P roblem S olving I nnovator Solving Tomorrows Problems Today Actions taken refers to the actual action taken as described in the FMEA Prevention & Detection.

Slides:



Advertisements
Similar presentations
P roblem S olving I nnovator Solving Tomorrows Problems Today IS - IS NOT / COMPARITIVE ANALYSIS motivates deliberate thinking about the Boundaries of.
Advertisements

Filing a Warranty Claim On-Line Claim Filing. 1.Upon successful login, the screen to the right appears. 2.To start a new warranty claim or check the status.
P roblem S olving I nnovator Solving Tomorrows Problems Today The 1 st Why can be formed once the Team has Brainstormed for Potential Causes The 1 st.
P roblem S olving I nnovator Solving Tomorrows Problems Today Electronic Brainstorm Database Electronic Brainstorm Database Brainstorming stimulates new.
P roblem S olving I nnovator Solving Tomorrows Problems Today 4 th Why / Root Cause Cause & Effect (Fishbone) 4 th Why / Root Cause Cause & Effect (Fishbone)
P roblem S olving I nnovator Solving Tomorrows Problems Today Primary function is to identify and organize possible causes of a specific effect and then.
P roblem S olving I nnovator Solving Tomorrows Problems Today To prevent any potential defects reaching the customer, define and implement containment.
P roblem S olving I nnovator Team problem solving in a production Environment.
P roblem S olving I nnovator Solving Tomorrows Problems Today Overview of how the 5 why automatically generates an FMEA & Control Plans 5 Why - FMEA Relationship.
Changing Nutritional Needs During Pregnancy. Maternal Diet and Infant Health  Recommended weight gain  1# month 1 st Trimester  1# week 2 nd and.
P roblem S olving I nnovator Solving Tomorrows Problems Today Manual Prioritisation of 1 st Why / Functions. Manual Prioritisation of 1 st Why / Functions.
P roblem S olving I nnovator Solving Tomorrows Problems Today User Help The help feature is found through out the PSI.This enables the user to gain a.
P roblem S olving I nnovator Solving Tomorrows Problems Today 3 rd Why / Failure Effect Development 3 rd Why / Failure Effect Development 3 rd Why / Failure.
once the Team has Completed the 4th Why
P roblem S olving I nnovator Solving Tomorrows Problems Today Warnings Clear All prepares the PSI for the next problem. Clearing of D1-D3.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Failure Mode DBS & Chart Root Cause DBS Reviewing/Updating the Databases and Analysing.
Step – by – step Tutorial.  Enter Username  Enter Password  Select OK.
“Stay Back Stay Alive” Lighted Sign Project Phase I: Evaluate Product Phase I: Evaluate Product Phase II: Assess Safety Value of Signs Utilize the Mn/DOT.
P roblem S olving I nnovator Solving Tomorrows Problems Today Identify the need and reason for the PSI. Clearly document the Opportunity Description Identify.
P roblem S olving I nnovator Solving Tomorrows Problems Today 2 nd Why/Voting Techniques Automatic Ranking 2 nd Why/Voting Techniques Automatic Ranking.
P roblem S olving I nnovator Solving Tomorrows Problems Today 1 st Why / Function Pareto Chart 1 st Why / Function Pareto Chart Overview of Percentage.
P roblem S olving I nnovator Solving Tomorrows Problems Today 2 nd Why / Requirements Cause & Effect (Fishbone) 2 nd Why / Requirements Cause & Effect.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Benefit Description Force Field Analysis will identify the viability of Recommended.
P roblem S olving I nnovator Solving Tomorrows Problems Today The Team should Accept the PSI Innovation and develop the Team Structure & Logistics The.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Causes of a Problem can be Arranged into Independent Groups and each Group can.
Does Anyone Remember Lawn Darts?. Yet Another Picture of Lawn Darts.
Failure Mode & Effect Analysis Tom Hannan & Kevin Kowalis Eastern Illinois University School of Technology Total Quality Systems INT 5133 (FMEA)
PURPOSE OF DFMEA (DESIGN FAILURE MODE EFFECTS ANALYSIS)
Popcorn Sample PFMEA: Process Flow
PTY (Ltd)Reg No: 2007/019351/07. FAILURE MODE & EFFECT ANALYSIS 4 th Edition (Including Control Plans) WHAT IS AN FMEA? FMEA is an analytical technique.
P roblem S olving I nnovator Solving Tomorrows Problems Today Once the Problem Profile is determined, the Process Control can be implemented correctly.
Barry Murash MBBit Nortel 2007
P roblem S olving I nnovator Solving Tomorrows Problems Today Problem / Improvement Confirmation Problem / Improvement Confirmation Management should.
8D Report provides a summary of the PSI
P roblem S olving I nnovator Solving Tomorrows Problems Today The Fault Tree will automatically be generated once the Team has Completed the 5 th Why.
P roblem S olving I nnovator Solving Tomorrows Problems Today Databases for Improvements Prevention/ Lessons Learned Prevention/ Lessons Learned Potential.
Presented to: [Date] By (Insert Name) Failure Mode and Effect Analysis (FMEA)
P roblem S olving I nnovator Solving Tomorrows Problems Today Before beginning, establish the parameters of the opportunity. Do this by completing the.
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-
Presented to [Date] By [Insert Name] The Application of FMEA to a Medication Reconciliation Process.
P roblem S olving I nnovator Solving Tomorrows Problems Today Current Situation Prevention / Detection Current Situation Prevention / Detection Analyzing.
Analyze Opportunity Part 1
BELU, IONESCU, MISZTAL - Computer Aided Design Solution Based on Genetic Algorithms for FMEA … Amsterdam, 06 August 2015 COMPUTER AIDED DESIGN SOLUTION.
Failure Mode and Effects Analysis (FMEA)
P roblem S olving I nnovator Solving Tomorrows Problems Today Analysis to minimize all future negative unforeseen effects of stated PSI subject Risk Analysis.
Indices – The Six Basic Index Laws 1 st Law 5 3 x 5 4 = (5 x 5 x 5) x (5 x 5 x 5 x 5)= 5 7 Example: aax=a + mnmn.
ME 4054W: Design Projects RISK MANAGEMENT. 2 Lecture Topics What is risk? Types of risk Risk assessment and management techniques.
1 Criteria for a Successful FMEA Design & Process.
Getting The Most Out Of Release Detection Testing National Tanks Conference 2015 Phoenix, Arizona September 15,
FMEA.
© The Concept Factory © Science Link | 2© Science Link 2013  Three calls during Results:  66 applications, companies from 8 countries.
P roblem S olving I nnovator Solving Tomorrows Problems Today Saving with a Backup insures that the work that has been done in the PSI can be recovered.
Blueprint Training Presentation: Time Entry & Equipment October 31, 2006.
Failure Modes and Effects Analysis (FMEA)
AVTC Model Based Design Curriculum Development Project.
Six Sigma Greenbelt Training
FMEA.
FMEA PROCESS FLOW Causes/ failure mechanisms Product definition
Failure Modes and Effects Analysis (FMEA)
FMEA PROCESS FLOW Determine Causes/ mechanisms failure
SNMS Supplier Network Management System
GE 6757 TOTAL QUALITY MANAGEMENT
FMEA تجزيه و تحليل خطا و آثار آن
Simple machines - Levers
بسم الله الرحمن الرحیم.
The Certified Quality Process Handbook Chapter 22: Preventive Action
Rational Exponents and Nth Roots Objectives:
Potential Failure Mode Analysis 4th Edition
PFMEA Summary Process Steps
Failure Mode & Effect Analysis
Presentation transcript:

