For Layout of ILC 20050601, 20050606 revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.

Slides:



Advertisements
Similar presentations
Linear Collider AD&I Update N. Walker, E. Paterson, V Kuchler, T. Lackowski, J. A. Osbourne,J. Clarke, A. Wolski, S. Guiducci, N. Solyak,… Norbert Collomb30/08/2009.
Advertisements

Most slides from September 2006 MAC meeting ILC Cost Versus Performance (Parameter Choices) Tor Raubenheimer SLAC.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
November 2005M. Woodley1 ILC Beam Delivery System layout with end-of-linac undulator.
Linear Collider Machine Protection Issues M. Palmer Injection System Injector Damping Rings Bunch Compressor and Transfer Sections Main LINAC Beam Delivery.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Linac e+ source for ILC, CLIC, SuperB, … Vitaly Yakimenko, Igor Pogorelsky November 17, 2008 BNL.
Compton based Polarized Positrons Source for ILC V. Yakimenko Brookhaven National Laboratory September 12, 2006 RuPAC 2006, Novosibirsk.
Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Global Design Effort 22 March 2007 Tor Raubenheimer1 ILC Machine Overview and Critical R&D ALCPG Meeting Tor Raubenheimer.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
1 Options for low energy spin manipulation Ken Moffeit, SLAC 2009 Linear Collider Workshop of the Americas 29 September to 3 October 2009 K. Moffeit, D.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
Status of ILC Global Timing Ewan Paterson For Global Timing Working Group Masao Kuriki, David Rubin, Benno List, Ewan Paterson, Kaoru Yokoya LCWS 2014.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
ParameterL-bandS-bandX-band Length (m) Aperture 2a (mm) Gradient (Unloaded/Loaded) (MV/m)17/1328/2250/40 Power/structure (MW) Beam.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
EIC Users Meeting, SBU, 6/27/14 Polarized Electron Beams in the MEIC at JLab Fanglei Lin for MEIC Study Group EIC Users Meeting, Stony Brook University,
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Review Layout of E- Linac Side of Central Region for Feb 10,2011 Meeting For E+ use Norbert’s data from CF&S meeting 12 th July, 2010, which has coordinates.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
ILC - Upgrades Nick Walker – 100th meeting
Integration Ideas for the Central Region Some old some new
Summary of WG2 :CFS for staging
Linac possibilities for a Super-B
CLIC Main Beam Sources and their transfer lines
Large Booster and Collider Ring
Status and Plan of GDE Design Work (Including Road Map for RDR)
RTML Design and Cost reduction Nikolay Solyak Fermilab
CLIC Civil Engineering Update
Cost Comparison of Undulator and e-Driven Systems
Electron Polarization In MEIC
CLIC source update CLIC main beam injectors reminder
Electron Source Configuration
ILC 3.2 km DR design based on FODO lattice (DMC3)
ILC 3.2 km DR design based on FODO lattice (DMC3)
Linear Collider Positron Source and Central Integration Update
Central Region Working Group
AC Power for a Super-B Factory
Super-B Factory in a “4400m” Tunnel
Cost Algorithm for a Super-B Factory
J. Seeman Perugia Super-B Meeting June 2009
Transfer Line for EIC.
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
Beam-beam simulations
Electron mode A B C D > 4 GeV e- θ g e- DR α PS
Presentation transcript:

For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the undulator at Ebeam = 150 GeV (USTOS) Damping Ring: Dogbone DR, sharing tunnel with Main Linac. Avoid DR - Main Linac interference in the first stage. (Oide - scheme) Turn Around: 180 degree turn around after damping rings. This scheme allows orbit feed-forward. Two alternative plans without undulator are also shown. Layout of the interaction region can be the same as in GLC Road Map report, tentatively. Numbers with ‘?’ should be re-considered or reviewed by experts.

Electron main linac Electron main linac for energy upgrade Positron capture and accelerator Positron transfer line Undulator IPs Electron damping ring Electron injector Collimator and final focus Positron main linac Positron main linac for energy upgrade Low emittance electron transfer line Low emittance positron transfer line Positron damping ring Conventional positron source and injector Positron transfer line IPs Collimator and final focus Schematic Layout of Beam Line (Conventional and Undulator e+ source)

e+ main linac (20.2 km) e+ DR (Straight section 7 km) e- DR (Straight section 7 km) e- main linac (21.2 km) e+ BDS (1.9 km) e- BDS (1.9 km) Undulator e+ source, 5 GeV Linac (total ~ 1km) Spin rotator + Bunch compressor Detector halls Dump halls Schematic Layout and length of each part e- source e- 5GeV Linac (total 400 m) e+ sourece, e+ 5 GeV Linac (total 1 km) Turn around 6.1 km

e+ DR e- DR Energy upgrade scheme No DR-ML interference in the first stage. (Oide - scheme) Main Linac from the beginning Main Linac for upgrade to 1 TeVMain Linac from the beginning Main Linac for upgrade to 1 TeV Electron Positron IP

Damping Ring geometry (similar to TESLA-TDR) 3.5 km Center point. Left side is 180 degree rotation symmetry

Damping Ring Arc region by US Technical Option Study

5 GeV Electron Injector Linac + Spin Rotator (total 400 m) Electron Main Linac Electron Damping Ring Electron Injection to Damping Ring Utility Tunnel Electron Injector Main Linac DR Transfer line Positron transfer line

Utility Tunnel Or, may be Electron Injector Main Linac DR Transfer line

Electron Main Linac Electron Damping Ring Electron Extraction from Damping Ring Low emittance 5 GeV electron transfer line Spin Rotator + Bunch Compressor (400 m?) Positron transfer line

Positron Main Linac Positron Damping Ring Positron Injection to Damping Ring 5 GeV positron transfer Line (undulator base) Electron linac + Target + capture section + Positron Injector Linac (Total 1000 m, conventional ) Utility Tunnel Injector Tunnel Main Linac DR

Positron Main Linac Positron Damping Ring Bunch Compressor + Low Emittance 5GeV positron transfer line Positron Extraction from Damping Ring Extraction

Turn around (same geometry as DR) Electron (mirror symmetry for positron) Main Linac start

Undulator region (300 m) Positron production and capture (50 m?) Positron 5 GeV (may be lower) Linac (400 m) Electron Main Linac Chicane for positron production electron Low energy positron Transfer line Positron production (Undulator base) (same as USTOS) Electron beam energy =150 GeV 2.5 m 900 m

Schematic Layout of Positron Transfer in IP region (For Undulator based positron source) Detector Halls Main Bema lines Low energy e+ line (Horizontal detour) e- e+

Or, may be Detector Halls Main Bema lines Low energy e+ line (Vertical detour) e- e+

Alternative plan -1 (No Undulator e+ source, with Oide-scheme) Collimator and final focus IPs Positron main linac Positron main linac for energy upgrade Conventional positron source and injector Positron damping ring Low emittance positron transfer line Electron damping ring Collimator and final focus IPs Electron main linac for energy upgrade Electron main linac Electron injector Low emittance electron transfer line

Alternative plan -2 (No Undulator e+ source, without Oide-scheme) (Only electron line is shown. Positron line is similar.) Electron damping ring Collimator and final focus IPs Empty tunnel (free from operation) Electron main linac Electron injector Low emittance electron transfer line Electron damping ring Collimator and final focus IPs Electron main linac Electron injector Low emittance electron transfer line Ecm=500 GeV Ecm=1000 GeV