Municipal Water Rights…… Water Law & Policy Seminars March 12, 2012 Kent L. Jones, P.E. State Engineer.

Slides:



Advertisements
Similar presentations
Subdivision Development and Water Right Transfers Dealing with the Conflict between Historic and New Land Use March 6, 2012.
Advertisements

The Surveyors Role in Utah Water Rights Utah Council of Land Surveyors February 19-21, 2014.
If my body were a car, this is the time I would be thinking about trading it in for a newer model. I've got bumps and dents and scratches in my finish.
WATER RIGHTS 101: OVERVIEW OF UTAH WATER LAW Legislative Water Task Force June 15, 2004.
Filing Proofs or Affidavits 2010 Utah Water Users Workshop March 16, 2010 Jared Manning Division of Water Rights.
Intro to Maine Subdivision Law
Hot Topics in Water Rights August 31, 2011 Kent L. Jones, P.E. State Engineer.
 Tamara Prue.  Go over the most common types of applications (15 min)  Discuss water right policy by area (5 min)  Introduce the Public Land Survey.
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
Water Demands for Mining Richard Lowerre Adapted from presentation to Texas Groundwater Summit September 2013.
WATER RIGHTS, 101 or What do you mean, I’m out of Water?
December 9, WHY?  1 st Call: September 2003  2 nd Call: January 13, 2011  Hearing: May 1, MONTHS.
Abandonment Water 101 Abandonment Issues in Wyoming Wyoming Farm Bureau Foundation Leadership Conference Series June 5-6, 2007.
Water Rights Update Rural Water Association of Utah: Legislative Water Rally January 19,2012 Kent L. Jones, P.E. State Engineer.
December 2, 2014 Goshen Valley Appropriation Policy and Current Conditions Goshen Valley, Utah County.
Patty Bartlett Logan County Treasurer / Public Trustee.
Water Rights 101 Jon Culp Washington State Conservation Commission.
If my body were a car, this is the time I would be thinking about trading it in for a newer model. I've got bumps and dents and scratches in my finish.
Vacant Surplus City Property Administration & Finance Committee August 6, 2014.
ARIZONA DEPARTMENT OF WATER RESOURCES SURFACE WATER RIGHTS UNIT.
Upper Colorado River Basin Current Water Rights Issues Division of Water Rights April 2005.
Proof Professionals Training July 15, 2010 Salt Lake City, Utah.
Utah Division of Water Rights June 21, 2004 Current Water Right Issues Rural Water Users Association Boyd Clayton
Data protection and extension of patent rights TRIPS requirements & TRIPS-plus provisions Carlos Correa.
Taking Care of Your Water Rights: Permits, Extensions & Certificates Oregon Association of Water Utilities August 2013 Lisa Jaramillo Water Right Services.
Utah State Engineer Where Do We Go From Here? (and how are we going to get there?) Kent L. Jones, P.E.
Incorporation & Annexation Incorporation: establishment of city as legal entity –Reasons: provide town services (streets, law enforcement, water/sewer,
Bureau of Land Management John Mann, P. E. Assistant State Engineer November 16-17, 2010 Bureau of Land Management John Mann, P. E. Assistant State Engineer.
U.S. Copyright Enforcement Benjamin Hardman Attorney / Advisor Office of Intellectual Property Policy & Enforcement, USPTO.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
Utah Water Users Workshop March 6, 2007 Current Water Rights Issues Jerry Olds State Engineer / Director DWRi.
Utah Division of Water Rights Blake W. Bingham, P.E. Adjudication Program Manager Utah’s Perspective on Forfeiture and Abandonments.
State Engineer Issues Utah Water Users Workshop March 18, 2013 Kent L. Jones, P.E. State Engineer.
GE 120 LECTURE 1 ENGR. MARVIN JAY T. SERRANO LECTURER.
Water: 101 Adjudication. Permit vs. Adjudication Permit Issued Authorizes Holder to Make Use of the Water as Limited by the Permit Beneficial Use Adjudication.
