WP7 Security Coordination 23/24 Jan 2002 David Kelsey CLRC/RAL, UK

Slides:



Advertisements
Similar presentations
24-May-01D.P.Kelsey, GridPP WG E: Security1 GridPP Work Group E Security Development David Kelsey CLRC/RAL, UK
Advertisements

WP2: Data Management Gavin McCance University of Glasgow November 5, 2001.
5-Dec-02D.P.Kelsey, GridPP Security1 GridPP Security UK Security Workshop 5-6 Dec 2002, NeSC David Kelsey CLRC/RAL, UK
Partner Logo UK GridPP Testbed Rollout John Gordon GridPP 3rd Collaboration Meeting Cambridge 15th February 2002.
© Crown Copyright (2000) Module 3.2 Evaluation Management.
Gridification Task Development Plan for Release 1.1 – 2.0 For Gridification: David Groep
5-Sep-02D.P.Kelsey, Security Summary, Budapest1 WP6/7 Security Summary Budapest 5 Sep 2002 David Kelsey CLRC/RAL, UK
30-Jan-03D.P.Kelsey, GridPP Security1 Security GridPP6 30 Jan 2003 Coseners House David Kelsey CLRC/RAL, UK
Authentication Policy David Kelsey CCLRC/RAL 15 April 2004, Dublin
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
Thoughts on the ATF of the DataGrid 24 th –25 th May 2001 Steve Fisher / RAL.
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
13-May-03D.P.Kelsey, WP8 CA and VO organistion1 CA’s and Experiment (VO) Organisation WP8 Meeting EDG Barcelona, 13 May 2003 David Kelsey CCLRC/RAL, UK.
BMAN Integrative Team Project Week 2 Professor Linda A Macaulay.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
12-May-03D.P.Kelsey, SCG Online Authentication1 Online Authentication SCG Meeting EDG Barcelona, 12 May 2003 David Kelsey CCLRC/RAL, UK
CERN Technical Coordinators Report PTB, 3 rd July 2002 Bob Jones.
Ákos FROHNER – DataGrid Security Requirements n° 1 Security Group D7.5 Document and Open Issues
Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC1 Task 3.5 Test and Integration (
CERN – Roberta Faggian Marque, Jan Fiete Grosse-Oetringhaus GRACE General Meeting, September 2004, Brussels 1 D6.1 Integration with the European DataGrid.
9-May-02D.P.Kelsey, Security Plans, GridPP41 Security: Plans 9 May 2002 GridPP4 meeting, Manchester David Kelsey CLRC/RAL, UK
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
Security Area in GridPP2 4 Mar 2004 Security Area in GridPP2 “Proforma-2 posts” overview Deliverables – Local Access – Local Usage.
Grid Workload Management Massimo Sgaravatto INFN Padova.
BTS330: Business Requirements Analysis using OO Lecture 7: Understanding User Requirements.
Security Policy Update LCG GDB Prague, 4 Apr 2007 David Kelsey CCLRC/RAL
3-Nov-00D.P.Kelsey, HEPiX, JLAB1 Certificates for DataGRID David Kelsey CLRC/RAL, UK
10-May-01D.P.Kelsey, Security Workshop Summary1 DataGrid Security Workshop 29/30 March 2001 SUMMARY David Kelsey CLRC/RAL, UK
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
3-Jul-02D.P.Kelsey, Security1 Security meetings Report to EDG PTB 3 Jul 2002 David Kelsey CLRC/RAL, UK
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
30-Sep-03D.P.Kelsey, SCG Summary1 Security Co-ordination Group (WP7 SCG) EDG Heidelberg 30 September 2003 David Kelsey CCLRC/RAL, UK
10 May 2001DataGrid WP6 Meeting, CERN1 GRID The GRID Installation Toolkit A brief report F. Donno INFN - Pisa.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
15-Dec-04D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Update (Report from the Joint Security Policy Group) CERN 15 December 2004 David Kelsey CCLRC/RAL,
EGEE is a project funded by the European Union under contract IST WBS/ Execution Plan Alistair Mills Grid Deployment Group
23-Oct-02D.P.Kelsey, Grid Security, HEPiX, FNAL1 LCG/EDG Security - update and plans HEPiX/HEPNT - FNAL 23 Oct 2002 David Kelsey CLRC/RAL, UK
Summary of AAAA Information David Kelsey Infrastructure Policy Group, Singapore, 15 Sep 2008.
DGC Paris WP2 Summary of Discussions and Plans Peter Z. Kunszt And the WP2 team.
2-Sep-02D.P.Kelsey, WP6 CA, Budapest1 WP6 CA report Budapest 2 Sep 2002 David Kelsey CLRC/RAL, UK
Security Policy Update WLCG GDB CERN, 14 May 2008 David Kelsey STFC/RAL
11-Dec-00D.P.Kelsey, Certificates, WP6 meeting, Milan1 Certificates for DataGrid Testbed0 David Kelsey CLRC/RAL, UK
Summary from WP 1 Parallel Section Massimo Sgaravatto INFN Padova.
10 May 2001WP6 Testbed Meeting1 WP5 - Mass Storage Management Jean-Philippe Baud PDP/IT/CERN.
Report from DataGrid Technical Board Massimo Sgaravatto INFN Padova.
8-Mar-01D.P.Kelsey, Certificates, WP6, Amsterdam1 WP6: Certificates for DataGrid Testbeds David Kelsey CLRC/RAL, UK
T Project Review Muuntaja I1 Iteration
12-Jun-03D.P.Kelsey, CA meeting1 CA meeting Minimum Requirements CERN, 12 June 2003 David Kelsey CCLRC/RAL, UK
18-May-04D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Update (Report from the LCG Security Group) Barcelona 18 May 2004 David Kelsey CCLRC/RAL, UK
WP1 Status and plans Francesco Prelz, Massimo Sgaravatto 4 th EDG Project Conference Paris, March 6 th, 2002.
B.Jones– July n° 1 Software Release Testing u Draft document prepared and attached to the agenda page for this meeting u Explains the testing steps.
Plans for D7.7 The Security Report on the Final Project Release Linda Cornwall, RAL.
10-May-01D.P.Kelsey, WP6 Security1 Certificates/Authorisation for DataGrid Testbeds David Kelsey CLRC/RAL, UK
7-May-03D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Issues and Planning or Report from the Security Group CERN, 8 May 2003 David Kelsey CCLRC/RAL, UK.
11-May-01D.P.Kelsey, Security Update1 GRID Security Update David Kelsey CLRC/RAL, UK
CERN 1 DataGrid Architecture Group Bob Jones CERN.
DataGrid Security Wrapup Linda Cornwall 4 th March 2004.
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
DataGrid and CrossGrid Helpdesk CERN, 30th October 2002 EDG WP6 meeting Sophie Nicoud (CNRS-Marseille) and José Salt (IFIC-Valencia)
15-Jun-04D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Update (Report from the LCG Security Group) CERN 15 June 2004 David Kelsey CCLRC/RAL, UK
7-Mar-01D.P.Kelsey, User access, WP6, Amsterdam1 WP6: GRID mapfiles and Users access policy David Kelsey CLRC/RAL, UK
David Kelsey CLRC/RAL, UK
EGEE Middleware Activities Overview
David Kelsey CCLRC/RAL, UK
EO Applications Parallel Session
Update on New NSDS Guidelines
Presentation transcript:

WP7 Security Coordination 23/24 Jan 2002 David Kelsey CLRC/RAL, UK

24-Jan-02D.P.Kelsey, WP7 Security Coord2 Task Agenda New people: Akos Frohner (CERN), Robert Harakaly (CNRS) also Sophie Nicoud (CNRS) Wednesday 23 rd Jan 2002 –Deliverable D7.5 Thursday 24 th Jan 2002 –D7.5 (cont’d) –Status and plans for WP6 Authorisation Group (Roberto) –Status and plans for DataTAG WP4 and SecureGrid (Leon) –Generic AAA model in Grids – IETF presentation (Leon) –Online Credential Retrieval (Akos) work in Hungarian Grid – development of MyProxy –Future plans (D7.6 Security Design and Release 2) –Next meeting(s)

24-Jan-02D.P.Kelsey, WP7 Security Coord3 D7.5 (M15 report) Security Requirements and Testbed-1 report V0.1 7 Dec 2001 V0.221 Jan 2002 Much discussion on structure and scope –E.g. Accounting is outside the scope (WP1)

24-Jan-02D.P.Kelsey, WP7 Security Coord4 D7.5 structure Ch1Introduction Includes definition of security terminology Ch2Executive summary Ch3What is Security? Start with general description Function types –Authentication, Authorisation… Requirement classes –Reliability, Security, Ease of use, Manageability Scope of Security in DataGrid and document Description of Globus GSI Assumptions

24-Jan-02D.P.Kelsey, WP7 Security Coord5 D7.5 structure (cont’d) Ch4Security Requirements Some are needs and/or constraints Organised by function types Matrix of functions vs requirementsMatrix Ch5Security Implementation in Testbed-1 Not too detailed, leave something for D7.6 Ch6Requirements satisfied by Testbed-1 and future plans

24-Jan-02D.P.Kelsey, WP7 Security Coord6 D7.5 (cont’d) V0.31 st Feb 2002 –Structure agreed here will be implemented V115 th Feb 2002 –Internal working version for contact with WP Individuals assigned to contact each WP –Prepare full list of requirements –Describe Testbed 1 V1.11 st March 2002 –Full text for review by group –Prepare Chapter 6 – Future plans V215 th March 2002 –Ready for external review

24-Jan-02D.P.Kelsey, WP7 Security Coord7 D7.6 (M25) Security Design and Testbed 2 Input –Requirements from D7.5 and future plans –From each WP EDG ATF –Being re-convened (1 st meeting in Paris) –Need a representative from Security –Security group and ATF must be complementary

24-Jan-02D.P.Kelsey, WP7 Security Coord8 Plans for release 2 Not yet defined –But WP’s have own plans –e.g. WP1 credential renewal, WP3 info services Input from full list of requirements in D7.5 and from WP contacts We have coordination role and duty to check security designs and implementations WP6 Authorisation group will test prototype CAS, together with WP1 and WP2 (soon?) Security group unlikely to develop any code –Will be done by WPs, Authorisation group or DataTAG

24-Jan-02D.P.Kelsey, WP7 Security Coord9 Future meetings Wish to continue meeting with WP7 and DataTAG –But should avoid parallel meetings Several people in common! We need half a day on Tuesday 5 th March – Paris –Finalise D7.5 –Define future plans (Chapter 6 in D7.5) Next WP7 meeting? (April, May?)