Impact Assessment Mod_17_12 : Report on Offered Capacity in Implicit Auctions 24 October 2012.

Slides:



Advertisements
Similar presentations
Western Electricity Coordinating Council Identify, coordinate, and propose solutions to seams issues Participate, monitor and communicate the development.
Advertisements

INTRA-DAY TRADING: Conference Call COD for Interconnector Units in WD1 Ending Overlap Optimisation Period (EOOP) 29 November 2011.
All-Island Energy Market Forum James Hutchinson Head of Electricity Markets Ofreg Drogheda 12 March 2004.
Mod_34_11 : Transition to SEM Intra-Day Trading 6 December 2011.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Trading & Settlement Code modification Mod 21 / 12 Amendment to Available Transfer Capacity (ATC) definition.
Assessment of differences in market designs in the CS region Milan 18 July 2008.
Third Energy Package for Change of Supplier 2009/73/EC.
Bente Danielsen, ERGEG Transparency Project Team leader Alain Taccoen, ENTSO-E WG Market Information and Transparency, convenor Florence Forum June 2010.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
Introduction of an Intraday market on the Italian borders for the year 2011 Terna proposal Electricity Regional Initiative – CSE Region 15th Implementation.
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
Update on Coordination of long term auctions in the FUI region FUI IG, London, 13 th September.
Mod 26_12 Notification Time for updating Interconnector Technical Data.
MOD_17_12 Report on Offered Capacity in Implicit Auctions.
Market Systems Release Update Modifications Committee Meeting 48 April 11 th
Market Systems Release Update Modifications Committee Meeting 58 December 4 th
Draft document – Work in progress
Intra-Day Trading Project Market Participant Technical Overview 3 rd August 2011, am – 13:00 pm Conference call number: , pin:
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 29 May 2012.
Modification MOD_24_12 Amendments to the MIUN Calculator to address instances of Excessive Area.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
CASC.EU SA and its role in Explicit auctions 16/11/2010 CASC.EU SA 1.
Intraday cross border continuous market and optional Intraday auctions “Economically optimized nomination phase”
Modifications Committee Mod_18_10: Intra-Day Trading 25 November 2010.
1 Meeting the Regional Electricity Market Opportunities South East Europe Energy Week “Athens Forum” Meeting Rome, March 2003.
Market Systems Release Update Modifications Committee Meeting 49 June 13 th
Leading Edge Climbing Equipment
INTRA-DAY TRADING DESIGN Future Options for Limited Communication Failure (LCF) 27 September 2011.
Mod_18_10 Intra Day Trading Conference Call Commercial Offer Data for Interconnector Units in Ending Overlap Optimisation Period (EOOP) for WD1 MSP Software.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 31 January 2012.
Transparency requirements in accordance with the provisions of Regulation 715 M.Sc. Aleš Osrajnik Ljubljana, 13 September, 2012 ACER Workshop on Transparency.
INTRA-DAY TRADING Development of Modification(s) 1st February 2011.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 25 September 2012.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.
1 Market Operator User Group Meeting 1 Market Operator User Group Meeting 13 th of March 2012 The Oval, Dublin Conference Call Number:
SEM – One Year On Liam Ryan, Market Operations Manager.
INTRA-DAY TRADING Modification Development 5 April 2011.
INTRA-DAY TRADING DESIGN Changes required to the MIUN Calculation for SEM Intra-Day Trading 27 March 2012.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 31 July 2012.
1 Mod_18_10 : Intra Day Trading in the SEM Working Group 4 August 19 th 2010 SEMO High-Level Impact Assessment.
Mod_18_10_v2 : SEM Intra-Day Trading 6 December 2011.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
Update on IFA Actions Congestion Management Guideline Workshop Thursday 11 th January, CRE Offices, Paris Simon McVeigh, IFA Manager, National Grid Interconnectors.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
BritNed Investing in interconnection capacity Damian Bach France-UK-Ireland Stakeholder Group meeting 4 th July 2008, Sellindge, Kent.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 27 March 2012.
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
© 2007Slide 1 Solution Outline for Day-ahead Capacity Trading at Interconnection Points Marco Wettig Dublin, April 24th 2007.
CASC.EU – Capacity Allocation Service Company CASC.EU SA 23/11/10CASC-EU S.A. (R)
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Mod_06_12 Improved Efficiencies in LCF Process 31 January 2012
Regulators’ update on Congestion Management and Balancing
Under Test End Dates 1st February 2011.
* Amendment to Appendix P to ensure correct treatment of Interconnector Unit Offer Data 29th May 2012 * 1##
Intraday cross border continuous market and optional Intraday auctions
Publication of Historical Gas Operational Data by National Grid NTS
MOD_10_18 Amendment to Capacity Settlement Statement Publication from Monthly to Daily 13th March 2018.
Transmission Workstream – 6th July 2005
Intraday cross border continuous market and optional Intraday auctions
Information Provision for Transitional Exit Capacity
Presentation transcript:

Impact Assessment Mod_17_12 : Report on Offered Capacity in Implicit Auctions 24 October 2012

Proposed report to publish the following: Maximum Export Available Transfer Capacity - ∑(Modified Interconnector Unit Nominations for all completed Ex-Ante MSP Software Runs) Maximum Import Available Transfer Capacity - ∑(Modified Interconnector Unit Nominations for all completed Ex-Ante MSP Software Runs) Both reports published after EA1 MSP Software Run and again after EA2 MSP Software Run Reports not published after EA2 if EA2 cancelled Reports not re-published if ATC changes Impact Assessment of Mod_17_12

SEMO examined two possible implementation options: Option 1: Implement in the Central Market System (ABB) Option 2: Implement as a report generated by the MIUN Calculator and FTP result to SEMO website Action from Meeting 44 to assess which option would deliver report most quickly to Participants SEMO Impact Assessment

Option 1: Implement in the Central Market System (ABB) Cost : €32,560 + testing Will use existing proven reporting system of (HTML, XML etc.) Report will be available in both the MPI and on the website Report should be available more quickly after MSP Software Run than Option 2 SEMO Impact Assessment

Option 2: Implement as a report generated by the MIUN Calculator and FTP result to SEMO website Cost : €34,000 + testing Would involve interfacing the solutions of two vendors Report will be available on the website only SEMO Impact Assessment

Next Steps SEMO proposes proceeding with Option 1 if the proposal is recommended for approval

Update from TSOs on compliance review of options The current transparency requirement as per 5.6 of Annex I of the Regulation 714/2009: “All relevant information shall be available for the market in due time for the negotiation of all transactions (such as the time of negotiation of annual supply contracts for industrial customers or the time when bids have to be sent into organised markets).” Offered Capacity publication after the EA2 gate will have plenty of time before WD1, but it is the publication after the EA1 gate for use by the market participants in EA2 that is under time pressure Both options will meet the timescales – the report will typically be produced and published by 10:30, an hour in advance of EA2 The ABB implementation (option 1) allows for a faster generation of the report and fewer points of failure so is the more robust of the options