Public Water Supplier Considerations Rural Water Association of Utah April 25, 2013 April 25, 2013 Utah Division of Water Rights Kirk Forbush, P.E. Regional.
Surveying principles 1 Public Water Suppliers S. Ross Hansen P.E., L.S. Region Engineer 4/10/2014 Rural Water Certification Class.
Division of Water Rights WaterRights.utah.gov. Proof of Beneficial Use of Water (proof) Frank Quintana, P.E. Thursday, April 25 th, 2013.
2006 Utah Water User’s Workshop Water Rights Issues Jerry Olds State Engineer.
Presented by: Judy Ausick April 24, 2012 Rural Water Users’ Training
Overview Utah Water Law Application Process Kirk Forbush PE Regional Engineer April 25, 2013.
Declaring Beneficial Use in Water Use Groups R
What You Need to Know about Groundwater Conservation Districts In Texas Tyler December 3,2002 Guy Fipps Professor and Extension Irrigation Engineer Dept.
Filing Proof of Water Development Challenges and opportunities in defining and quantifying water rights via the proof and certification process Jared Manning.
Nebraska Water Law Conference Wyoming Ground Water Laws.
WATER RIGHT CURRENTS Utah Division of Water Rights September 2009.
Adult Protective Services Basic Skills Training Presented by: Rajeev Premakumar Assistant Attorney General Public Assistance Section N.C. Department of.
Water Rights Training for Proof Professionals June 1, 2009 Salt Lake City.
1 Conveying Water Rights Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) April 2013.
State Water Issues – State Engineer Utah Water Users Workshop March 13, 2012 Kent L. Jones, P.E. State Engineer.
Water Right Issues of the State Engineer Utah Water Users Workshop March 17, 2015 Kent L. Jones, P.E. State Engineer.
UTAH WATER USERS WORKSHOP March 15, 2011 HOW FAR CAN I STRETCH MY CFS? Kent L. Jones P.E. Utah State Engineer Utah Division of Water Rights.
1 Conveying Water Rights Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) March 2012.
Declaring Beneficial Use in Water Use Groups R
PATENTS, INTEGRATED CIRCUITS, AND INDUSTRIAL DESIGNS Presented By: Navdeep World Trade Organization.
S.B Municipality Fees. S.B – Environment Budget Reconciliation Bill Enacted during the 2011 regular legislative session and becomes effective.
Utah Division of Water Rights June 21, Boyd Clayton April 25, 2015 Public Water Suppliers.
Water Users’ Workshop Change Applications Utah Division of Water Rights John Mann, P.E. March 17, 2010.
Upper Colorado River Basin Current Policy and Issues Utah Division of Water Rights September 2009.
Surplus City Property – Request for Proposals Administration & Finance Committee February 1, 2012.
Utah Division of Water Rights June 21, 2004 RWAU Training – April 2016 Marc K. Stilson, P.E., CPM, M.ASCE Regional Engineer, Southeastern UT Applications:
Utah Division of Water Rights June 21, 2004 From Application to Certification Clark Adams--April 2016 The Application Process.
Office of Management and Enterprise Services Central Purchasing Division Keith Gentry Contract Manager
The History and Origin of Water Rights Law Norman K. Johnson Tooele County Water Users Workshop September 7, 2011 Tooele County Health Building Tooele,
2016 Water Legislation Northern Utah Water Conference Boyd Clayton, PE. March 29, 2016 Deputy State Engineer.
Implementation Under HB 25 – Quantity Impairment Water Law and Policy Seminars Kent L. Jones, P.E. March 14, 2016 State Engineer.
Utah Division of Water Rights
Municipal Land Use Law C.40:55D-53 - NEW DEVELOPER
14. “(1) Unless otherwise agreed where the originator has stated that the electronic communication is conditional on receipt of acknowledgment, the electronic.
Stakeholders sensitization PRESENTED BY ANTHONY GACHAI PTA
Presentation transcript:

Municipal Water Rights…… Water Law & Policy Seminars March 12, 2012 Kent L. Jones, P.E. State Engineer

