Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.

Slides:



Advertisements
Similar presentations
Radiation Protection aspects of the Switch-Yard operation V. Donate, G. Dumont, Joachim Vollaire on behalf of DGS-RP.
Advertisements

Internal H0/H- dump Cesare Maglioni, Melanie Delonca Thanks to: R. Chamizo, R. Versaci, O. Aberle, J. Borburgh.
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
BLM review Mario Santana Leitner OUTLOOK ON FLUKA SIMULATIONS FOR UDULATOR DAMAGE AND BLM RESPONSE Mario Santana Leitner, Alberto.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
Status Report of the PSB Half-Sector and Stripping Foil Test in L4T
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
First AWAKE dump calculations Helmut Vincke. Beam on dump Muon axis inside and outside CERN Distances: Beam impact point to end of West hall: ~300 m Beam.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
The Status of ESS Accelerator Shielding and Accident Scenarios Lali Tchelidze May 26, 2014.
Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Radiation safety evaluation for “KAMABOKO” Main Linac Tunnel KEK-APL : T.Sanami, S.Ban KEK-ACC : A.Enomoto, M.Miyahara ILC Mechanical & Electrical Review.
Vacuum sectorisation H- Injection Some history Wim Weterings
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
SiriusUVX LNLS – National Synchrotron Light Laboratory CNPEM – Brazilian Center for Research on Energy and Materials A R Rodrigues, M Lisboa, R Madacki.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Status of Radiation Protection Studies for the Linac4 beam dumps Joachim Vollaire DGS/RP.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 Radiation Monitoring at CTF3 CTF3 Buildings – weak spots Radiation Monitoring system Monitoring results – First Lessons Idelette Floret, Thomas Otto,
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
Integration of CLIC TBM in CLEX Electronics allocation and cables tracing Wilfrid Farabolini (CEA/IRFU) 16 October 2013.
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
Possible Layout of Positron Target Region Peter Sievers and Kaoru Yokoya MiniWS, KEK 2016/4/19 Target Region Layout, Yokoya 1.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Status of the FAIR pbar target: Target handling study (M. Helmecke)
CENF SB WG report CENF PTM meeting 25 th July 2013 M. Calviani for the CENF SB team.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
Linac4-PSB 160 MeV connection readiness review
Shielding Design for LCLS Injector Operation – Phase one
X PS Internal Dump Core Review François-Xavier Nuiry Giulia Romagnoli
Residual dose rates in the FCChh detector
Options and Recommendations for TL and Dumps
Radiation protection of Linac4 M. Silari Radiation Protection Group
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Andreas Jansson, Lali Tchelidze
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
Bunker Wall Design Wall
Bunker Wall Design Wall ESS
Presentation transcript:

Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting

Outline Status of RP studies and plan for the Linac2/Linac4 interface LBE beam dump (very preliminary)

RP studies and plan for the Linac2/Linac4 interface

Shielding Calculations Detailed FLUKA geometry of the area Considering permanent beam losses occurring between the vertical bending magnet and the BHZ20: 5 W in the bending magnets 1 W/m (10 W) distributed losses Much more than what has been considered for the Linac4 itself (overkill ?) Shielding implementation to limit the stray radiation levels due to the Linac4 operation in accessible areas: Building 363 Building 351 (Linac3) Outside

Sectorisation Current Linac2 envelop is becoming part of the Switch-Yard (baseline) New EISs for the Switch-Yard and no access to the new Switch-Yard sector with ion beam in the PS or in LEIR Considering new envelope to allow space for Linac(5 ?)…. ? ?

Layout

Building 363… in pictures

From 363 to 351

Inside the Linac2

Shielding element The “Chateau”: (top 1 m / thin side 50 cm / thick side 120 cm Include the “survey hole” and cable tray… Will block the current emergency exit of Linac2 Opening at the end of the Linac2 toward the switch-yard (currently filled with small blocks)

The “Wall” 1 m thick 6 m high Two half cylinder for cables (30 cm radius) Block the emergency exit from Linac4 New door facing the Linac4 door toward Linac2… Power cables to be re-routed (new opening)

The chicane(s) 80 cm thick concrete shield The “Chicanes” 80 cm thick – 180 cm side 170 cm opening to allow the passage of the BHZ20 (sufficient ?) To be validated by integration studies

FLUKA model 3 D view of the FLUKA geometry

Some FLUKA results (Horizontal view) Linac4 levelAmplifier gallery level Racks area level Beam losses : W ?

Vertical views

View perpendicular to the L2 beam (B351)

Possible sequence for the connection 1.Removal of L2 chicane (not needed for Linac4 operation) 2.Dismantling of Linac2 beam lines 3.Drilling of new door 4.New opening for cables 5.Re-routing cables and “grouping” remaining ones (services ?) & 5

Possible sequence for the connection 6.Chateau construction 7.Wall construction 8.Connection 9.Chicanes installation…

Others…. Infiltration on the Linac2 side, can something be done ? Removal of LT.STP.10 ? (not needed anymore…) Ventilation of the new area ? Air tightness with the PS enclosure…. Dismantling of wall close to the Linac2 dump (see next slide) ?

Possible dismantling of concrete blocks ? Most likely build for periods with beam parked on the beam dump (tbc)

LBE beam dump (very preliminary)

LBE beam dump pulse current and duty cycle spot size (mm x mm) duration Commissioning40 mA 400microsec 1.11 Hz (0.04%) 3 x 3~1month (6hour/day) PSB Operation40 mA 400microsec 1.11 Hz (0.04%) 3 x 3Occasionally LBS dump used only for ions

Possible shielding ? Main dump like not possible and not justified Test with the HST trolley shielding

Residual Dose rate at the end of commissioning Iron Borated concrete 8 hours cool down1 day cool down Horizontal view

Residual Dose rate at the end of commissioning Iron Borated concrete 8 hours cool down1 day cool down Vertical view

Residual Dose rate at the end of commissioning 8 hours cool down 1 day cool down Horizontal view 1 Week cool down Iron Borated concrete 1 month cool down 6 months cool down

Conclusions LBE Concrete of trolley not efficient Integration of iron shielding : Laterally 20 cm (min.) Back side 20 cm and 10 cm on front side Verification with integration studies and FLUKA