SPSC113 summary for EATM Lau Gatignon / EN-MEF Open Session:WA104, WA105, RD52, NA62, AEgIS, GBAR Closed Session:Neutrinos, P348, AD experiments, DIRAC,

Slides:



Advertisements
Similar presentations
J. Strait Fermilab October 21, 2005 The Neutrino Detector of the Future: A Massive Liquid Argon TPC.
Advertisements

Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
Accelerator based Neutrino program around the world 1. Europe: Neutrino platform at CERN ESS second maximum? 2. Japan: T2K and HyperK status 3. USA: LBNF.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
T2K – Canada Accelerator & Detector Status D. Karlen University of Victoria & TRIUMF ACOT meeting, May 12, 2007.
Alain Blondel CHIPP Neutrino meeting NEUCHATEL June 2004.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
‘’Wisdom is the child of wonder’’ Happy New Year 2014!
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
CERN LBNE Test Experiment. Plan view of Bat
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
F. Gianotti, AFP kick-off meeting, 20/9/2012 Recommendations for the next steps Reports from the:  Technical Review A.Henriques  Physics Review R.Hawkings.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
J.-P. Riunaud PS/AE PSMB 16/09/2002 Report from 59 th SPSC meeting 03/09/2002 OPEN SESSION on Tuesday, 3 September 2002 at 09:00, Main Auditorium 1. Proposal.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
SPSC116 Summary Lau Gatignon, 14 January Accelerators Ion preparations are well under way, including de-bunching and recapture. Ion interlock against.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
SPSC106 summary for EATM Lau Gatignon / EN Open Session:COMPASS, ICARUS, OPERA, LBL  (E-007  g PBAR (I-241) Closed Session: P347 (SBL ), AD EXPERIMENTS,
SPSC119 Summary Lau Gatignon / EN-MEF, Rende Steerenberg / BE-OP DIRAC, NA61, CAST, OSQAR, CAST, UA9, AWAKE, Baby-MIND, Neutrinos, SHiP, P348, P349, ELENA.
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
General Information New members in ABP (RTL): –M. Samson Restructuring should be finalized by the end of the year to be effective for beginning of the.
CERN Neutrino Platform 4 th April, 2014 FNAL M.Nessi.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
SPSC120 Summary L.Gatignon, EATM, AD experiments, P348, SHiP, NA61, tour of experiments.
Proposal Preparation. Documents for June PAC  Full Proposal  Starting point is LOI + updates in EOI  Project Definition Report  Cost estimate  Excel-based.
Neutrinos from Stored Muons STORM physics with a μ storage ring.
SPSC114 summary for EATM Lau Gatignon / EN EATM, 15 July 2014 Open Session:OPERA, ICARUS, NA63, COMPASS, CLOUD, P349 (pbar polarization) Closed Session:Neutrinos.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
CERN Steve Kettell DUNE Collaboration Meeting January 12, 2016.
ICARUS-LBNE project A. Guglielmi 1.LBNE-ICARUS Padova meeting 2.SPS-C C. Rubbia presentation.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
SPSC125 Report Open Session: NP01 (WA104) NP02 (ProtoDune-DP)
Status of the MICE Construction Project
Francois and Lau EATM 17 July 2012
Outlook by the Physics Coordinator
CERN Neutrino Project 26th November, 2013 M.Nessi.
SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.
Alain Blondel 11 October 2010 GDR NEU2012 summary
nuSTORM and the Physics Beyond Colliders workshop
Summary SPSC meeting November 2005 for EA section meeting
XVth International Workshop on Neutrino Factories, Betabeams and Superbeams LAGUNA-LBNO Many thanks to D. Duchesneau, F. Di Lodovico, T. Patzak, A. Rubbia.
Presentation transcript:

SPSC113 summary for EATM Lau Gatignon / EN-MEF Open Session:WA104, WA105, RD52, NA62, AEgIS, GBAR Closed Session:Neutrinos, P348, AD experiments, DIRAC, CLOUD, COMPASS, NA61, NA63, UA9, ICARUS, OPERA, CAST, OSQAR,AWAKE

L.Gatignon, IEFC Summary SPSC1122 NA62 NA62 will have their first physics run in October. With 10% of nominal intensity and 60% of efficiency they expect to collect 2.2 K + events (SM branching ratio). The planning is very tight, but still feasible. All detectors are needed for the physics goal, apart from MUV1. Some other physics can be done without certain detectors (e.g. GTK). RD52 / DREAM This is a calorimetry R&D program in the H8 beam line in EHN1. They plan to compare the performance of lead and copper as absorber material, with existing modules in 2014 and with new 2-3 ton calorimeters from 2015 on.

