GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.

Slides:



Advertisements
Similar presentations
Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Advertisements

1GTE – October 23rd 2003 Regulation of the gas market in France Dominique JAMME Gas Directorate
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Open seasons in European Markets: Overview and initial lessons learned Dominique Jamme ERGEGs Gas Focus Group (GFG) XIV Madrid Forum, May 2008.
1 In France, new capacity is developed and allocated via open season procedures The GGPOS establish how an open season should be conducted To compete with.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
South Region LNG market changes and cross border flows SGRI – 15th November 2013.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Madrid, 17 th February th IG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Lessons from open seasons between France and Spain Regulator’s perspective Benoît Esnault Commission de Régulation de l’Energie (CRE) North West region.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
9th SG Meeting South Gas Regional Initiative 15th July 2009, Madrid.
French Working Group Evolution of the contractual structure of the gas transportation network South Gas Regional Initiative 8th IG Meeting – 16th February.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
1 July 2007 Gas Interconnection between Spain and France Comments to the TSO’s document on the analysis of the future interconnection infrastructures needed.
Madrid 15 th July 2009 OS for the development of new gas interconnection capacity between Spain and France after th SG meeting.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
Pilot Project on Market Coupling PEG Nord / PEG Sud 3rd Workshop on Gas Target Model London 11 APRIL 2011.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
Madrid, 1 st April 2008 Offering of capacities under the OSP.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
France – Spain open season Results Lessons learned.
XV Madrid Forum, 6-7 November 2008 Gas Regional Initiative Progress and challenges.
French transport structure SG meeting Madrid – 15 July 2009.
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Madrid, 12 th April th IG Meeting South Gas Regional Initiative.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
2006 December 11th ERGEG South GRI – 2 nd IG Assessment of the capacity at the GRTgaz / TIGF interface South Gas Regional Initiative – 2 nd Implementation.
1 Open season th IG Meeting 26 th March 2010 Paris.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Madrid, 1st April th SG Meeting South Gas Regional Initiative.
OS 2015: Information Memorandum Draft proposal 12 th SG meeting Madrid 7 th May 2010.
CAM What‘s new on November 1, 2015 ? 1  New PIR Alveringem  Interruptible capacities : Sales planned on the Agenda, Interruptibility of backhaul capacities,
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative TSOs’ report 2013/2015 – Main Findings.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
1 South Gas Regional Initiative 14 th Stakeholders Group meeting Madrid, 11 th July 2011.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
First results of Market Coupling in gas: the French experience SG-meeting GRI NW 25 November SG-meeting GRI NW – 25 November 2011.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
21st IG Meeting South Gas Regional Initiative
2nd SG Meeting South Gas Regional Initiative TSOs’ report 2010/11 – Main Findings Madrid, 6th February 2007.
ERGEG South Gas Regional Initiative
Gas Regional Initiative
26th February 2015 Teleconference
26th February 2015 Teleconference
Presentation transcript:

GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid

GRTgaz Context ERGEG – South GRI : regional step for an opened gas market in Europe Increasing France-Spain interconnection capacities TIGF-ENAGAS: Larrau and Biriatou (2013) TIGF-GRTgaz-ENAGAS: new capacity MidCat (2015)

GRTgaz +55GWh/d in 2013 to Spain +87GWh/d in 2013 to Spain +180GWh/d in 2015 to Spain 230GWh/d end 2010 Capacities +230GWh/d in 2015 to France +165GWh/d in 2013 to France +35GWh/d in 2013 to France

GRTgaz Sales Capacities Mechanisms OSP : for existing or decided capacities Capacities sold for 4 years maximum The aim : new market players would have the possibility to subscribe capacities OS : futures capacities Ask the market Engage shippers to subscribe the new capacities once available Subscription period years The aim: helping investment decision Both mechanisms will be used to ensure selling capacities in the North  South link Two different situations treated independently: North to South Link South to North Link

GRTgaz North to South Link Totally booked Link Last OSP result (January 2008): demand exceeds offer, all capacities subscribed Capacity developments in the North zone (Tansières, LNG terminals…) Open Season in 2008 for new capacities available on 1st January 2015 Until then, existing capacities will be sold by OSP

GRTgaz North to South Link: Calendar OSP mi-2010 (dispo avril 2011) OSP mi-2011 (dispo avril 2012) OSP mi-2012 (dispo avril 2013)

GRTgaz South to North Link Underbooked Link Last OSP result (January 2008) : 10% of total capacities subscribed, 200GWh/d available after 2011 New capacities Larrau + Biriatou in 2013 : 200GWh/d Other possible developments from now to 2015 :  MidCat  Le Verdon  Fos  Storage South of France Interconnection project with Spain: MidCat Open Season in 2009 about South to North Link coordinated with MidCat Additional needs in the North to South Link might be taken into account Capacities available on 1 st January 2015 Until then, existing capacities will be sold by OSP Possible congestion on the South to North Link Capacity South to North still available

GRTgaz South to North Link: Calendar

GRTgaz Schedule Proposal 2008 Open Season North to South Link capacities available on 1 st January Open Season South to North Link N  S additional needs might be taken into account capacities available on 1 st January 2015 OSP in North to South Link until 1 st January 2015 mid-2010 OSP North to South Link; capacities available in April 2011 mid-2011 OSP North to South Link; capacities available in April 2012 mid-2012 OSP North to South Link; capacities available in April 2013 OSP in South to North Link, until 1 st January 2015 Existing capacities for identified needs until the end 2014 OSP every month