P roblem S olving I nnovator Solving Tomorrows Problems Today Actions taken refers to the actual action taken as described in the FMEA Prevention & Detection Improvement Summary Current Status Improvement Actions Current Status Improvement Actions Prevention / Detection Confirmed Improvements Prevention / Detection Confirmed Improvements RPN Improvement Values

COVER PAGE Actions Taken

Improvement Summary Recommended Actions Force Field Actions Taken The Force Field Analysis will PUSH Recommended Actions through to Actions Taken.

1 st Y Function = Machining; 2 nd Y Requirements = Cutting Fluid; 3 rd Y Failure Mode = Swarf 5 th Y Current Detection Control = None Recommended Improvement = Install Magnet to collect large particles …… 4 th Y Root Cause = Damaged Filter 5 th Y Current prevention = Preventive Maintenance Recommended Detection Improvement = Use Magnet to indicate excessive Swarf 5 Whys Current Status Current Status Improvement Actions New Detection = 4 New Occurrence = 2 Severity = 6 Occurrence = 3 Detection = 8

The NEW Preventive Action can now be described as Preventive Maintenance & Magnet Collecting Excess Swarf Confirm & Approve the improved Prevention or Detection Actions. The NEW Detection Control can now be described as Magnet Detecting Swarf The required / expected Implementation Date can be indicated along with the Person Responsible (initials) Prevention / Detection Confirmed Improvements

PSI will Calculate the Existing RPN Value New RPN Value Improvement in RPN Value RPN Improvement Values

P roblem S olving I nnovator Solving Tomorrows Problems Today This completes the Actions Taken Now start the Implementation Plan