L.Gatignon, IEFC Summary SPSC1123

L.Gatignon, IEFC Summary SPSC1124 WA104 NESSIE: better disentangle neutrinos and anti-neutrinos with magnetic spectrometers. They consider two options. A ‘conservative’ air core magnet coupled to an iron core magnet and a more innovative superconducting air-core spectrometer. The request to CERN amounts to 500 keuro. Nessie could also be part of a near detector for a long baseline experiment. Nessie will need the EHN1 extension once they are ready to use the test beam. WA104 has two components: ICARUS (Liquid Argon TPC) and Nessie (magnetic spectrometer) ICARUS: proposes a search for light sterile neutrinos at FNAL, using T600 as a far detector and making a new T150 for the near location. Pending approval of the proposal at FNAL in early summer. The refurbishment of T600 and possibly construction of T150 will happen at CERN, in building 185. This also includes a R&D program. T600 overhauling will be done in 2015, move to FNAL in The main challenge is the magnetization of he Lar TPC. Based on Atlas toroid coils technology. Only the T150 might come to EHN1, if the extension is ready in time. But it will normally be late…

L.Gatignon, IEFC Summary SPSC1125

L.Gatignon, IEFC Summary SPSC1126

L.Gatignon, IEFC Summary SPSC1127

L.Gatignon, IEFC Summary SPSC1128 WA105 Also WA105 has two parts: double phase Lar R&D and MIND (magnetic spectrometer). They propose a 6x6x6 m3 double phase Lar demonstrator for the 20 (50) kton GLACIER detector. Total cost 7.9 MCHF out of which 3.7 MCHF from CERN. For MIND the CERN cost is not known yet.

L.Gatignon, IEFC Summary SPSC1129

L.Gatignon, IEFC Summary SPSC11210

L.Gatignon, IEFC Summary SPSC11211 Marzio Nessie presented his views on the CERN neutrino platform. Four MoU’s are in preparation for WA104 (NESSIE and ICARUS) and for WA105 (LAr and MIND). The main present activity is to prepare the space in B185 and to prepare the transport (after summer). For WA105 a space and clean room will be prepared in B182 for a 1x1x3 prototype. A larger cryostat will be prepared starting in 2016 to be tested in the EHN1 extension. Common CERN/US R&D is foreseen at CERN (EHN1, charged beams, LBNE, target R&D).

L.Gatignon, IEFC Summary SPSC11212

L.Gatignon, IEFC Summary SPSC11213

L.Gatignon, IEFC Summary SPSC11214

L.Gatignon, IEFC Summary SPSC11215 The SPSC received with interest the document describing the technical WA104-NESSiE programme (SPSC-SR ). The Committee supports the R&D on air core magnets and associated detectors that could be used for future neutrino projects, and encourages synergy with the Liquid Argon (LAr) R&D programmes. The SPSC requests a document quantifying the human and financial resources needed for all aspects of the project, including the requests to CERN. The SPSC acknowledges the WA104-ICARUS LAr R&D programme envisaged. The Committee requests a technical document describing the activities foreseen at CERN, including the novel features to be developed. The Committee emphasises the necessity to quantify the financial and manpower resources needed, including the request to CERN. The Committee notes with interest the ongoing discussions with US institutes and laboratories regarding a short baseline neutrino experiment at Fermilab using the ICARUS technology. The Committee looks forward to the official conclusion of the discussion process.

L.Gatignon, IEFC Summary SPSC11216 The SPSC received with interest the technical proposal describing in detail the CERN WA105 R&D programme (SPSC-TDR ). The Committee supports the technical goals of the Double Phase Liquid Argon (DLAr)-TPC programme and considers it as the WA105 priority for the forthcoming years. The Committee requests clarification of the interplay between the 666m 3 demonstrator and the 311m 3 prototype, in term of technical goals, schedule and resources. The Committee requests further information on the human and financial resources requested from CERN and encourages the collaboration to secure the necessary external resources to build the 666m 3 DLAr-TPC demonstrator. The Committee welcomes the possible use of the WA105 facility in synergy with LBNE towards defining the best technical solutions to design a kt-scale LAr TPC. The SPSC notes with pleasure the official support of the LBNE management for the project.

