SUCCESSFUL APPLICATION FOR HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) GRANTS Presented By: Patrick V. DeChellis Deputy Director Los Angeles County Department.

Slides:



Advertisements
Similar presentations
Federal Safety Funding for Local Governments Martin Andersen Local Government Section Manager February 19, 2010.
Advertisements

Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
Safety Conversation: NLTAPA Conference Michael S. Griffith Director Office of Safety Technologies Federal Highway Administration.
HSM: Celebrating 5 Years Together Brian Ray, PE Casey Bergh, PE.
A Comprehensive Study on Pavement Edge Line Implementation Presented by: Mark J. Morvant, P.E. Associate Director, Research Louisiana Transportation Research.
Workshop Presentation for Homedale, Owyhee County & Homedale Highway District for Homedale, Owyhee County & Homedale Highway District Corridor Management.
Incorporating Safety into the Transportation Planning Process 62 nd Illinois Traffic Engineering and Safety Conference October 23, 2013.
NH Route 28 Corridor Safety Audit Preliminary Analysis of Historic and Existing Conditions.
Investigation of the Safety Effects of Edge and Centerline Markings on Narrow, Low-Volume Roads Lance Dougald Ben Cottrell Young-Jun Kweon In-Kyu Lim.
Ohio Department of Transportation Leadership Meeting#1 Jun 12, 2012 Steering Committee Meeting #1 WELCOME Bicycle and Pedestrian Travel Pike and Wok Travel.
Type Name Here Technical Program Services Eduardo C. Serafin, PE, AICP.
Hardin County Engineering Department September 12, 2006.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Narcoossee Roadway Corridor Analysis Osceola County Board of County Commissioners Meeting December 4, 2006
Highway Safety How do we get there? 43, Projected U.S. Highway Fatalities.
1 SDDOT SAFETY PROGRAM. 2 Who Am I ??? CLIFF REUER TRAFFIC & SAFETY ENIGNEER SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION OFFICE OF PROJECT DEVELOPMENT
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Publication No. FHWA-HRT Pedestrian and Bicyclist Safety.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
Performance measurement. Motivation Federal regulation – Intermodal surface transportation efficiency act of 1999 (ISTEA) – Transportation equity act.
ALDOT HSIP FUNDING OPPORTUNTIES ALABAMA DEPARTMENT OF TRANSPORTATION OFFICE OF SAFETY OPERATIONS SONYA BAKER TIMOTHY BARNETT MAY 13, 2015.
INDOT Rumble Striping: A Systemic Safety Measure June 4 th, 2015.
Workshop Presentation for Canyon County Jurisdictions for Canyon County Jurisdictions Corridor Management Plan.
Data Analysis and Use 3-1 NLTAPA Joint Safety Work Group Webinar November 18, 2013.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
Hypothesis 1: Narrow roadways and roadways with higher speed limits will increase risk of vehicle/bicycle crash Hypothesis 2: Bicycle lanes and signage.
All Roads Transportation Safety (ARTS) Program Kevin J. Haas, P.E. Traffic Investigations Engineer, ODOT February 26, 2015.
. Efforts to Reduce Crashes on County Roads in Iowa.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Incident Management in Central Arkansas: Current Settings and Proposed Extensions Weihua Xiao Yupo Chan University of Arkansas at Little Rock.
All Roads Transportation Safety (ARTS) Program Hot Spot ODOT Region 1 Kick-Off Meeting March 18, 2015.
2-1 LOW COST SAFETY IMPROVEMENTS The Tools – Identification of High Crash Locations – Session #2.
Rural Intersection Collision Avoidance System (RICAS) US Highway 53 and State Highway 73 Minong, Wisconsin Additional information Project Website:
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Local Rural Highway Investment Program (LRHIP)
Timothy E. Barnett, P.E., PTOE State Safety Operations Engineer Alabama Department of Transportation.
Working Together to Save Lives An Introduction to the FHWA Safety Program for FHWA’s Safety Partners.
The 2010 Evaluation of Low Cost Safety Improvements Pooled Fund Study Technical Advisory Committee Meeting March 2010 Thomas M. Welch, P.E. State Transportation.
Statewide Analysis Strategies Missouri’s Blueprint for Safer Roadways.
Rural Transportation Planning Eunice Fitzpatrick Transportation Planner Kentucky River ADD Hazard, KY.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
All Roads Transportation Safety (ARTS) Program Angela Kargel Region 2 Traffic Manager Oregon Department of Transportation January 2015.
Louisiana Local Road Safety Program
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
Caltrans External Advisory Liaison Committee October 2015.
Tracy Lovell, PE HSIP PROJECT PROCESS. HSIP Process  Identify the location – RD Corridor, Emphasis Area, etc.  Conduct Road Safety Audit with multi-disciplinary.
5/8/02FHWA Office of Safety1 FHWA Safety Core Business Unit Office-Level Structure Develops and manages programs for the safe operation of roadways, bicycle.
Highway Fatalities A National Health Crisis Highway Designers Can Help Turn Around By Anthony Kane Director, Engineering and Technical Services American.
September 14, 2015 Transportation Board of Directors John M. Terry Assistant Director- Engineering SR-160 from SR-159 to Mountain Springs Phase 2 Final.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
South Dakota Transportation Safety Conference February 21-22, 2007 John G. Rohlf, P.E. Federal Highway Administration Pierre, South Dakota.
US 421 Centerline Rumble Strips in Chatham Co. Renee B. Roach, P.E. and Al Grandy May 2, 2007.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Advancing Safety through SAFETEA-LU Michael Halladay FHWA Office of.
1 Ian Skinner Crash information Systems Integrating geographical and statistical analysis for maximum benefit.
Geometric Design: General Concept CE331 Transportation Engineering.
1 National Governors Association Roundtable Presentation April 2, 2001 Dr. Christine Johnson Director, ITS Joint Program Office Program Manager, FHWA Operations.
Safety Data Initiatives in Reauthorization – What Can We Expect? Kathy Krause, FHWA Office of Safety 30 th Annual International Traffic Records Forum July.
Estimation of 2001 Crash Costs Using FARS and GES John McFadden, Len Meczkowski, FHWA-Office of Safety R&D; Carol Conly, Lendis Corporation; Promod Chandhok,
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
LOW COST SAFETY IMPROVEMENTS Practitioner Workshop The Tools – Identification of High Crash Locations – Session #2.
INDOT Office of Traffic Safety Manager, Mike Holowaty
Comparing Systemic Approaches: A Kentucky Example
Meeting of the Hillsborough MPO Board December 5, 2017
Moving Maryland Toward Zero Deaths
Geometric Design: General Concept CE331 Transportation Engineering.
Clark County, WA Safety Management Program
Project Location: 35th Ave HSIP8
Presentation transcript:

SUCCESSFUL APPLICATION FOR HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) GRANTS Presented By: Patrick V. DeChellis Deputy Director Los Angeles County Department of Public Works LA County HSIP Grants 1

Los Angeles County LA County HSIP Grants2 4,751 sq. miles (12,305 sq. km)

Los Angeles County Public Works Transportation Core Service Area Mission Statement: We provide safe, clean, efficient transportation choices and rights-of-way to enhance mobility and quality of life. 3LA County HSIP Grants

Los Angeles County Successes Over the last two HSIP cycles the County has applied for 21 projects and received 21 grants. Over the last two HSIP cycles the County has applied for 21 projects and received 21 grants. LA County HSIP Grants4

Examples of Successful Projects HSIP Cycle 5 Projects LA County HSIP Grants5

HSIP Cycle 6 Projects LA County HSIP Grants6

HSIP Cycle 6 Projects (cont’d) LA County HSIP Grants7

Project Case Study Locations 8LA County HSIP Grants Project Case Study #2 Project Case Study #1

East Avenue O Bike Lane Project East Avenue O Bike Lane Project Scope: Widen roadway and install bike lanes Total Project Cost: $791,000 Benefit/Cost ratio of 7.36 LA County HSIP Grants9

Project Case Study #1 Project Inception Obtained pedestrian and bicycle related Statewide Integrated Traffic Records System (SWITRS) collisions for the last 10 years from tims.berkeley.edu Performed GIS analysis to identify proposed bike lanes in the 2012 Los Angeles County Bicycle Master Plan that had the highest rates of pedestrian and bicycle related collisions. 10LA County HSIP Grants

Project Case Study #1 Benefit/Cost Ratio Calculation Benefit/Cost Ratio Calculation Selection of project corridors: Select bike lanes proposed in the bike plan where safety improvements are required to reduce pedestrian and bicycle related collisions. Identification of countermeasure: Based on the collision data, bicycle lanes along widened shoulders was selected as the preferred countermeasure for reducing future collisions and fatalities 11LA County HSIP Grants

Project Case Study #1 Benefit Calculation: TIMS site tims.berkeley.edu 12LA County HSIP Grants