Article XI, Section 6. [Municipalities forbidden to sell waterworks or rights.] Article XI, Section 6. [Municipalities forbidden to sell waterworks or rights.] No municipal corporation, shall directly or indirectly, lease, sell, alien or dispose of any waterworks, water rights, or sources of water supply now, or hereafter to be owned or controlled by it; but all such waterworks, water rights and sources of water supply now owned or hereafter to be acquired by any municipal corporation, shall be preserved, maintained and operated by it for supplying its inhabitants with water at reasonable charges: Provided, That nothing herein contained shall be construed to prevent any such municipal corporation from exchanging water rights, or sources of water supply, for other water rights or sources of water supply of equal value, and to be devoted in like manner to the public supply of its inhabitants. No municipal corporation, shall directly or indirectly, lease, sell, alien or dispose of any waterworks, water rights, or sources of water supply now, or hereafter to be owned or controlled by it; but all such waterworks, water rights and sources of water supply now owned or hereafter to be acquired by any municipal corporation, shall be preserved, maintained and operated by it for supplying its inhabitants with water at reasonable charges: Provided, That nothing herein contained shall be construed to prevent any such municipal corporation from exchanging water rights, or sources of water supply, for other water rights or sources of water supply of equal value, and to be devoted in like manner to the public supply of its inhabitants.

Obtaining a Water Right The same as any other user: The same as any other user: Put to use before the law went into effect, surface -1903; groundwater Put to use before the law went into effect, surface -1903; groundwater Have an application approved by the State Engineer Have an application approved by the State Engineer Purchase or otherwise receive a water right from some other water right holder. Purchase or otherwise receive a water right from some other water right holder.

Obtaining a Water Right Municipal use is a recognized use under statute. Municipal use is a recognized use under statute. The nature of use of a water right must be approved for municipal use for it to be used as such. The nature of use of a water right must be approved for municipal use for it to be used as such. Conversion of other rights to municipal use will be limited to historic diversion and depletion limitations of the underlying right to prevent enlargement of the right and impairment to the rights of others. Conversion of other rights to municipal use will be limited to historic diversion and depletion limitations of the underlying right to prevent enlargement of the right and impairment to the rights of others.

What is a Municipal Use Water Right? A water right that can be used for all those uses that typically occur in a community setting, i.e. A water right that can be used for all those uses that typically occur in a community setting, i.e. Domestic, irrigation, stockwater, commercial, industrial, fire protection, etc. Domestic, irrigation, stockwater, commercial, industrial, fire protection, etc. Uses outside of those typical uses have generally required water rights authorized for specific uses: power generation, snowmaking, and mining. Uses outside of those typical uses have generally required water rights authorized for specific uses: power generation, snowmaking, and mining.

What is a Municipal Use Water Right? Historically, municipal use rights have only been granted to municipalities. Historically, municipal use rights have only been granted to municipalities. With the changes in HB 51 in 2008 which extended municipal water right attributes to “public water suppliers”, in December of 2010 the state engineer issued a policy to allow the municipal use water right privilege to be extended to public water suppliers. With the changes in HB 51 in 2008 which extended municipal water right attributes to “public water suppliers”, in December of 2010 the state engineer issued a policy to allow the municipal use water right privilege to be extended to public water suppliers.

Municipal use water rights verses a water right held by a municipality or public water supplier? A water right approved for municipal use. A water right approved for municipal use. Water rights held by municipalities or other public water suppliers don’t have to be “municipal” water rights. They can be other uses specifically listed like domestic and irrigation but would still have the public water supplier’s protection for those rights. Water rights held by municipalities or other public water suppliers don’t have to be “municipal” water rights. They can be other uses specifically listed like domestic and irrigation but would still have the public water supplier’s protection for those rights.

Water Rights Subject to Forfeiture For Nonuse Since 1888 Utah has had a statute providing for the reversion of water to the public upon abandonment or nonuse. Since 1888 Utah has had a statute providing for the reversion of water to the public upon abandonment or nonuse. The right ceased upon the expiration of the statutory period: 7 years until 1919 and the 5 years after that. The right ceased upon the expiration of the statutory period: 7 years until 1919 and the 5 years after that extensions of time to resume use (nonuse) applications instituted extensions of time to resume use (nonuse) applications instituted.

