Hartmut Buettig | Institut FWKE(ELBE) | www.hzdr.de First Experience at ELBE with the new 1.3 GHz CW RF-System based on 10 kW Solid State Amplifiers Hartmut.

Slides:



Advertisements
Similar presentations
FWKE Dr.-Ing. H.Büttig Mitglied der Leibniz-Gemeinschaft OPERATION OF A SOLID STATE AMPLIFIER AT THE S.C. LINAC ELBE HARTMUT BÜTTIG.
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
Prof. Dr. Dr. h. c. R. Sauerbrey | Scientific Director | The HZDR Program towards a Helmholtz beamline at XFEL Roland Sauerbrey Helmholtz-Zentrum.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
Low Emittance RF Gun Developments for PAL-XFEL
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Anders Sunesson RF Group ESS Accelerator Division
WORKSHOP SUMMARY. 2 Workshop summary CWRF08: finally we have: 54 ~10 33 talks Number of participants rose by almost 6dB.
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
Turkish Accelerator and Radiation Laboratory at Ankara Suat ÖZKORUCUKLU İstanbul University.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Solid State RF High Power Amplifier Developments at SOLEIL Ti RUAN, on behalf of SOLEIL RF Group CWRF10 CELLS-ALBA Barcelona Spain May
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
CWRF 2008, Geneva, March Alessandro Fabris on behalf of the Elettra RF Group Sincrotrone Trieste, Trieste, Italy. Elettra RF System Upgrade:
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Page 1 Polarized Electron Sources for Linear Colliders October, 2010 A. Brachmann, J. C. Sheppard, F. Zhou SLAC SLAC October 18-22, 2010.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
650 MHz Solid State RF Power development at RRCAT
Rong Xiang I I Dark current measurements at the ELBE SRF gun Rong Xiang, Jochen Teichert, Pengnan Lu, Andre Arnold, Petr Murcek,
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
ALBA RF Systems Francis Perez.
MAX IV linac overview and scope of automation Sara Thorin.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
Member of the Helmholtz Association Page 1 Gerald Staats | ELBE| SRF-Gun Dark Current Chopper or taking the remains from other projects Gerald.
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
RF Power Klystrons & 20 Year Look R. Nelson 7/15/15.
Areal RF Station A. Vardanyan
Status of BESSY II and bERLinPro
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Brief Introduction to ELBE
An X-band system for phase space linearisation on CLARA
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
DC Injector and Space Charge Simulation Status
Notkestrasse 85, Hamburg, Germany
Injection facility for Novosibirsk Super Charm Tau Factory
MIT Compact X-ray Source
Operational Experience with the Cornell ERL Injector SRF Cavities
CEPC RF Power Sources System
ERL Main-Linac Cryomodule
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
RF Pulse Shaping.
Physics Design on Injector I
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status and New Developments of ALBA RF Systems
CLIC Feasibility Demonstration at CTF3
RF introduction Anders Sunesson RF group leader
Status and New Developments of ALBA RF Systems
CEPC SRF Parameters (100 km Main Ring)
Presentation transcript:

Hartmut Buettig | Institut FWKE(ELBE) | First Experience at ELBE with the new 1.3 GHz CW RF-System based on 10 kW Solid State Amplifiers Hartmut Büttig for A.Arnold, A.Büchner, M.Justus, M.Kuntzsch, U.Lehnert, P.Michel, R.Schurig, G.Staats, J.Teichert, Radiation Source ELBE, Helmholtz Zentrum Dresden- Rossendorf, Germany

Member of the Helmholtz Association Page 2 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | TOPICS 1: Short Remarks on ELBE upgrade 4: SOLID STATE PA 5: 20 kW (Combination of two SSPA) 6: Operation of the new ELBE RF-System

Member of the Helmholtz Association Page 3 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | To remember where ELBE is 1

Member of the Helmholtz Association Page 4 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | HELMHOLTZ ZENTRUM DRESDEN ROSSENDORF 800m 600m From Matter to Materials How does matter behave in strong fields and at small-scale dimensions? Energy Research How can resources and energy be utilized in an efficient and safe manner? Ion Beam Center Radiation Source ELBE with Positrons, Neutrons, X- and Gamma Rays, Free-Electron Lasers & High-Intensity Laser TOPFLOW Facility High Magnetic Field Laboratory Dresden PET Center Cancer Research How can malignant tumors be identified at an early stage and treated effectively? 1

