Lab-Wide Earned Value Management System Project Core Team Meeting May 28, 2008 Dean A. Hoffer.

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Module 8: Government Required Reports
Best Practices for an Owner Estimating Organization
Schedule Margin July 2013 NAVY CEVM 2 Outline Definition Program Management Perspective Background Policy/Standards Managing/monitoring Summary.
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Recognition of Scope Change in the IPMR July 2013 NAVY CEVM.
Blues Chapter CSEP 1 Earned Value Management System (EVMS) Ron Fradenburg Blues Chapter President 19 March 2013 For more information visit:
Chapter 7: Managing Risk
Estimating Project Times and Costs
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Time and Cost Estimation
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Risk Evaluation Committee CONTINGENCY, RISK & OTHER ALLOWANCES Presentation By: Adam Malkhassian October 2003.
Chapter 1 Project Management Concepts
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 1 Project Management Concepts. 22 Learning Objectives Definition of a project and its attributes Key constraints within which a project must be.
1.  Project: temporary endeavor to achieve some specific objectives in a defined time  Project management ◦ Dynamic process ◦ Controlled and structured.
1 Project Risk Management Project Risk Management Dr. Said Abu Jalala.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Estimating Project Times and Costs Chapter 5.
Management & Development of Complex Projects Course Code - 706
MGA Discussion on Geo Unit Reserve Sharing Region Meeting Discussion Topic Howard Michel Member and Geographic Activities April 2012.
EVM Home Page = = “One Book” DAU POC: (703) (DSN 655) Address: Revised.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Lab-Wide Earned Value Management System Project Core Team Kickoff Meeting April 16, 2008 Dean A. Hoffer.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Manager Core Competencies The core competency.
March 2008Business Affairs -Your Partner for Successful Solutions 1 SERVICE CENTERS.
<Contract # or Subproject Name> IBR In-brief
MGA Discussion on Geo Unit Reserve Sharing Region Meeting Discussion Topic Howard E. Michel, Ph.D, SMIEEE 2012 IEEE Vice President, Member and Geographic.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
APPLICATION GUIDE January 27, 2006 Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed Martin Telephone ;
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
SOFTWARE PROJECT MANAGEMENT
Estimating Project Times and Costs CHAPTER FIVE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved. 10/27/07 SJSU - Bus. 286 David Bentley (Gray & Larson)1 Chapter 5 – Estimating.
1 Cost Health Checks Aug 2013 NAVY CEVM 2 Outline BCWP with no ACWP ACWP with no BAC Credibility of the Most Likely EAC Timely detail planning MR health.
Management & Development of Complex Projects Course Code - 706
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
EVMS Certification Review In Briefing for Fermi Research Alliance, LLC (FRA) Fermilab, Batavia, IL Monday, May 11, 2009 by U. S. Department of Energy Office.
MHSA Revised Fiscal Policies California Department of Mental Health Carol Hood January 17, 2008.
Lab-Wide Earned Value Management System Project Core Team Meeting November 12, 2008 Dean A. Hoffer/Elaine McCluskey.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Lab-Wide Earned Value Management System Project Oversight Committee Meeting December 11, 2008 Dean. Hoffer / Elaine McCluskey.
Lab-Wide Earned Value Management System Project Oversight Committee Meeting September 11, 2008 Dean. Hoffer / Elaine McCluskey.
Lab-Wide Earned Value Management System Project Core Team Meeting September 10, 2008 Dean A. Hoffer/Elaine McCluskey.
Lab-Wide Earned Value Management System Project Core Team Meeting July 10, 2008 Dean. Hoffer / Elaine McCluskey.
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
NDIA PMSC Baseline Stability Working Group February 2010 Neil Albert Pete Wynne.
Performance Measurement Baseline Contract Price (Project Price)
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
MGA Discussion on Geo Unit Reserve Sharing
Chapter 7: Project Cost Management
Performance Measurement Baseline Contract Price (Project Price)
September 2016 EVM 202—Lesson 4 Integrated Baseline Review Process (Part 4: Baseline Maintenance)
September 2016 EVM 202—Lesson 8 Integrated Product Team (IPT) Analysis and Performance Case.
Chapter 7: Project Cost Management
Mastering Change Control
Cost Health Checks NAVY CEVM
MGA Discussion on Geo Unit Reserve Sharing
Risk Adjusted Project Schedules
Insurance and pensions funds
Cost Health Checks NAVY CEVM
Recognition of Scope Change in the IPMR July 2013 NAVY CEVM
Insurance and pensions funds
Presentation transcript:

Lab-Wide Earned Value Management System Project Core Team Meeting May 28, 2008 Dean A. Hoffer.