Discussions on Forfeiture Until 1996, If water was not beneficially used for a period of 5 years it was considered forfeited, it ceased to exist and reverted to the public. It was available for appropriation unless a nonuse application was filed. Until 1996, If water was not beneficially used for a period of 5 years it was considered forfeited, it ceased to exist and reverted to the public. It was available for appropriation unless a nonuse application was filed. In 1996, the law changed to indicate that the forfeiture of a water right had to be a judicial action and if you had been using your water for a period of 15 years, the right was not subject to forfeiture. But it still said if you didn’t use your water for 5 years the right ceased. In 1996, the law changed to indicate that the forfeiture of a water right had to be a judicial action and if you had been using your water for a period of 15 years, the right was not subject to forfeiture. But it still said if you didn’t use your water for 5 years the right ceased.

Discussions on Forfeiture In 2008, the forfeiture statute was again altered. In 2008, the forfeiture statute was again altered. The 5 year period for nonuse was changed to 7 years and public water suppliers were not subject to forfeiture if the water right was held for the reasonable future water requirements of the public based on a 40-year plan. The 5 year period for nonuse was changed to 7 years and public water suppliers were not subject to forfeiture if the water right was held for the reasonable future water requirements of the public based on a 40-year plan. Several exemptions for nonuse were detailed. Several exemptions for nonuse were detailed. The reference to a water right ceasing was removed from the statute. The reference to a water right ceasing was removed from the statute.

Discussions on Forfeiture Public Water Suppliers were defined in to be “an entity that supplies water, either directly or indirectly, to the public for municipal, domestic, or industrial use;” Public Water Suppliers were defined in to be “an entity that supplies water, either directly or indirectly, to the public for municipal, domestic, or industrial use;” Could be a public entity, a water corporation, a community water system, or a water association. Could be a public entity, a water corporation, a community water system, or a water association.

Discussions on Forfeiture If it is a community water system, it must supply water to at least 100 service connections used by year-round residents or serve at least 200 year-round residents. If it is a community water system, it must supply water to at least 100 service connections used by year-round residents or serve at least 200 year-round residents.

Discussions on Forfeiture : “When an appropriator or the appropriator’s successor in interest abandons or ceases to use all or a portion of a water right for a period of seven years, the water right or the unused portion of that right is subject to forfeiture … unless the appropriator or the appropriator’s successor in interest files a nonuse application with the state engineer.” : “When an appropriator or the appropriator’s successor in interest abandons or ceases to use all or a portion of a water right for a period of seven years, the water right or the unused portion of that right is subject to forfeiture … unless the appropriator or the appropriator’s successor in interest files a nonuse application with the state engineer.”

Discussions on Forfeiture does not apply to, except as provided in Subsection (2)(g), a water right owned by a public water supplier which is “conserved or held for the reasonable future water requirement of the public, which is determined according to Subsection (2)(f);” does not apply to, except as provided in Subsection (2)(g), a water right owned by a public water supplier which is “conserved or held for the reasonable future water requirement of the public, which is determined according to Subsection (2)(f);”

Discussions on Forfeiture Subsection (2)(f): “The reasonable future water requirement of the public is the amount of water needed in the next 40 years by the persons within the public water supplier’s projected service area based on projected population growth or other water use demand.” Subsection (2)(f): “The reasonable future water requirement of the public is the amount of water needed in the next 40 years by the persons within the public water supplier’s projected service area based on projected population growth or other water use demand.”

Discussions on Forfeiture Subsection(2)(g): “For a water right acquired by a public water supplier on or after May 5, 2008, Subsection(2)(e)(vii) applies if: the public water supplier submits a change application under Section ; and the state engineer approves the change application.” Subsection(2)(g): “For a water right acquired by a public water supplier on or after May 5, 2008, Subsection(2)(e)(vii) applies if: the public water supplier submits a change application under Section ; and the state engineer approves the change application.”