Project Case Study #1 B/C Ratio Calculation: TIMS site was used to calculate the benefit to cost ratio, where a higher B/C Ratio improved funding eligibility. 13LA County HSIP Grants

Project Case Study #1 LA County HSIP Grants14

Project Case Study #1 LA County HSIP Grants15 Key Factors Fatal Collisions and Severe Collisions

Project Case Study #1 Counter measures recommended: Counter measures recommended: Install Bike Lanes ($791,000) LA County HSIP Grants16

Project Case Study #2 Bouquet Canyon Road and San Francisquito Canyon Road Improvements Project Scope: Install guardrails, centerline rumble strips/stripes, and/or recessed pavement markers Total Project Cost: $1,132,000 Benefit/Cost ratio of LA County HSIP Grants

Project Case Study #2 Project Inception Project Inception Due to community concerns regarding high number of collisions and speeding along Bouquet Canyon and San Francisquito Canyon Roads, the County of Los Angeles conducted a Road Safety Audit (RSA) on these roadways. Recommendations from the RSA spearheaded the effort to apply for the Cycle 6 HSIP Grant. 18LA County HSIP Grants

Project Case Study #2 Bouquet Canyon Road Bouquet Canyon Road Segment Length - From Elizabeth Lake Road to Vasquez Canyon Road (approx. 18 miles) Roadway Classification – Limited Secondary Highway Average Daily Traffic – 2,200 vehicles Number of lanes in each direction – 1 Posted Speed Limit – 55 mph 19LA County HSIP Grants

Project Case Study #2 Bouquet Canyon Road - Traffic Collision Data Bouquet Canyon Road - Traffic Collision Data Collisions in relation to centerline rumble strips/stripes countermeasure Fatal Collisions: 5 Severe Injury: 32 Injury – Other Visible: 54 Injury – Complaint of Pain: 51 Total Collisions: 142 Total Collisions: LA County HSIP Grants

Project Case Study #2 San Francisquito Canyon Road San Francisquito Canyon Road Segment Length - From Elizabeth Lake Rd to Copper Hill Dr. (approx. 20 miles) Roadway Classification – Limited Secondary Highway Average Daily Traffic – 3,500 vehicles Number of lanes in each direction – 1 Posted Speed Limit – 55 mph 21LA County HSIP Grants

Project Case Study #2 San Francisquito Canyon Road - Traffic Collision Data San Francisquito Canyon Road - Traffic Collision Data Collisions in relation to centerline rumble strips/stripes countermeasure Fatal Collisions: 3 Severe Injury: 15 Injury – Other Visible: 45 Injury – Complaint of Pain: 45 Total Collisions: 108 Total Collisions: LA County HSIP Grants

Project Case Study #2 Systemic Approach for Guardrails 23LA County HSIP Grants

Project Case Study #2 Benefit/Cost Ratio Key Factors Fatal Collisions and a number of Severe collisions 24LA County HSIP Grants

Project Case Study #2 Recommended Counter Measures Recommended Counter Measures Install Centerline Rumble Strips/Recessed Pavement Markers ($501,682) Install Edge-lines and Centerlines ($257,273) Install Guardrail ($373,045) 25LA County HSIP Grants

Typical LA County Process The County obtains the CHP traffic collision reports for collisions within the unincorporated County areas and codes them in our in-house database. The information in these reports are utilized in various ways to assist us in identifying those areas that should be evaluated to determine if safety enhancements are recommended, including : LA County HSIP Grants26

Typical LA County Process Traffic studies that are conducted in response to requests for traffic control devices from the public. The County initiates traffic studies to determine if improvements are recommended following all collisions that resulted in fatal and/or severe injuries, as noted in the CHP reports. LA County HSIP Grants27

Typical LA County Process The County’s collision database generates reports annually to identify intersections with a recurrence of a specific collision pattern. The County will then evaluate the “top 5 percent” of patterns found to determine if improvements are recommended. In addition, the County will review patterns, regardless of ranking, when a location is included in an upcoming road construction project. 28LA County HSIP Grants

Typical LA County Process Each year the County calculates the collision rates for rural and mountain roadways that have an ADT of 2,000 vehicles or more and at least 2 miles in length. For roadways where the actual collision rates exceed the expected/average collision rates for similar roadways, Road Safety Audits may be performed. The County’s crash rate calculation for Year 2014 are listed on the ftp site located at: ftp://dpw.co.la.ca.us/pub/PDD/AACE LA County HSIP Grants29

Questions Related files can be found on the LA County FTP site at: ftp://dpwftp.co.la.ca.us/pub/PDD/AACE LA County HSIP Grants 30