Observations with AMBER  General overview  P2VM  OB preparation with P2PP P2PP / OB / templates Available templates for observation procedure Typical.

Slides:



Advertisements
Similar presentations
Surgical Planning Laboratory Brigham and Women’s Hospital Boston, Massachusetts USA a teaching affiliate of Harvard Medical School User Interfaces and.
Advertisements

Engineer Training XL1200 Software Engineer Training XL1200 Software Confidential 2 Print options Archive Print queue Toolbar Preview & Information.
Preparing MIDI for science operations on Paranal Markus Schöller Jean-Gabriel Cuby, Sebastien Morel, Andrea Richichi Schloss Ringberg, September 03, 2003.
Fixed Beam Moving Stage using a stitching free exposure strategy.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
HAWCPol / SuperHAWC Software & Operations J. Dotson July 28, 2007.
Controlled Scanning of Microtiter Plates through the Use of LabVIEW® Erica Chin Anton Edmund Samir Laoui May 14, 2008.
Fiber Channel Video Controller Students: Tsachy Kapchitz Michael Grinkrug Supervisor: Alex Gurovich in cooperation with: Elbit Systems המעבדה למערכות ספרתיות.
OL Series 754 Portable UV-VIS-NIR Spectroradiometer The OL 754 Portable UV-Visible-NIR Spectroradiometers are a series of compact, portable, double monochromator.
LumiCal Alignment System Status report Leszek Zawiejski, Tomasz Wojtoń, Arkadiusz Moszczyński Institute of Nuclear Physics PAN, Cracow 25th FCAL Collaboration.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
1 QED In Vivo USB Input Output Box configuration This tutorial contains a number of instructions embedded in a great deal of explanation. Procedures that.
Cophasing activities at Onera
STEP 1: Determining the exact image width STEP 1: Determining the exact image width Position of X-ray Filter Position of X-ray Filter STEP 5: Crop Extra.
CHARA Collaboration Year-Five Science Review Remote Operation (Control & DRS) VEGA on CHARA “GROC” Jean-Michel Clausse.
IVC : a simulation and model-fitting tool for optical-IR interferometry Abstract I present a new software tool, called “Interferometry Visibility Computations”
MIDI: Data reduction Walter Jaffe, Rainer Köhler, William Cotton Olivier Chesneau, Thorsten Ratzka, Quynh Nhu Nguyen, Guy Perrin, Ch. Hummel and MIDI/ESO.
Telescope Guiding with a HyViSI H2RG Used in Guide Mode Lance Simms Detectors for Astronomy /2/09.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
Page 1 PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Overview of SPIRE Photometer Pipeline Kevin Xu NHSC/IPAC on behalf of the SPIRE.
Software Project Planning Defining the Project Writing the Software Specification Planning the Development Stages Testing the Software.
F. Levrier (LERMA - ENS) J. Pety (LERMA - IRAM Grenoble) P. Salomé (LERMA - Observatoire de Paris) STAR FORMAT meeting, Heidelberg, 4-5 may 2010 Making.
Tutorial T-10 Amber Data Reduction (practical point of view) EuroSummer School Observation and data reduction with the Very Large Telescope Interferometer.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
OL Series 750 Automated Spectroradiometric Measurement System The OL Series 750 is an extremely versatile spectroradiometric measurement system capable.
SCIOPS 2013 Reinhard Hanuschik, ESO Garching The VLT Quality Control Loop.
The AMBER & MIDI instruments of the VLTI (Observationnal Astronomy II) Lecture by Stéphane Sacuto.
GAYA Analyzer SDD Presentation. GAYA Analyzer Introduction OMS40G256 is a hardware device used for detection of radioactive radiation for medical imaging.
NASA Herschel Science Center - page 1 NHSC Cycle 1 Open Time Proposal Planning Workshop 3-4 June 2010 PACS Accepted Programs & Observations to Date B.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/25/2012Prototype Review Meeting.
Observing Modes from a Software viewpoint Robert Lucas and Philippe Salomé (SSR)
IPD Technical Conference February 19 th 2008 Application: Pipette Measurement and Flash Inspection. Distributor: CPU Automation Engineer: Mike Bray.
HARPS Data Flow System Christophe Lovis Geneva Observatory HARPS-N PDR, 6-7 December 2007, Cambridge MA.
MIDI design, performance, operations, and science Markus Schöller (INS)
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Glow Experiment Outline Brandon Hanold. Outline 1.Glow Description 2.Experiment Design 3.Acquisition Loop Variables and Keywords 4.Reduction Results 5.Reduction.
APT Overview for Transiting Exoplanet Proposals Chris Moriarty – APT Developer.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
Project Planning Defining the project Software specification Development stages Software testing.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
HSC Queue Mode Implementation Plan ~ Stage I, II, III ~ Tae-Soo Pyo Subaru Telescope /01/15.
The Very Large Telescope Interferometer Neon School, Garching 29 August, 2008 Andrea Richichi European Southern Observatory.
InsSw WorkShop 2008Observation SW by Eszter Pozna1 Observation Software based on BOSS General Overview Details/Demo Dr Eszter Pozna Instrument SW workshop.
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
Goals and requirements 1 st flexible geometry version Next geometry version development Conclusions and outlook A realistic and flexible VTX geometry in.
Astronomical Observation part II. Spectometry Jubee Sohn
ESO-PSW – N. Kornweibel & P. Baksai ESO Instrumentation Software Workshop N. Kornweibel & P. Baksai Operations at Paranal.
SINFONI data reduction using the ESO pipeline. Instrument design and its impact on the data (I) integral field spectrometer using mirrors brickwall pattern.
1 Scheduling Requirements ● overview ● scheme ● requirements ● open questions.
Single Object Spectroscopy and Time Series Observations with NIRSpec
CNC Motion BenchMill 6000 Machining Center
SPICA: a new visible combiner for CHARA
Jitter test Responsible Parties Test Goals
Mapping EP4.
Overview Modern chip designs have multiple IP components with different process, voltage, temperature sensitivities Optimizing mix to different customer.
NIRSpec Time Series Observations
Observatory Control System
The JWST Coronagraphic Visibility Tool: Overview and Demo
Single Object & Time Series Spectroscopy with JWST NIRCam
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
Data Processing Status
NIRSpec simulation data-package
ESAC 2017 JWST Workshop NIRSpec MSA Planning Tool (MPT)
August 23, 2000 R.N. Dubois Dow Chemical
Detector Parameters Marco Sirianni - ESA.
FLAMES – an overview Features & points to be aware of, relevant to the observer. In addition to p2pp, there is FPOSS. Layout of FLAMES; link to GIRAFFE.
Observing with Modern Observatories (the data flow)
Presentation transcript:

Observations with AMBER  General overview  P2VM  OB preparation with P2PP P2PP / OB / templates Available templates for observation procedure Typical standard OB Outputs : FITS files  Guidelines for AMBER observations

General overview Proposal ACCEPTED P2PP Phase 2 Proposal Preparation BOB Broker for Observation Blocks AMBER software parameters for observation sequence sends Observation Blocks (OBs) VLTI telescopes ARAL finito delay lines … AMBER opto-mechanics detector execute templates control FITS files

P2VM  Pixel to visibility matrix  Needed to calibrate data  Destroyed by spectral instrument configuration modifications  May be time consuming  SENSITIVE POINT: precautions have been taken, all over the observation procedure to avoid loss of P2VM validity due to unfortunate handling to allow new P2VM calculation if necessary or required

OB preparation with P2PP (1) P2PP / OB / templates  P2PP Phase 2 Proposal Preparation Graphical tool to prepare Observation Blocks (OB)  OB Unitary entity for P2PP Sequence constituted of several templates Constraints: −an OB should contain at least an acquisition template and an observation template −only one object by OB (for the moment)  Template Set of files: parameter + reference + script files Get astronomer’s input parameters Actions sequence

OB preparation with P2PP (2) P2PP / OB / templates OB template 1template 2template 3template n … astronomer’s input parameters via P2PP actions OB realisation

OB preparation with P2PP (3) Available templates for observation procedure  Acquisition template VLTI preset P2VM check/realisation AMBER setup VLTI preset/guiding status check  Image optimisation template Flux centering on optical fiber heads with ARAL For each beam, automatic or manual alignment  Flux injection optimisation template Flux optimisation on optical fiber heads with AMBER detector Finito injection optimisation, if finito is used as fringe sensor

OB preparation with P2PP (4) Available templates for observation procedure  Fringes search template P2VM validity check Fringes tracking with finito, if finito is used as fringe sensor AMBER fringe search Fringes centering, if fringes have been found  Observation template P2VM validity check Check for fringes, if finito is used Dark exposure cycle Object exposure cycle Sky exposure cycle, if required

OB preparation with P2PP (5) Typical standard OB OB AMBER_3Tstd_acqAMBER_3T_cal_imgoptAMBER_3T_cal_injadj OB example in 3T mode AMBER_3T_cal_frnsrcAMBER_3Tstd_obs_1row acquisition image optimisation Flux injection optimisation fringes search observation

OB preparation with P2PP (6) Outputs : FITS files OB AMBER_3Tstd_acqAMBER_3T_cal_imgoptAMBER_3T_cal_injadj OB example in 3T mode AMBER_3T_cal_frnsrcAMBER_3Tstd_obs_1row spectral calibration 4 files P2VM 10 files + dark Nd files Nd * NDITd frames object Nobj files Nobj * NDITobj frames column adjustment 1 file Sky, if required Ns files Ns * NDITs frames if fringe contrast SNR calculation is done from images, after each OPD step 1 file

Guidelines for AMBER observations  Save observation time minimizing telescopes pointing changes  telescopes movements instrumental configuration changes  motors movements / P2VM  Possibility to increase detector read-out speed to fix turbulence by limiting detector read-out window size  detector read window size   read pixel number   minimum DIT (Detector Integration Time)