Member of the Helmholtz Association Page 5 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | DRACO laser 150 -> 500 TW Penelope 1.5 PW laser E-wake field acc. CBS x-rays Ion wake field acc ELBE –UPGRADE Status 3/ INFRARED 3 – 230 µm NEUTRONS 0 – 30 MeV NEUTRONS BREMSSTRAHLUNG 0 – 17 MeV XRAYS 10 – 100 keV POSITRONS 0.2 – 30 keV APRIL 2012

Member of the Helmholtz Association Page 6 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | UPGRADE to HSQ ELBE: FUTURE CENTER OF HIGH POWER RADIATION SOURCES (HSQ) ELBE UPGRADE AFTER 10 YEARS OF OPERATION (MANY ACTIVITIES) ONE TOPIC IS: DOUBLING THE RF POWER -Has an impact on: -RF power amplifiers, RF - couplers, WG- windows; diagnostics, beam dumps, water cooling, mains power… 3

Member of the Helmholtz Association Page 7 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | ELBE SC-LINAC Beam Parameters Thermionic GunSRF Photo Gun Maximum permitted Energy 40 MeV (CW) Bunch Charge77 pC > 150 pC77pc / 2.5 nC Beam Current CW0.85 mA >1.6 mA1 mA Bunch Length (rms) 1 – 10 ps4 / 20 ps Transv. Emittance2/10 mm mrad (rms) 0.5 / 2.5 mm mrad Max pC 13 MHz Energy Spread35 keV /55 keV40 keV 2

Member of the Helmholtz Association Page 8 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | Thermionic DC Gun 250 kV <= 260 MHz 77 pC(1mA*13MHz) ~ 500ps ~10 mm mrad RF Bunchers 260 MHz +1,3GHz compr. ~ 100:1 Linac 1,3 GHz MeV/m <1mA CW SRF photo gun 9.5 MeV <= 13 MHz 80pC / 1nC / 2.5 nC ~ 5-20 ps ~ mm mrad Linac 1,3 GHz ~20 <1mA CW 4 x 10kW CW - VKL7811St x 10kW CW-SSPA Since Feb.2012

Member of the Helmholtz Association Page 9 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | ELBE-UPGRADE: RF RELATED ACTIVITIES RESONANT RING (CWRF-2008): -Conditioning of RF couplers, WG-windows, -(NIM A 612 (2010) 427 – 437) DOUBLING THE RF – POWER: -Test of a 16 kW IOT at a SC-Cavity (2008), (Good cooperation with Bruker BioSpin+CPI) -(SRF 2009, TUPP026) -Test of a 10 kW BRUKER SSPA (CWRF-2010)

Member of the Helmholtz Association Page 10 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) |

Member of the Helmholtz Association Page 11 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | 3 What kind of RF-Power Amplifier for 20 kW Year 2008: Start of cooperation with BRUKER BioSpin ! 2 Klystrons ? (1998: VKL7811St (CPI) USD/piece) (2008: USD/piece) Answer: NO IOT ?eventually

Member of the Helmholtz Association Page 12 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | Remarks on 16kW - IOT Test in 2008 with beam in principle ok Compared with a 10kW VKL7811St Klystron (permanent magnet system) IOT is more exp. Solid state technology becomes more and more competitive. (costs: 10…12 The „border line between tube- and SSA- technology“ may be in the range of 30 kW at present, but moving up quickly 3

Member of the Helmholtz Association Page 13 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | SOLID STATE AMPLIFIER (SSA) ELBE was focused on IOT but not happy. INSPIRATION TO SSA-Technology by: - BRUKER EXP. ( Big SSA for Orsay) - BRUKER CW IOT-drivers -CWRF 2008 GENEVA -The trend to solid state technology was clear !

