Andrew Burwood, Sean Cullen, Gillian Davidson, Pierre Pelletier Rescan Environmental Services IAIA Conference, Seoul, 6 June 2007 IFC Performance Standards.

Slides:



Advertisements
Similar presentations
Financing a Sustainable Low Carbon Indian Economy
Advertisements

Environmental Impact Assessment for Waste Treatment Options
March 2012 Ports and Cities Conference Newcastle Dorte Ekelund, Executive Director Major Cities Unit Department of Infrastructure and Transport
WORKSHOP OVERVIEW 1. MAJOR TROPICAL LAND MANAGEMENT PROBLEMS RELATED TO HYDROLOGICAL PROCESSES 2 (i). BEST METHODS (POLICY, TOOLS AND TECHNIQUES) TO ENHANCE.
ENVIRONMENTAL MONITORING AT SOLID WASTE (SW) LANDFILLS QUIZ Ruxandra Floroiu, Environmental Engineer, ECSSD WB Safeguards Workshop Chisinau, Moldova October.
PP4SD & Science Council Workshop 27th November 2006 Skills for Sustainability. Skills Needs: An Employers perspective Richard Howell Sustainable Development.
Energy National Policy Statements Anne Stuart DECC Energy Development Unit 22 October 2009.
Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Strategic Environmental Assessment of Scotland’s Climate Change Adaptation Framework Strategic Environmental Assessment of Scotland’s.
IFC PERFORMANCE STANDARD 2 LABOR & WORKING CONDITONS PRESENTION TO UNIONS, ISTANBUL APRIL 5, 2013.
Part III Solid Waste Engineering
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
LVBC 3 RD LAKE VICTORIA BASIN DONORS’ CONFERENCE Round Table Three Economic and Infrastructure Development Lily Kisaka.
Integrated Risk Management and Risk Communications David DeGagne, Executive Director Centre for Risk Management Tel: Fax: Web:
IPM in NRCS Programs Joe Bagdon USDA - NRCS National Water & Climate Center Amherst, Massachusetts.
Project Financing & Meeting International Social & Environmental Standards in Africa John Miragliotta, Sustainability Pty Ltd
SOCIAL POLICY GUIDELINES FOR MINING SECTOR IN AFGHANISTAN Harjot Kaur Senior Social Development Advisor, Ministry of Mines.
Energy National Policy Statements Nick Cooper DECC.
ENVIRONMENTAL MANAGEMENT SYSTEMS. ENVIRONMENTAL ISSUES Global Warming Climate Change Ozone Layer Resource Depletion Population Growth Waste Disposal Effects.
A stocks and flows approach An Integrated Assessment Framework for Considering Climate Change: 1. the principal domains Society and Economy Greenhouse.
Social Sustainability in the Hydropower Sector Richard English, PhD Principal Environment and Social Development Specialist South and East Asia Regions,
Environmental and Social Issues - what investors should know about the risks by Fergus Anckorn.
ENVIRONMENTAL MANAGEMENT PLAN
FINEX 2008 Environment & Exploration: New Codes and New Attitudes by Fergus Anckorn.
What SMS means for an Operator’s relationship with the CAA
Bureau of Workers’ Comp PA Training for Health & Safety (PATHS)
Ghana’s Initial National Communication William K. Agyemang-Bonsu EPA.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
First Nations-Focused Scientific Reviews of Environmental Assessments MSESMSES Prepared by Sarah Hechtenthal, M.Sc., P. Biol.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Zagreb, May 6-8, 2009 Presenter: Natasa.
1. 2  Strategic – BC Hydro Long Term Planning  Project level  Environmental Assessment ▪ Federal - Canadian  Integration 3.
Workshop on Infrastructures Sustainable Infrastructure for Efficient Mobility: the Key Challenges Luc Bourdeau ECTP Secretary General Industrial Technologies.