L.Gatignon, IEFC Summary SPSC11217 GBAR GBAR is a gravitational fall experiment for anti-Hydrogen There is much concern in the collaboration about the feasibility with the degraded emittances of ELENA compared to what was foreseen at the time of the proposal. They must then envisage to add an antiproton trap in order to cope with the degraded emittances. However, they are in contact with the ELENA team in order to try to find solutions. The area will be released in September 2015, I.e. earliest possible time to start installation.

L.Gatignon, IEFC Summary SPSC11218

L.Gatignon, IEFC Summary SPSC11219 AEgIS They are making good progress on the proton source, on a positron test station outside the magnetic field (which also allows for Ps spectroscopy) and design work for the downstream interface to the 1T magnet. For 2014 they will work towards anti-<hydrogen formation, for 2015 they aim to produce an anti-Hydrogen beam.

L.Gatignon, IEFC Summary SPSC11220 P348 P348 is a proposal to look for light dark natter particles, produced by an electron beam, presented at SPSC112. They got a list of questions and provided answers to those. They have now in particular used more realistic beam parameters. They can look for e + e - events and into an invisible channel. The window in phase space and in time is limited. The invisible channel seems more appealing. However, the background levels required seem challenging. A location can be found in EHN1, preferably in H4 zone PPE 134. The installation is standard. The beam time request is for a first run of two weeks with provisional apparatus and a total of 6 months for the full experiment. The short test run seems important to investigate the background conditions in more detail. This requires 2 weeks of beam ( , e) and about 5 days for set-up and dismantling. From CERN they request the beam time, the magnet, some beam monitors, the vacuum and decay vessel and technical and beam support.

L.Gatignon, IEFC Summary SPSC11221

L.Gatignon, IEFC Summary SPSC11222

L.Gatignon, IEFC Summary SPSC11223

L.Gatignon, IEFC Summary SPSC11224 The SPSC received with interest the answers to the referees’ questions on the document, P348, describing the search for light dark matter using the SPS. The Committee recommends that the collaboration place more focus on the invisible channel, the more competitive of the two channels. The SPSC recommends a test run of two weeks at the SPS for the measurement of backgrounds, a study of the performance of the apparatus and an initial search for light dark matter. The Committee also recommends that the results of the test run, as well as detailed simulation studies should serve as input for a technical design report to be submitted to the SPSC.

L.Gatignon, IEFC Summary SPSC11225 AD EXPERIMENTS ACE and FLUKA team representatives elaborated together a document to solve the issue about inconsistencies mentioned in their annual review: this has been sent to the SPSC referees and chair: …Remaining deviations are under investigation by AD-4 and FLUKA teams, to study how much these are likely attributed to the experimental side, in particular concerning the applied beam model and geometry setup. The SPSC welcomes the close and productive collaboration between the FLUKA and AD-4/ACE teams necessary for assessing the radiobiological effectiveness of antiproton beams. The committee encourages the ACE collaboration to implement the best possible description of the experimental apparatus into these studies. The SPSC reiterates the interest of having a second beam line for ASACUSA (with ELENA). However, the committee prefers to have both in the same zone, ideally with the switch under user control

L.Gatignon, IEFC Summary SPSC11226 AWAKE CERN has committed to providing the electron injector (PHIN). The overall planning has not changed. The prototype vapor source has been delivered. The valves for he vapor cell have been assembled and tested at VAT. Self modulation diagnostics: transition radiation experiments are planned for 2015 in DESY. An electron beam spectrometer day has taken place. The organisation has slightly changed, There is now a Technical Board (chair Edda Gschwendtner) and a Physics Board (chair Patrick Muggli). The SPSC notes with pleasure the progress made on all components of the experiment and welcomes the CERN involvement on the electron injector. OPERA OPERA will extend the analysis to the 3 rd and 4 th brick. Expected gain: 20%. This has some consequences for the funding and for the decommissioning. The Committee congratulates the OPERA collaboration for the observation of the 4 th tau neutrino event which leads to a significance for tau neutrino appearance at 4.2 sigma C.L..

L.Gatignon, IEFC Summary SPSC11227 BEAMLINE 4 SCHOOLS Final SPSC selection: 30 April – 14 May