Member of the Helmholtz Association Page 14 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | kW transmitter presented at SRF Berlin October U cabinet - WR650 waveguide output on top - water cooled power modules - water cooled driver - built in 24kW 28V power supply Start Development 1/2009; Prototype 9/2009

Member of the Helmholtz Association Page 15 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | Prototype. 8 x 8 Transistors Now: 9 x 8 Transistors Each single transistor is protected by a drop-in circulator

Member of the Helmholtz Association Page 16 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | GAIN and PHASE CHANGE vs POWER SUPPLY VOLTAGE 2kW4.6kW8.5kW9.1kW ∆ gain/ ∆ V 0.01dB/V 0.08dB/V0.06dB/V ∆ phase/ ∆ V0.08°/V0.25°/V1°/V0.6°/V sensitivity to voltage changes measured at different power levels

Member of the Helmholtz Association Page 17 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | OUTPUT POWER in kW ,5 1 INPUT POWER 0,1mW 0,32mW0,032mW OVERDRIVE INTERLOCK 24

Member of the Helmholtz Association Page 18 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | SMPS PN-SOURCE

Member of the Helmholtz Association Page 19 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | RAISE TIME and FALL TIME measured at 8kW output power rise time ≈20ns fall time ≈ 60ns

Member of the Helmholtz Association Page 20 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | Passband of a 9-cell cavity Pickup Signal at Cavity C4 Observation when the Klystron was replaced by a Solid State PA (SSA): Due to a 10 times higher RF- bandwidth of the SSA at certain circumstances (e.g. detuned cavities, high loop gain) the LLRF controller locked not only on the Pi-mode but also on (Pi-1) or / and (Pi-2). The system became instable. p-Mode p-2 Mode

Member of the Helmholtz Association Page 21 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) |

Member of the Helmholtz Association Page 22 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | Solution: Improved LLRF Controller Redesign of the LLRF-Controller Loop filters with notches in both loops (amplitude, phase) Loop gain is now adjustable independently from the transfere function of the loop filters Result: absolutely stable operation at all circumstances Attenuation >-70dB at Pi-1; -60dB at Pi-2

Member of the Helmholtz Association Page 23 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | TEST OPERATION AT ELBE Routine OP : 08.Feb to 17.Dez.2011 No failures, much smoother than klystron op Regimes of operation: -CW (FEL, Cavity C4: 8MV/m/ 0.7 mA ) - Raise-/Fall time sufficient to run macropulse mode (0.1ms/40ms) -Ok for single pulse mode -Pulse Mode (cavity training)

Member of the Helmholtz Association Page 24 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | TIME TABLE (RF-UPGADE) Feb. 2010: Test-Operation at ELBE (one klystron replaced) Decision in May 2010: we keep the replacement, SSPA is more stable than klystron, Dec.2010: Order of another 9 Bruker SSPA ELBE shutdown 2010/2011: Reconstruction of coolingsystem Sep.2011 to Dec.2011: Delivery of 9 SSPA 17.Dec.2011: Begin ELBE shutdown, all klystrons removed, Jan. 2012: complete new installation of the power RF system 1-st week in Feb.2012: test with dummy load, matching 4-th week in Feb start routine OP of ELBE with SSPA

Member of the Helmholtz Association Page 25 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | FEBRUARY 2012 CAVITIES 1 – 4 DRIVEN BY A PAIR OF 10kW BRUKER SSPA SRF-GUN with one 10 kW SSPA

Member of the Helmholtz Association Page 26 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) |

Member of the Helmholtz Association Page 27 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | LLRF SSA (-0,1dB) Phase Bal. 0 dBm Koax-Splitter (-0,5dB) Waveguide Splitter (-0,2dB) Dummyload +73,7 dBm+74dBm = 25 kW RF-POWER ( 1dB reserve below -1dB comp.: +71 dBm = 12,6 kW (LIMIT: (each amp.8,5 kW): 72,3dBm-0,3dB= 15,58 kW Block Diagram Amp. Bal. MATCHING PROCEDURE IS SIMPEL ! CIRCULATOR

Member of the Helmholtz Association Page 28 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | Summary 20 GHz CW RF System with SSPA: Compact system (turn-key solution) High redundancy ! If the klystron fails, the accelerator stops, if a transistor fails, tjhere is no problem to continue operation ! SSPA technology is developing fast, there is no vacuum device, no time-limiting cathod, For ELBE UPGRADE: we saved about 40 % costs against tubes

Member of the Helmholtz Association Page 29 Hartmut Buettig | Institut Radiation Physics FWKE (ELBE) | IPAC 2014 DRESDEN