Demystifying the Process: Influencing Social and Economic Decision Making In Oil and Gas Development Pandora Snethkamp, Ph.D Houston, TX 77006
KENYA PORTS AUTHORITY HEALTH, SAFETY AND ENVIRONMENT
Environmental Impact Assessment (EIA): Overview
Harnessing the Power of Environmental Data for Decision-Making IABIN Phase II.
Review and Update of IFC Policy and Performance Standards on Social and Environmental Sustainability and Disclosure Policy Background and Overview October.
Arab african international bank ARAB AFRICAN INTERNATIONAL BANK SHARING EXPERIENCE Dr. Dalia Abdel Kader Head of Marketing and Communications Arab African.
People & Mining Continuously Balancing & Increasingly Challenging.
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
Watershed Assessment and Planning. Review Watershed Hydrology Watershed Hydrology Watershed Characteristics and Processes Watershed Characteristics and.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
1 Inter-American Development Bank Environment and Safeguards Policy - A Strategic Overview.
Investment in Sustainable Natural Resource Management (focus: Agriculture) increases in agricultural productivity have come in part at the expense of deterioration.
Assessing Effects on Human Health Meadowbank Gold Project Margaux Brisco Nunavut Impact Review Board Final Hearings, Baker Lake, Nunavut March 27 to 31,
Design an Integrative Sustainability Assignment Modified from Curriculum for the Bioregion Initiative and Jean MacGregor Washington Center for Improving.
I-90 Snoqualmie Pass East Project Tanya Lamb Urban Geography, GEOG 481 Description 15-mile stretch Hyak (MP 55.1) to Easton (MP 70.3) 2010 scheduled to.
Case Study – Preparation of an EMP Integrated Ecosystem Management of Sunshine-Moon River Basin (SMRB) Project.
EIA for the proposed Desalination Plant North of Swakopmund: Social Impact Assessment.
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
1 Water Use in Oil and Natural Gas Production ConocoPhillips Canada Water in a World of Seven Billion Conference May 10,
2006 Cumulative Effects Assessment CEA Definition  Potential for residual project-specific effects associated with Meadowbank project in combination.
1 Chapter 1: Introduction to the Environmental Science Introduction to the Environment Mr. Yim Mongtoeun Department of Environmental Science Royal University.
Introducing the Rural Economy and Land Use Programme Professor Philip Lowe and Jeremy Phillipson.
1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012.
Risk Management for Small & Medium Sized Enterprises
TECHNOLOGY TRANSFER AND NATIONAL COMMUNICATIONS UNFCCC /UNDP EXPERT MEETING ON METHODOLOGIES FOR TECHONOLGY NEEDS ASSESSMENTS SEOUL, KOREA April.
Linking SEA and City Development Strategy (CDS) in Vietnam Maria Rosário Partidário, Michael Paddon, Markus Eggenberger, Minh Chau, and Nguyen Van Duyen.
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
©Michel A. Bouchard SOME IRREVERSIBLE DAMAGES 1) Loss of biological diversity and ecosystem services 2) Loss of soil ( fertile soil)
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
ISO Session 3 Environmental Management and Ethics in Management.
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
TOOLS FOR MINING DEVELOPMENT POLICY AND IMPLEMENTATION
GCF’s Environmental and Social Safeguards
How the environment supports the aims of the LEP
World Bank project example
Presentation transcript:

Andrew Burwood, Sean Cullen, Gillian Davidson, Pierre Pelletier Rescan Environmental Services IAIA Conference, Seoul, 6 June 2007 IFC Performance Standards in Practice: A methodology for integrating social and environmental effects for the assessment of a mining project in Argentina

IFC Standards There are 8 IFC Performance Standards: 1.Social and Environmental Assessment and Management Systems (focus today) 2. Labour and Working Conditions 3. Pollution Prevention and Abatement 4. Community Health, Safety and Security 5. Land Acquisition and Involuntary Resettlement 6. Biodiversity and Sustainable Natural Resource Management 7. Indigenous Peoples 8. Cultural Heritage

IFC Standards Some key differences between the old and new standards include: New and expanded standards for: –Integrated assessment and management systems –Labour rights and standards –Community (not just workers) health and safety –Prevention and abatement of pollution New outcomes-based approach –Business centered and management systems driven –Actions tailored to specific risks –Adaptable means to strong outcomes

IFC Applied What do the changes mean in practice?: Demand for methodological advancement Increased focus on accountability and transparency Internal audit and development of management systems Secure social license to operate Focus on specific consequences

Project Overview Base Metal Mine in Argentina (3 provinces) Initial Capital Investment over $2 billion 24 year life of operations Mine Site in mountainous terrain Tunnel and Conveyor to Process Plant and Waste Facility 200 Km concentrate slurry pipeline Port Facility

Our approach to meet IFC and Argentine requirements I.Social and Environmental Issues Scoping: identify the “Principal Issues” II.Quantify or describe the predicted changes to the environment as a result of project development III.Identify the social and environmental consequences of these changes: the “So What?” IV.Design mitigation measures and associated management systems with monitoring

Issues Scoping Identify potential (and pertinent) social and environmental effects of the project Organize the potential effects into manageable topics: “Principal Issues” (in contrast to Discipline focused topics) Objectives: Method: Project Description / Baseline Data Public consultation Risk Assessment Potential Effects Principal Issues

Principle Issues 1.Air Emissions 2.Alteration of Surface Water Quality 3.Alteration of Surface Water Quantity 4.Alteration of Groundwater Quality 5.Alteration Groundwater Quantity 6.Alteration of Land Cover 7.Sensory Distribution 8.Environmental Effects on the Project 9.Accidents and Malfunctions 10.Employment and Business Opportunities

Process Analysis I

Process Analysis II

Principal Issues (1) Alteration of Surface Water Quality e.g., ML/ARD loading; sediment loading Alteration of Surface Water Quantity e.g., Changes in water levels at community source Alteration of Groundwater Quality e.g., Infiltration of ML/ARD or nitrogen compounds Alteration of Groundwater Quantity e.g., Extraction reducing aquifer volume Air Emissions e.g., Dust from blasting; vehicle emissions

Principal Issues (2) Environmental Effects on the Project e.g., Storms and floods; geo hazards Sensory Disturbance e.g., Noise from truck traffic; facility lighting Accidents and Malfunctions e.g., Accidents and spills; pipeline failure Employment and Business Opportunities e.g., Direct employment; induced business development; related social, economic, health and cultural consequences Alteration of Land Cover e.g., Loss of soils and vegetation; loss of wildlife habitat

Effects assessment Each Principal Issue forms a chapter in document and is assessed by an interdisciplinary team 1. Description and models of change to environment (physical scientists) 2. Identified Effects are assessed by discipline specialists Pre-Mitigation (“genes rule” 3. Describe explicit mitigation, management enhancements and monitoring 4. Effect is re-assessed Post mitigation

Example: Principal Issue to Significance overview Sensory DisturbancePrincipal Issue Change to the Environment Noise generated by trucks traveling to the mine site: potential noise levels modeled Decrease in quality of life for residents near development Potential Consequences Disturbance of wildlife along access route - vacation of habitats Not significant Alternate by-pass Slurry pipeline Noise monitoring Speed limits Sound barriers/berms Noise monitoring Management System SignificanceNot significant

Effects Flow Diagram No assessment ranking Pre and Post Mitigation Ranking

Focus on Mitigation and Enhancement Mitigation and EnhancementPre mitigation Post mitigation

Components of Management Plans

Benefits of the Approach Transparent assessment driven by an issues scoping exercise and public consultation Local concerns are embedded in the overall document Focuses on the “So What?” Facilitates the development of focused and effective management systems linked explicitly to effects assessment (Focused, appropriate, realistic, useful and monitored) Meets new IFC guidelines for an integrated SEA Holistic approach was stronger, more persuasive planning tool

Challenges Finding a common language within multi- disciplinary teams (techno to utility) Management plans require more communication between client and assessment team Greater effort and time for management planning Capacity of audience (Table of Concordance) New way of business in developing market (commitments to public disclosure and early consultation with evolving project description)

Thank you! Questions? Comments?

Effects Flow Diagram for Air Emissions in document

Effect Flow Diagram for Alteration of Land Cover