Doc.: IEEE 802.11-08/1023r0 Submission September 2008 Bruce Kraemer, MarvellSlide 1 +1 (321) 427-4098 5488 Marvell Lane, Santa Clara, CA, 95054 Name Company.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0495r1 Submission May 2009 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Advertisements

Doc.: IEEE /0495r3 Submission May 2009 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /024 Submission January 2001 Jim Carlo, Texas InstrumentsSlide 1 Patents and IEEE 802 Stds IEEE 802 Chair’s Viewpoint Jim Carlo General.
1 Introduction to IEEE Standardization Hang Liu. 2 IEEE Standard Association [1] Standards Activities Board CSMA/CD Ethernet Token Passing.
1 May 2007 Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: l Show slides #1 through #5 of.
Doc.: IEEE / 0893r0 Submission July 2012 Fischer, Lee, ZhuSlide 1 TGac MAC ad hoc agenda and report Date: Authors:
Doc.: IEEE /0051r0 Submission January 2005 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /400 Submission November 2000 Matthew B. Shoemake, Texas InstrumentsSlide 1 Patent Policy Review Matthew B. Shoemake, Ph.D. IEEE g,
Doc.: IEEE /1224r1 Submission September 2008 Jesse Walker, Intel CorporationSlide 1 IEEE TGw October Agenda Date: Authors:
Doc.: IEEE /0213r0 Submission January 2008 Stephen McCann, Nokia Siemens NetworksSlide 1 TGu February 2008 Ad Hoc Agenda Date: Authors:
Doc.: IEEE /0954r0 SubmissionSameer Vermani, Qualcomm MU-MIMO Ad Hoc Report July 2012 Date: Authors: Slide 1 July 2012.
Doc.: IEEE /01024r0 SubmissionBrian Hart, Cisco Systems MU-MIMO AdHoc Report Jul 2011 Date: Authors: Slide 1 Jul 2011.
Doc.: IEEE /1084r00 Submission September 2015 Adrian Stephens, Intel CorporationSlide WG Chair comments to TGah Date: Authors:
Doc.: IEEE /1702r0 Meeting Report September 2006 Pat R. Calhoun, CiscoSlide 1 Report of TGv – November 2006 DATE: November 2006 Author(s) NameCompanyAddressPhone .
Doc.: IEEE /0698r0 Submission May 2015 Xiaoming Peng (I2R)Slide 1 Date: Authors: IEEE aj Task Group March 2015 Report.
IEEE DASC Report January, 2009 Yokohama Pacifico Victor Berman, IEEE DASC Chairman.
Doc.: IEEE /2090r0 Submission July 2007 Eldad Perahia (Intel)Slide 1 Coex Ad Hoc May Montreal Agenda and Report Notice: This document has been.
Doc.: IEEE /0507r0 Submission TGaj CC12 on 10 April 2014 Report Author: Date: NameCompanyAddressPhone Haiming WANGSEU/CWPAN 2.
Doc.: IEEE /1623r0 Submission November 2006 Jim Petranovich, Conexant Systems, Inc.Slide 1 PHY Ad Hoc Nov 1 Agenda and Minutes Notice: This document.
Doc.: IEEE /0642r0 SubmissionBrian Hart, Cisco Systems MU-MIMO Ad Hoc Report May 2012 Date: Authors: Slide 1 May 2012.
Doc.: IEEE /0828r0 Submission May 2007 Harry Worstell, AT&TSlide 1 Procedural Clarification Notice: This document has been prepared to assist.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: IEEE /0084r1 Submission January 2009 Matthew Fischer, BroadcomSlide 1 TGn-SB0-mac-adhoc-report Date: Authors:
Doc.: IEEE /0054r0 Submission January 2005 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc Agenda Notice: This document has been prepared to.
February 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0258r0 Submission 11k Brisbane 2 Agendas Notice: This document has been prepared to assist.
Doc.: IEEE /0646r0 Submission July 2005 Richard Paine, BoeingSlide 1 11k Cairns Agendas Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /1218r0 SubmissionBruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company Address Phone.
Doc.: IEEE tg9-Opening-Report- September-2015 Submission September 2015 Peter Yee, NSA/IAD Slide 1 Project: IEEE P Working Group.
Doc.: IEEE /2776r1 Submission November 2007 Eldad Perahia (Intel)Slide 1 Coex Ad Hoc November Atlanta Agenda and Report Date: Authors:
Doc.: IEEE /0051r1 Submission January 2005 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0392r0 Submission July 2005 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /2429r0 Submission Peter Loc, MarvellSlide 1 TGn LB97 Frame Format Ad Hoc Waikoloa, Sep 2007 Notice: This document has been.
March 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0261r0 Submission 11k Denver Ad Hoc Agenda Notice: This document has been prepared to assist.
Doc.: IEEE /0661r0 Submission November 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /2429r1 Submission Peter Loc, MarvellSlide 1 TGn LB97 Frame Format Ad Hoc Waikoloa, Sep 2007 Notice: This document has been.
Doc.: IEEE /0021r3 Submission January 2008 Bruce Kraemer, MarvellSlide 1 TGn ad hoc Opening Report - Jan ‘08 Date: 2008-Jan-09 Authors:
Submission Title: [WG-TG3b Meeting Report Sept04]
TGn-LB134-mac-adhoc-report
<month year> <September 2018>
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
<month year> <May 2018>
July 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Report for TG4q (ULP) Task Group, July 2015.
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
IEEE Contribution Author’s Name Affiliation Address Phone
May 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: KMP TG9 Opening Report Vancouver 2015 Date Submitted:
TGn ad hoc Opening Report - Jul ‘08
<month year> <November 2018>
<month year> <July 2018>
September, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for September.
Submission Title: [WG-TG3b Meeting Report Sept04]
Instructions for the WG Chair
What is a CA document? Date: Authors: March 2005 March 2005
Submission Title: [WG-TG3b Meeting Report September05]
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
<month year> <January 2019>
Report of TGv – September 2006
TGn-LB129-mac-adhoc-report
BEAM Ad Hoc September Agenda and Report for LB97
TGn-SB0-mac-adhoc-report
TGn-LB134-mac-adhoc-report
TGn-LB124-mac-adhoc-report
Instructions for the WG Chair
IEEE IPR Policy Date: Authors: March 2006 March 2006
TGu Draft Revision Procedure
BEAM Ad Hoc September Agenda and Report for LB97
Coex Ad Hoc March Orlando Agenda and Report
January 2012 doc.: IEEE /0179r1 Jan 2012
<month year> doc.: IEEE < e> <Mar 2018>
Instructions for the WG Chair
Presentation transcript:

doc.: IEEE /1023r0 Submission September 2008 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company Address Phone Bruce Kraemer Marvell LB134 IP Comment Date: Authors: Abstract: Summary opinion of how to progress while awaiting LOAs

doc.: IEEE /1023r0 Submission September 2008 Bruce Kraemer, MarvellSlide 2 CID 9302 Comment The resolution of LB129 comment is unacceptable, as the slide deck cited refers to another relevant reference--- The Submitter of the Letter of Assurance may, after Reasonable and Good Faith Inquiry, indicate it is not aware of any Patent Claims that the Submitter may own, control, or have the ability to license that might be or become Essential Patent Claims. If the patent holder or patent applicant provides an assurance, it should do so as soon as reasonably feasible in the standards development process once the PAR is approved by the IEEE-SA Standards Board. This assurance shall be provided prior to the Standards Board's approval of the standard. This assurance shall be provided prior to a reaffirmation / stabilization if the IEEE receives notice of a potential Essential Patent Claim after the standard's approval or a prior reaffirmation / stabilization. An asserted potential Essential Patent Claim for which an assurance cannot be obtained (e.g., a Letter of Assurance is not provided or the Letter of Assurance indicates that assurance is not being provided) shall be referred to the Patent Committee. I believe this implies that the process stops until the Patent Committee can assure "clear right-to-use" under the terms of the required LOA Proposed Change Obtain documentation of patent committee written assurance to proceed. Absent this, implementers of the standard may face problems with release of devices and network operators with economic life of new installs.

doc.: IEEE /1023r0 Submission September 2008 Bruce Kraemer, MarvellSlide 3 Resolution Comment #1 The following is the personal opinion of the PatCom chair, Don Wright, and not necessarily that of the full Patent Committee, the Standards Board or the Standards Association. Don offered it as a path forward until an official PatCom position can be developed. “The proposed change identified below is not a technical solution, is not a technical change to the draft which will cause the commenter to change his/her vote to "YES" and is not in the purview of the working group or even the sponsor. The only "road block" to the progression of the draft to approval for lack of an LOA is at the Standards Board and not before. An appropriate technical solution which should have been proposed with the comment would be to have proposed removal of the technology that is potentially infringing on a patent claim and offer an alternative solution for which an LOA is not needed or for which an LOA can be obtained. If the working group does not believe it can develop and use an alternative technology it can: 1) Continue working delivering the best solution it can through sponsor ballot. It then becomes the responsibility of the Standards Board to decide what to do about the situation. Of course, there is risk with this path that once the draft reaches the Standards Board, it may decide to not approve it as a standard and any work done is basically lost. 2) Ask for the PAR to be withdrawn and abandon the work on the project. 3) Sit on its hands and do nothing until the PAR expires. Of course, if path 1 is followed, the chair should continue to attempt to get the holder of the potentially essential patent claim to complete and submit the LOA form. I would recommend the sponsor actively participate in making a determination of the desired path forward.”

doc.: IEEE /1023r0 Submission September 2008 Bruce Kraemer, MarvellSlide 4 Proposed Comment Resolution Text Counter: WG11 has requested a formal response from PatCom but it has not yet been received. TGn believes it and the WG have faithfully followed the procedures provided by PatCom concerning the soliciting of the existence of potentially essential patents and associated LOAs as specified in: TGn is restricted from any additional action beyond these procedures. TGn has passed this comment on to PatCom for review. TGn and WG11 will continue to follow the IEEE IP procedures. Further discussion on this topic can be found in document r0.