Discussions on Forfeiture Intent language with the 2008 changes (HB 51) said these changes are “not intended to change the way the State Engineer evaluates change applications based on historic beneficial use or validate any invalid water rights.” Intent language with the 2008 changes (HB 51) said these changes are “not intended to change the way the State Engineer evaluates change applications based on historic beneficial use or validate any invalid water rights.” This caused a significant concern when the ruling on the Jensen v Jones case was issued in This caused a significant concern when the ruling on the Jensen v Jones case was issued in What do we do if a public water supplier wants to buy a right and file a change on a water right for which there is no identifiable beneficial use and would be subject to challenge for forfeiture in court? What do we do if a public water supplier wants to buy a right and file a change on a water right for which there is no identifiable beneficial use and would be subject to challenge for forfeiture in court?

Discussions on Extensions Section (5): “The state engineer shall state in any decision approving an application the time within which the construction work must be completed and the water applied to beneficial use.” Section (5): “The state engineer shall state in any decision approving an application the time within which the construction work must be completed and the water applied to beneficial use.” (1): “Sixty days before the date set for the proof of appropriation or proof of change to be made, the state engineer shall notify the applicant by mail when proof of completion of the works and application of the water to a beneficial use is due.” (1): “Sixty days before the date set for the proof of appropriation or proof of change to be made, the state engineer shall notify the applicant by mail when proof of completion of the works and application of the water to a beneficial use is due.”

Discussions on Extensions (2)(a) “Within the time set by the state engineer under subsection (5), an applicant shall: construct works, if necessary; apply the water to beneficial use; and file proof with the state engineer in accordance with section ” (2)(a) “Within the time set by the state engineer under subsection (5), an applicant shall: construct works, if necessary; apply the water to beneficial use; and file proof with the state engineer in accordance with section ” (2)(c): “An applicant shall file a request for an extension of time on or before the date set for filing proof.” (2)(c): “An applicant shall file a request for an extension of time on or before the date set for filing proof.”

Discussions on Extensions : “When an application lapses for failure of the applicant to comply with the provisions of this title or the order of the state engineer, notice of such lapsing shall forthwith be given to the applicant by regular mail. Within 60 days after such notice the state engineer may, upon a showing of reasonable cause, reinstate the application with the date of priority changed to the date of reinstatement.” : “When an application lapses for failure of the applicant to comply with the provisions of this title or the order of the state engineer, notice of such lapsing shall forthwith be given to the applicant by regular mail. Within 60 days after such notice the state engineer may, upon a showing of reasonable cause, reinstate the application with the date of priority changed to the date of reinstatement.”

Discussions on Extensions (2)(b): Except as provided by Subsection (4), the state engineer shall extend the time in which an applicant shall comply with Subsection(2)(a) if: (2)(b): Except as provided by Subsection (4), the state engineer shall extend the time in which an applicant shall comply with Subsection(2)(a) if: (i) the date set by the state engineer is not after 50 years from the day on which the application is approved; and (i) the date set by the state engineer is not after 50 years from the day on which the application is approved; and (ii) the applicant shows: (ii) the applicant shows:

Discussions on Extensions “(A) reasonable and due diligence in completing the appropriation; or “(A) reasonable and due diligence in completing the appropriation; or (B) a reasonable cause for delay in completing the appropriation.” (B) a reasonable cause for delay in completing the appropriation.”

Discussions on Extensions (2)(h) “The state engineer shall consider the holding of an approved application by a public water supplier… to meet the reasonable future water … requirements of the public to be reasonable and due diligence in completing the appropriation for the purposes of this section for 50 years from the date on which the application is approved.” (2)(h) “The state engineer shall consider the holding of an approved application by a public water supplier… to meet the reasonable future water … requirements of the public to be reasonable and due diligence in completing the appropriation for the purposes of this section for 50 years from the date on which the application is approved.”

Discussions on Extensions (2)(h)(i) If the state engineer finds unreasonable delay or lack of reasonable and due diligence the state engineer may deny the extension of time or grant the request in part or upon conditions, including a reduction of the priority. (2)(h)(i) If the state engineer finds unreasonable delay or lack of reasonable and due diligence the state engineer may deny the extension of time or grant the request in part or upon conditions, including a reduction of the priority. (3) If proof is not filed within 50 years the application shall lapse with some exemptions. (3) If proof is not filed within 50 years the application shall lapse with some exemptions.

