Selection Part 2 U.S. Department of the Interior Bureau of Land Management May 2006.
Best Management Practice Information Sheets Updated: August 30, 2004 Contact: U.S. Department of the Interior Bureau.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
Resource Management Plan (RMP) Revision for the Las Vegas and Pahrump Field Offices Muddy Mountains.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Transmission Siting Considerations, Best Practices, and Lessons Learned Gary Graham, Ph.D. Transmission Project Director.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
1 Best Management Practices Planning, Leasing, Permitting Jamie Connell BLM Northwest Colorado District Manager District Manager.
PIPELINE RECLAMATION REQUIREMENTS Interim reclamation: Achieve healthy biologically active topsoil, control erosion, and restore habitat. Final reclamation:
Weaver Mountain Fuels Treatment Project BLM Phoenix Field Office N. 7 th Ave Phoenix, AZ.
Earth Day Award Nomination by Utah School and Institutional Trust Lands Administration and the Division of Wildlife Resources.
National Forest System Grazing Objectives 1.Manage range vegetation to protect basic soil and water resources, provide for ecological diversity, improve.
Greener Cleanups in the Region 10 PCB Program Michelle, Mullin R10 PCB Coordinator Clu-In Webinar November 17, 2015.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
Introduction Part 1 U.S. Department of the Interior Bureau of Land Management May 2006.
U.S. Department of the Interior Bureau of Land Management Wildlife Management Updated: April 2009.
1 Oil & Gas Activities on Public Lands Scott F. Archer USDI – BLM National Science & Technology Center April 3, 2007.
Thom KerrNovember 17, 2015 Colorado’s Continuous Adjustment to Unconventional Resource Development.
Cerrillos Hills Cell Tower Team Three: Sabrina Flores, Angela Wetz, Jane Sanderford, Bridget Clayton, Brenda Warner, and Jon Jasper Field Manager: Steve.
Las Cienegas National Conservation Area An opportunity for cooperative conservation with the National Landscape Conservation System.
Green Building and Sustainable Architecture
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Broomfield Development Plan Extraction Oil and Gas, Inc.
Range Management in the Face of Climate Change
The Gila River Restoration at Apache Grove
Section 7 Environmental Monitoring.
Presentation transcript:

Introduction to BMPs U.S. Department of the Interior Bureau of Land Management May 2006

The BLM manages many outstanding resources, including important wildlife habitat, scenic western landscapes, flowing streams & rivers, recreational opportunities, and many others. Outstanding Resources

The BLM’s Goal is Sustainable Energy Development Meeting the needs of the current generation, without compromising the ability of future generations to meet their needs. Photo of a lower impact two-track road into a drilling operation. This road follows the contour of the land to avoid straight lines and cut & fill. The well location is mowed, not excavated, to temporarily reduce vegetation. Only the rig and pit areas are excavated.

Phase 1: Resources at Pre-Development: Wildlife; Soils; Water; Air; Recreation; Visual; Vegetation; Grazing; etc. Phase 2: Resources During Energy Development: Energy; Wildlife; Soils; Water; Air; Recreation; Visual; Vegetation; Grazing; etc. Phase 3: Resources Following Field Reclamation: Wildlife; Soils; Water; Air; Recreation; Visual; Vegetation; Grazing; etc. Development Over Time Environmental Impacts Are Not Permanent Oil & Gas Exploration and Production is temporary or long-term, but not a permanent use of the Public Land. Over time, nearly all traces of energy development should be erased.

Best Management Practices (BMPs) “Taking Improved Actions to Achieve Improved Results” Siting or Location - Behind the Hill or Ridge Color Selection - Blend with Background, Juniper Green* Reducing Unnecessary Disturbance – Roads and pads Interim Reclamation - Up to the Wellhead Plans of Development (PODs) Reduce Traffic – Centralized Production Facilities Reclamation - Original Contour Native Species Siting - Non- Linear Roads following the topography Bioremediation - of Oily Wastes and Spills Note: A BMP suitable for use in one area, may not be suitable in the next. BMPs are not “one size fits all.” Use the best practice to meet the site-specific needs. As you will see in the presentations that follow, there are a wide variety of BMPs such as:

We Use BMPs Because… They have a history of use. BMPs have been used successfully by many oil and gas operators across the West. They protect resources such as wildlife habitat, forage, water, and scenery. They meet Land Health Standards found in all BLM Land Use Plans. The Cost of implementing BMPs may be more, the same, or may result in a cost savings. BMPs typically constitute only a small portion of the cost of drilling a well. They avert many of the negative impacts that the public associates with energy production activities. Left unaddressed, public concern over these impacts results in increased comments, protests, appeals, & litigation. It is the Right Thing to Do! Installing devices to keep raptors form perching on power poles is a BMP. This eagle would not have been electrocuted if that BMP had been implemented on this power pole.

Traditional Development BMP Development BMP Objective: To Minimize the Footprint of Oil and Gas Operations Both Photos Represent Extremes –We can learn much from the photo on the right. 6 coalbed natural gas wells; 2 miles of 2-track road; 2 miles of pipelines and power lines buried in the road. Can you find them in the photo?

How Do We Improve the Process and Protect the Environment? By using: Good Science, Experienced Employees, Baseline Inventories, Monitoring, Follow-up Adjustments to BMPs. Land Use Planning Lease Stipulations. Early Coordination between the BLM and the Operator. –Pre-Development Planning –Sensitive Area Avoidance –Identifying BMPs to minimize impacts. The Result: When BLM receives coordinated, quality APDs containing BMPs, the permit process becomes simplified and environmental protection is increased. If BMPs necessary for protection of important resources are not included within the APD, they can be attached to it as COAs. APDs = Applications for Permit to Drill COAs = Conditions of Approval

Please continue on with the additional slideshows for a detailed look at the BMPs that are designed to minimize impacts to the many Public Land resources we all cherish.