PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.

Slides:



Advertisements
Similar presentations
Bill Blevins Management of the West-North Stability Limit Under the Nodal Market.
Advertisements

IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
Don Blackburn Vice Chair
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
1 Nodal Stabilization Market Call December 28, 2010.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
Comparison of Governor Deadband & Droop Settings of a Single 600 MW Unit A Hz Deadband with a Straight Line Proportional 5% Droop Curve Compared.
Frequency Response Standard. ERCOT Governor Droop.
Texas Regional Entity Compliance Report Board of Directors February 16, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
NPRR 097 DSR and Small Capacity / Low Operating Level Issues for Compliance Monitoring.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC November 4 th, 2010.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
Operational Issues & Risks ERCOT Operations Planning August 22, 2008.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
PDCWG Report to ROS January 14, 2010 Sydney Niemeyer.
Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
Operations Report Kent Saathoff System Operations ERCOT.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
PDCWG 8/25/2015 GTBD Bias Analysis ERCOT Market Analysis and Design PDCWG August 25, 2015.
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
QSE Managers Working Group November 7 th 2011 NPRR 334 – Additional Analysis.
PRR525 SCE Method Comparison ERCOT Compliance December 3, 2004.
Responsive Reserve Service Deliverability Review September 15,
QMWG February 7, 2011 January 2011 GREDP Performance Summary.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
1 Nodal Stabilization Market Call December 27, 2010.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
1 Frequency Control Task Force Report to WMS July 19 th, 2006.
Text reason for Deviation from Defined High Sustained Limit/Low Sustained Limit John Adams January 5, 2010 Nodal Advisory Task Force.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version
1 EEA Workshop 3 April 2, /3/2015For the purpose of discussion only.
PDCWG Report to ROS October 16, 2008 Bob Green PDCWG Chair Garland Power & Light.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Generation to be Dispatched(GTBD) Analysis For the purpose of discussion only PDCWG/QMWG Joint Meeting 11/02/2012.
NSRS in Nodal Proposal for Deployment & Recall Procedures ERCOT ROS 10/12-13/2006 By: S.Niemeyer R.Jones R.Wheeler B.Green J.Dumas P.Breitzman.
Current FRRS Language & Explanation of Posted Data
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Congestion Management and Ramp Rate for Delivering Ancillary Services
PDCWG David Kee, Chair Sydney Niemeyer, Vice Chair
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Sandip Sharma ERCOT Manager, Operations Planning
Presentation transcript:

PDCWG Report to ROS January 13, 2011 Sydney Niemeyer

CPS1 = 141.7

ERCOT CPS1 Score CPS1 12 Month Rolling Average =

Same 600 MW unit with MW movement due to all frequency change each year.

ERCOT Total Load and Wind Generation Data source not EPS quality. Confidence in data is good with some telemetry errors scrubbed. Next three slides for reference only.

ERCOT Discontinued ICCP data of Total Wind Generation so no data is available to report. This report will be discontinued.

Frequency Event Evaluations ERCOT has developed a new Excel Spreadsheet to evaluate each generator’s performance during events. This is the first month that the PDCWG has used the spreadsheet to review an actual event while on Nodal dispatch. –We are slow at learning to navigate and still discovering what information would help speed the analysis. –The tool includes a graph of each generator’s actual generation, updated Base Point, frequency and Generator Expected Generation. The Expected Generation includes any Regulation Deployed and expected frequency response. –The graphs are clear and it is easy to determine if the generator delivered regulation, provided frequency response and followed their base points. –It contains all generators in ERCOT and it is difficult to determine which generators to look at. We will determine a method of identifying key players in each event. (similar to the summing of generator’s change in base points that I did for the low frequency event). This evaluates SCED’s performance as well. Reference slide 19 in this report.

Dec 21, :06 Low Frequency Review Differences between Nodal and Zonal –In zonal, Responsive Reserve would have automatically deployed at 21:59 when frequency reached Hz. Resources would have responded quickly to the schedule change in the SCE equation to deliver the RRS. Nodal only moved Resources based on LMP without the knowledge of the amount of MW Resources were ramping off line. Zonal SCPS 1 & 2 measured QSE performance while ramping generation on and off line while schedules and balancing deployments accounted for generation ramping off line. Regulation is deployed based on the frequency deviation. When SCED runs, it will adjust the Base Points to recover the deployed Regulation and accounts for forecasted load change.

Except for 22:02, SCED ran every minute between 21:59 and 22:08. (9 runs in 10 minutes) Generators with increasing Base Points had a total MW change in BP of 1403 MW beginning 21:59 on 25 different generators. Wind 65 MW and hydro generators about 175 MW BP change is included in total BP change. During the same time period load decreased about 550 MW. (21:59 to 22:08)

Wind generation to the rescue. Output increased 64 MW during the severe low frequency period.

Ideas to Consider Generators ramping off line could set HSL equal to their normal LSL when beginning to ramp down. Or lower their HSL in stages down to LSL. When operating below normal LSL during the shutdown process the LSL and HSL could be set to zero. –This would give SCED the information earlier to adjust other generator’s BP. Ramp rate differences could still be an issue (SCED Updated Base Point vs. actual unit shutdown ramp rate). SCED could include an adjustment for Load Dampening that would move Base Points faster to account for Load that has decreased due to low frequency or load that has increased due to high frequency. This value would ramp to zero as frequency returned to 60 Hz. The PDCWG has a formula to calculate this value in real time. Reference the 60 Hz load trend on the previous Load Graph.

Dec 22, 2010 High Frequency Event Out of Down Regulation. Off Line generation ramping to LSL similar to previous day’s low frequency event only opposite direction. SCED without ability to ramp the Units based on ramp rate due to ONTEST status of generators in start-up target MW. Please refer ERCOT Market Notice to mitigate this issue. Detailed analysis of each generator and SCED Base Point changes has not been completed at this time.

Sudden load drop at 04:47 was caused by non- conforming load change. Not a contributing cause but it did delay the recovery.

Wind generation increased about 150 MW during the high frequency period. This is not a major contributing cause but it did delay recovery.

PDCWG Meeting Jan 4, 2011 Frequency Event review –The PDCWG would like a SME from ERCOT to attend the next meeting so members can learn about the details of SCED’s operation and LFC. Request approval of the new PDCWG Scope. The PDCWG would like to review GREDP scores each month of all generators to evaluate the effectiveness of the metric. The PDCWG would like to work with ERCOT on LFC Regulation deployment tuning as several members believe Regulation is over- controlling generation. A sample graph of over deployment is included. The PDCWG is concerned that the Base Point Deviation charges do not account for the delivery of frequency response. Some fifteen minute periods have frequency deviations greater than +/ Hz one direction but average frequency is the opposite direction for the fifteen minute period. This could penalize generators that provide a vital reliability service. Three Frequency Events in December had multiple sympathetic unit trips. Proper implementation of frequency response and generator control tuning is a concern. Further analysis of these events is needed. PDCWG will meet again February 2, 2011.

The PDCWG believes that too much Regulation was deployed for each of these frequency oscillations.