Discussions on Extensions (4)(a) If the works are constructed, extensions may be granted beyond the 50 years to submit proof. (4)(a) If the works are constructed, extensions may be granted beyond the 50 years to submit proof. (4)(b) Extensions MAY be granted after 50 years if the applicant is a public water supplier and provides information that shows the water applied for in the application is needed to meet the reasonable future requirements of the public. (4)(b) Extensions MAY be granted after 50 years if the applicant is a public water supplier and provides information that shows the water applied for in the application is needed to meet the reasonable future requirements of the public. Information provided shall be in accordance with (2)(f). (40-year plan) Information provided shall be in accordance with (2)(f). (40-year plan)

Discussions on Extensions (4)(c) The state engineer SHALL extend the time after 50 years if requirements of (4)(b) are met and the applicant has constructed the works to apply the water to beneficial use; or made substantial expenditures to construct the works. (4)(c) The state engineer SHALL extend the time after 50 years if requirements of (4)(b) are met and the applicant has constructed the works to apply the water to beneficial use; or made substantial expenditures to construct the works. 40-year plan should be submitted with the extension request. 40-year plan should be submitted with the extension request.

Proving Up on Municipal Water Rights Upon it being made to appear to the satisfaction of the state engineer that the appropriation or change has been perfected and that the water has been put to beneficial use… the state engineer shall issue a certificate Upon it being made to appear to the satisfaction of the state engineer that the appropriation or change has been perfected and that the water has been put to beneficial use… the state engineer shall issue a certificate.

Proving Up on Municipal Water Rights Historically, municipal proofs have being submitted and were certificated based on a cfs flow. These rights will be listed as “unevaluated” and will show the flow rate but will not reflect an acre-foot amount. Historically, municipal proofs have being submitted and were certificated based on a cfs flow. These rights will be listed as “unevaluated” and will show the flow rate but will not reflect an acre-foot amount.

Proving Up on Municipal Water Rights Water must be put to beneficial use and proof submitted by the due date. Water must be put to beneficial use and proof submitted by the due date. Proof should reflect those amounts of water that have been put to beneficial use in an acre-foot amount. A cfs flow can also be listed. Proof should reflect those amounts of water that have been put to beneficial use in an acre-foot amount. A cfs flow can also be listed. The applicant would only prove up on an acre-foot amount that is above and beyond what is already perfected. The applicant would only prove up on an acre-foot amount that is above and beyond what is already perfected.

Proving Up on Municipal Water Rights Those portions of a water right not put to beneficial use should be segregated and have an extension filed on them to protect the balance of the right until it is actually put to beneficial use. Those portions of a water right not put to beneficial use should be segregated and have an extension filed on them to protect the balance of the right until it is actually put to beneficial use.

Proving Up on Municipal Water Rights 3 water rights – 400 ac-ft each. 3 water rights – 400 ac-ft each. 3 separate well sources. 3 separate well sources. Actual beneficial use is 400 ac-ft. Actual beneficial use is 400 ac-ft. 1 of the sources is perfected for 400 ac-ft. 1 of the sources is perfected for 400 ac-ft. All sources may be used but the 400 ac-ft of beneficial use could not be used to prove up on 400 ac-ft for each water right which would total 1200 ac-ft. All sources may be used but the 400 ac-ft of beneficial use could not be used to prove up on 400 ac-ft for each water right which would total 1200 ac-ft.

Proving Up on Municipal Water Rights For water rights held by a public water supplier which are not municipal rights, proof would have to show the actual beneficial uses to which the water used for. i.e. houses, animals, irrigated acres, etc. For water rights held by a public water supplier which are not municipal rights, proof would have to show the actual beneficial uses to which the water used for. i.e. houses, animals, irrigated acres, etc. Or, they could be converted to municipal use and when proof is submitted, evidence would have to be shown that the historical diversion and depletion limits have not been exceeded. Or, they could be converted to municipal use and when proof is submitted, evidence would have to be shown that the historical diversion and depletion limits have not been exceeded.

Questions Questions?