International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.

Slides:



Advertisements
Similar presentations
Global ATM Operational Concept
Advertisements

International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-85/PIA-3 Air Traffic Situational Awareness (ATSA) Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Continuous Climb Operations (CCO) Saulo Da Silva
International Civil Aviation Organization Hands-on Exercises Performance Based Planning and use of IFSET SIP/ASBU/Bangkok/2012-WP/32B Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Continuous Descent Operations (CDO) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization ASBU Methodology Summary of Block 0 Modules H. Sudarshan SIP/2012/ASBU/Nairobi -WP/8 Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
SIP/2012/ASBU/Nairobi-WP/6
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-102 Increased Effectiveness of Ground-Based Safety Nets SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Measurement of environmental benefits Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Descent Operations (CDO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Trajectory-Based Operations(TBO) Saulo Da Silva
Measurement of environmental benefits Saulo Da Silva
ASEAN PBN Routes Objectives:
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Hands-on Exercises Performance Based Planning and use of IFSET
Workshop on preparations for ANConf/12 − ASBU methodology
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles SIP/2012/ASBU/Nairobi- WP/28C Workshop on preparations for ANConf/12 − ASBU methodology (Nairobi, August 2012)

2 Module N° B0-20 Improved Flexibility and Efficiency in Departure Profiles ICAO SIP 2012-ASBU WORKSHOP Summary To implement Continuous Climb Operations in conjunction with PBN Main Performance ImpactKPA-04 – Efficiency; KPA-05 – Environment; KPA-10 - Safety Operating Environment/Phases of FlightDeparture and En-Route Global Concept Component(s) AUO – Airspace user operations TS – Traffic synchronization AOM – Airspace organization and management Global Plan Initiatives (GPI) GPI 5- RNAV/RNP (Performance. Based Navigation) GPI-10- Terminal Area Design and Management GPI-11- RNP and RNAV SIDs and STARs Pre-RequisitesNIL Status Global Readiness ChecklistStandards ReadinessReady Avionics AvailabilityReady Infrastructure AvailabilityReady Ground Automation AvailabilityReady Procedures AvailableReady Operations ApprovalsReady

3 Varies from one State/region to the next. Some aspects of the movement to PBN have already been subject of local improvements in areas ICAO SIP 2012-ASBU WORKSHOP Module N° B Baseline

4 Continuous Climb Operations – CCO is an aircraft operating technique aided by appropriate airspace and procedure design and appropriate ATC clearances – A CCO can be flown with or without the support of function of the FMS Performance -based Navigation (PBN) – The PBN concept encompasses two types of navigation specifications RNAV/RNP: – PBN SIDs ICAO SIP 2012-ASBU WORKSHOP Module N° B0-20 – Change Brought by the Module

5ICAO SIP 2012-ASBU WORKSHOP Module N° B0-20 – – Intended Performance Operational Improvement EfficiencyReduced fuel burn and efficient aircraft operating profiles.; Reduction in the number of required radio transmissions. EnvironmentAuthorization of operations where noise limitations would otherwise result in operations being curtailed or restricted. Environmental benefits through reduced emissions. SafetyMore consistent flight paths. Lower pilot and Air Traffic Control workload. CBACCO benefits are heavily dependent on each specific ATM environment. If implemented within the ICAO CCO manual framework, the benefit/cost ratio (BCR) will be positive.

6 The ICAO Performance-based Navigation Manual (Doc 9613)- Provides general guidance on PBN implementation The Continuous Climb Operations (CCO) Manual (Doc xxxx); Provides guidance on Airspace design Instrument flight procedures ATC facilitation Flight techniques necessary to enable CC0s ICAO SIP 2012-ASBU WORKSHOP Module N° B0-20 – Necessary Procedures (Air & Ground)

7 Avionics – CCO does not require specific air/ground technology. – CCO is an aircraft operating technique aided by appropriate airspace and procedure design, and appropriate ATC clearances Ground systems – Controllers would benefit from some automation support to display aircraft capabilities in order to know which aircraft can do what ICAO SIP 2012-ASBU WORKSHOP Module N° B0-20 – Necessary System Capabilities

8 Training in the operational standards and procedures are required for this module Likewise, the qualifications requirements are identified in the regulatory requirements ICAO SIP 2012-ASBU WORKSHOP Module N° B0-20 – Training and Qualification Requirements

9 Regulatory/Standardization – Use current published requirements Approval Plans – Must be in accordance with application requirements ICAO SIP 2012-ASBU WORKSHOP Module N° B0-20 – Regulatory/standardization needs and Approval Plan (Air and Ground)

10 Procedures – ICAO Doc 8168, Procedures for Air Navigation Services- Aircraft Operations – ICAO Doc 4444, Procedures for Air Navigation Services — Air Traffic Management. – ICAO Doc 9613, Performance-based Navigation (PBN) Manual; – ICAO Doc xxxx, Continuous Climb Operations (CCO) Manual Approval Documents – ICAO Doc XXXX, Continuous Climb Operations Manual; – ICAO Doc 9613, Performance Based Navigation Manual; – ICAO Doc 4444, Procedures for Air Navigation Services — Air Traffic Management. ICAO SIP 2012-ASBU WORKSHOP Module N° B0-20 – Reference Documents

11 Improved Flexibility and Efficiency in Departure Profiles ICAO SIP 2012-ASBU WORKSHOP Module N° B0-20 Implementation - Benefits and Elements Benefits - Main Key Performance Areas (KPA) KPAs AccessCapacityEfficiencyEnvironmentSafety ApplicableNNYYY Elements: CCO and PBN SIDs No avionics or Ground systems required To be reflected in ANRF

12ICAO SIP 2012-ASBU WORKSHOP