28-May-2008Lab-Wide EVMS Project Core Team Meeting 2 Agenda

28-May-2008Lab-Wide EVMS Project Core Team Meeting 3 Contingency ANSI EIA-748 –No reference or definition in 748 DOE O 413.3a –Contingency is the portion of the project budget that is available for risk uncertainty within the project scope, but outside the scope of the contract. Contingency is budget that is not placed on the contract, and is included in the Total Project Cost.

28-May-2008Lab-Wide EVMS Project Core Team Meeting 4 Contingency (continued) DOE M –Contingency is the portion of project budget that is available for uncertainty within the project scope but outside the scope of the contract. That is, contingency is budget that is not place on contract. DOE G (EVMS) –In establishing the TPC, DOE should account for technical and programmatic risks. It is important to account for these technical and programmatic risks by establishing a DOE contingency which would be used for providing additional budget should the need arise.

28-May-2008Lab-Wide EVMS Project Core Team Meeting 5 Management Reserve ANSI EIA-748 –An organization may establish a schedule and/or cost reserve to be used for management control purposes in accordance with organizational policy. Management reserve is held for unexpected growth within the currently authorized work scope, rate changes, risk handling, and other program unknowns. Generally, reserve is held for current and future needs and is not used to offset accumulated overruns or under runs. Reserve may be held at the total program level or distributed and controlled at lower management levels. In any case, an organization should be able to account for all of its management reserve. Management reserve is not a contingency that can be eliminated from prices during subsequent negotiations or used to absorb the cost of program changes. The budget being held in reserve must not be viewed by a customer as a source of funding for added work scope.

28-May-2008Lab-Wide EVMS Project Core Team Meeting 6 Management Reserve (continued) DOE O 413.3a –An amount of the total contract budget withheld for management control purposes by the contractor. Management Reserve is not part of the Performance Measurement Baseline. DOE M –An amount of the total allocated budget withheld for management control purposes by the contractor. Management Reserve is not part of the Performance Measurement Baseline.

28-May-2008Lab-Wide EVMS Project Core Team Meeting 7 Management Reserve (continued) DOE G (EVMS) –Contractors should be encouraged to establish a challenging PMB. However, it must be understood that there will be risk events within the contractor’s defined scope of work. A proper balance of challenge versus risks and managing risks can be the key to project success. Many of these risk events may happen and the contractor should be allowed to have a budget reserve that they can use to better plan future work. This budget reserve or MR should not be used to budget newly directed work scope.

28-May-2008Lab-Wide EVMS Project Core Team Meeting 8 Elaine’s Observations ANSI uses only the term “management reserve” and does not use the term “contingency.” Management reserve appears to be used similarly to how Fermilab uses contingency. The term “undistributed budget” refers to a practice that is not currently used at Fermilab, but integral to the concept of management reserve for ANSI. The DOE Order and Manual treat contingency as belonging to DOE for scope adjustments, and management reserve as belonging to the contractor (FRA in our case) for unforeseen circumstances. Contingency is developed through risk analysis.

28-May-2008Lab-Wide EVMS Project Core Team Meeting 9 Elaine’s Observations (continued) DOE EVMS documents have same basic concepts as the order and manual above, but emphasize that management reserve should not be used to increase work scope, which should come out of DOE-held contingency. The management reserve is developed by preparing an aggressive estimate of the project, with the management reserve being the mitigation of risks related to this aggressive approach. BNL treats contingency as that budget held by DOE for uncertainties, and management reserve as that budget held by the contractor for uncertainties.

28-May-2008Lab-Wide EVMS Project Core Team Meeting 10 Elaine’s Observations (continued) JLab distinctions between the two are less clear in their EVMS Description, but allude to DOE (the customer) holding contingency and the contractor holding management reserve. LBNL believes OECM does not recognize contingency, but only management reserve. Their documents use the term management reserve/contingency to refer to one and the same budget for risk mitigation. PNNL has the same approach as BNL above. SLAC/LCLS uses contingency for management control purposes on TEC work and management reserve for management control purposes for OPC work. They also specifically mention that OECM refers to management reserve instead of contingency.