NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.

Slides:



Advertisements
Similar presentations
T&D Losses Reflecting Losses in DR within ERCOT August 22, 2012.
Advertisements

Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Automation and Improvements to Default Uplift Methodology (summary/white paper of a draft NPRR)
CRR Shortfall – Revenue Equalization Part 2 (Continuation from 2/21/08 TPTF discussion) Bill Barnes TPTF 3/5/2008.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
Concerns with RUC Capacity Short Charge and Energy Trades.
DSWG Update to WMS May 17, DSWG Goals Update.
NPRR605 Ancillary Service Make-Whole Payments Under a Watch.
Loads Acting as a Resource Relationships with QSEs and LSEs
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Ancillary Services – Day-Ahead & Real Time Markets Mini Market.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Item 8, Technical Advisory Committee Meeting April 8, 2010.
Texas Nodal Section 9: Invoicing ERCOT, Settlements & Billing SDAWG - August 2007.
1Texas Nodal Nodal Day-Ahead Market Update Special NATF Meeting July 19, 2010.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
Graph Trend Definitions Telemetered SCE: Sum of all QSE’s Telemetered SCE (uses “Left” scale). Regulation Deployed: Sum of all Regulation Ancillary Service.
Nodal Credit DAM Non-Business Day Treatment of Available Credit Limit (ACL)
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Market Credit Working Group Update to WMS Wed. Sept 16, 2009.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
Carrie Tucker Supervisor, Day-Ahead Market DAM data supporting MCWG/CWG credit parameters discussion February 29, 2012.
GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Co-ordination of Power Balance Penalty Curve, VOLL, SWOC for AS Demand Curves.
Ancillary Services Replacement Presenter: Ino González Wholesale Market Subcommittee July 8, 2015 ERCOT Public.
ERCOT CWG/MCWG April 24, 2013 DAM Credit Parameters.
1 Nodal Stabilization Market Call December 03, :30 PM.
PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006.
Settlement Update Blake Holt ERCOT 2/15/2016. Agenda NPRR689 – R1 – 02/10/16 NPRR744 – Buy-Back notification NPRR746 – Negative load impacts 2016 Settlement.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
DAM Self-Commitment Issues & Solutions Shams Siddiqi, Ph.D. (512) March 3, 2008.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
1 Market Trials DAM/RUC/SASM Weekly Update March 19, 2010.
October, 2011 MCWG/CWG Review of Abacus Loss Allocation ERCOT Mandy Bauld.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Ancillary Services Replacement
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
John Dumas Director, Wholesale Market Operations
Ancillary Service Trades and Ancillary Service Settlement
Real-Time Co-optimization of Energy & Ancillary Services
Settlement Update Austin Rosel ERCOT October 11, 2017.
Real-Time Co-optimization of Energy & Ancillary Services
Presentation transcript:

NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015

2/12/ DAM does not directly consider trades QSEs can submit self-arrangement in DAM for their AS obligation (AS plan X load ratio share) to be covered by resources or trades Day-Ahead Market AS Procurement Ancillary Services Plan Sum of QSE self- arrangement Ancillary Services Procurement

2/12/ AS Responsibility Check starts at 1430 and checks for missing AS on a QSE-level –If your QSE AS Responsibility>0, ERCOT checks that the Sum of AS capacity in COPs for all QSE’s Resources = QSE AS Responsibility AS Responsibility Check AS Bought in Trades Total AS Offer awards QSE AS Responsibility Self-Arranged AS AS Sold in Trades COP AS capacity

2/12/ QSE A (Load, No Resources): AS Obligation 40 MW Trade 50 MW with QSE B Current implementation - example Enters self-arrangement of 40 MW QSE B either: Puts 50 MW of capacity in COP Enters negative self- arrangement of 50 MW Scenario 1 Scenario 2 Result (assume no other self-arrangement): QSE A receives nothing for the extra 10 MWs Scenario 1 – DAM procures 80 MWs and 130 MW of AS is provided in Real-Time (10 MW more than needed). Scenario 2 – DAM procures 130 MW (10 MW more than the AS Plan) AS Plan = 120 MW

2/12/ QSE A (Load, No Resources): AS Obligation 40 MW Trade 50 MW with QSE B Current implementation - example Enters self-arrangement of 50 MW QSE B either: Puts 50 MW of capacity in COP Enters negative self- arrangement of 50 MW Scenario 1 Scenario 2 Result (assume no other self-arrangement): QSE A is paid MCPC for 10 MW of AS. Scenario 1 – DAM procures 70 MWs and 120 MW of AS is provided in Real- Time (the amount needed). Scenario 2 – DAM procures 120 MW (the exact AS Plan). AS Plan = 120 MW