RPC Operation Jilei, Qingmin, Changguo, Ningzhe 2013/4/3.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
1 Monitor of Isobutane Content in the RPC Gas Mixture Changguo Lu, Kirk McDonald Princeton University (10/22/2008)
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 2 – Manuel Proissl HBD Meeting 06/23/2009.
1 Sep. 19, 2006Changguo Lu, Princeton University Induced signal in RPC, Configuration of the double gap RPC and Grouping of the strips Changguo Lu Princeton.
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
Daya Bay RPC Gas System: Safety Subsystem Changguo Lu, Princeton University (Jan. 12, 2008)
E.H. #1 RPC Gas System Commissioning  “Leaky” modules’ study 1 Changguo Lu, Princeton University Qingmin Zhang, IHEP Shih-Kai Lin, University of Houston.
1 April 7, 2009 C. Lu Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
C. Lu, RPC System Installation Workshop, 6/11/2009, CUHK 1 1 RPC gas system installation (step by step plan) (CUHK, 6/11/2009) Changguo Lu, Kirk McDonald.
Daya Bay RPC Gas System Installation at EH#1 Lu Changguo 1Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/2010 Our original gas system installation.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 1 1 Some thoughts on RPC gas system slow control (Dongguan, 7/15/2008) Changguo Lu Princeton.
1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.
C. Lu, RPC Gas Slow Control Workshop, 6/10/2009, CUHK 1 1 RPC gas system slow control (CUHK, 6/10/2009) Changguo Lu Princeton University.
Characterization And Testing Of 2m X 2m Glass Resistive Plate Chamber Mohammed Salim M Aligarh Muslim University.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
HBar OR Reader Documentation A copy of the PowerPoint Viewer is shipped with the HBar OR Reader on the HBar Official Records [OR] CD. The PowerPoint Viewer.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Electronic Detector status and run organization Logistics and organization Updates on the electronic detector since last year run Conclusions.
Status of TRD Chamber and Readout Electronics Integration Ken Oyama and Christian Lippmann for the TRD Collaboration Sep. 26, 2005 TRD status meeting in.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
BigBite Wire Chamber Test Xin Qian Duke University Feb 20th For TRANSVERSITY Collaboration Wire chamber Gas Cerenkov Shower system Scintillator Magnetic.
Ion Source Update. We now have 2 running sources Source B has been running since the first part of June Both sources have been modified extensively since.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
EH#1 RPC Gas System Repair Report - Zhijian Zhang; Y. Lei; Qiang Xiao & Changguo Lu 11/5/2013.
Time series Model assessment. Tourist arrivals to NZ Period is quarterly.
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Status summary of RPC R&D for INO ICAL detector B.Satyanarayana, TIFR, Mumbai Satyajit Jena, IIT Bombay, Powai For INO Collaboration.
Andrea Di Simone Andrea Di Simone – INFN Roma2 Andrea Di Simone CERN PH/ATC and INFN-CNAF On behalf of ATLAS RPC groups: Lecce, Napoli, Protvino, Roma2.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
1 Sasha Milov DC meeting... March 7, 2007 HBD status Sasha Milov March 7, 2007.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
22 Aug Ageing studies: the Miracle HV training.
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
RPC gas purity During 2/18 – 2/26/2013 EH#1 RPC gas flow rate showed anomaly, the total gas and branch #1 flow rate displayed a bump, but all four gases.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
RPC Gas System Operation Report for October, Changguo Lu, Hansheng Sun.
UM PPS Lab Activities Mid-size Panel Tests PPS meeting January 15, 2012 Claudio, Curtis, Dan, Ethan, Riley.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
1 Analysis of Small RPC DHCAL Prototype Data (noise and cosmic ray) LCWA09, Albuquerque, New Mexico Friday, October 02, 2009 Qingmin Zhang HEP Division,
TPC ALARM HANDLER In addition to the big slow controls alarm handler I usually ran a TPC only alarm handler as a separate process. The TPC alarm handler.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
1 Four Stroke Engines How does a canon work?. 2 Engine Operation Gasoline & diesel engines convert chemical energy into mechanical energy.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Possible Improvement of MUID Performance Itaru Nakagawa, Seyoung Han (RIKEN, Ewha/RIKEN)
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Recent Gain Changes C.Woody HBD Meeting March 23, 2010.
Control System for a four component Gas Mixing Unit Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata
XI Workshop on Resistive Plate Chambers and Related Detectors, INFN, 5-10 February, Aging test of high rate MRPC Wang Yi Department of Engineering.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
1 Dependence of RPC’s Performance on Weather ( run in Digital Hadron Calorimeter Small Prototype with Glass RPCs) For LCWS08&ILC08 from 11/15-11/20 in.
Update on Noise Analysis of the DHCal Test Beam at Fermilab
Noise analysis of the 1m3 DHCal test beam
Barrel RPC Conditions Database
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Shifter Instructions regarding the ZD, Dan Peterson
Banafsheh Hajinasab Based on presentation by K. Strnisa, Cosylab
Status of DT Local Trigger Commissioning
Presentation transcript:

RPC Operation Jilei, Qingmin, Changguo, Ningzhe 2013/4/3

Outline EH1 RPC gas and data fluctuate. EH2,3 data running status Electronics HV Conclusions 2

EH1 RPC gas purity During 2/18 – 2/26/2013 EH#1 RPC gas flow rate showed anomaly, the total gas and branch #2 flow rate displayed a bump, but all four gases showed quite stable rates. Flow rates of 4 gases show no change in 2/18 – 2/26 period. But total and branch #2 flow rates show a big bump in 2/18 – 2/26 period. 3

Performance of EH#1 RPC During that time period the performance of EH#1 RPC system had quite noticeable change. The efficiency was ~7% lower! That is clear indication that gas mixing ratio was changed during that time. 4

Gas chromatograms (Changguo) We did find some small peaks stand out during that period. 2/23/2013 EH#1 2 additional peaks showed up 5

A possible explanation of the performance degradation (Changguo) As I learned from Jilei and Hansheng, EH#1 changed R134A at 8:35 am, 2/23, changed Isobutane at 22:00, 03/05. We trace down the seen extra small peaks and to see which gas cylinder is responsible to these extra peaks thru the following chromatograms: 1/23/2013 chromatogram showed no extra peaks. 2/21/2013 chromatogram showed no extra peaks, that means before R134A change, there was no extra impurity peak. 6

A possible explanation of the performance degradation (cont’d) Since 2/25 to now the small peaks remain in the chromatogram, however there is a tendency that the extra peaks are diminishing. This might be a clue that these peaks are produced by lighter impurity of R134A, which is boiling off faster than R134A. 2/25/2013 chromatogram showed profound extra peaks. 3/20 and 3/28 chromatogram showed smaller peaks. 3/20/2013 3/28/2013 7

Puzzling An almost exhaust cylinder, but no extra peak found from GC. 02/23 R134a A new cylinder, 2 extra peaks found from GC, but efficiency is going up. 03/05 isobutane 8 Efficiency valley may not caused by the extra peaks. But it strongly relate to gas cylinder change.

R134a exaust 02/23 Pressure of R134a To be safe side, I suggest if the rest of R134a gas <5kg in cylider, we’d better not use it. Means we just use about 95% gas of the cylinder. So gas operator is better to change the bottle a couple of days in advance. 9

Gas peaks shifting(Changguo) I also notice that the gas peak’s positions (retaining time) are changing from time to time. We didn’t put the retaining time information into database before. It looks useful to have these retaining times in the database. I have modified the software, beginning from 3/27/2013 the peak retaining times are available. We can monitor the peaks to see if any performance change related to the peak position. 10

HV Working stably. Except one pair of HV channel trip in EH3. RPC HV 15NP channel trip at Apr 1, 20:00-22:00. This is the 1st tripping happened after last commissioning, I think maybe it is because the moist weather in southern of china comes. I checked the humidity from Jan. to now, the humidity had increased about 10%. so the insulation at some place may become weak. The accumulated charge sometimes sparks at there. HV 15NP current 24 hour plot Humidity Time begin Jan. 1 11

Electronics Working stably. Except one “data check error” happened in EH2, March 31. Fixed, after reboot RPC VME power. Maybe too long time power on for VME and caused the time series had some error. 12

EH2 running status Running stable No obvious abnormal. Aver. Layer Efficiency.Noise Rate Trigger Rate 13

EH3 running status Running stable No obvious abnormal. Aver. Layer Efficiency.Noise Rate Trigger Rate 14

About EH3 5.5 dead module 16NP connect 1 st layer, 17NP = 3 rd layer, 18NP = 2 nd layer, 19NP = 4 th layer. Tested in 18 March. Power on HV, there are charge currents for each layer. Means the 4 couple HV channels all have loads(module). Disconnect the load, the charge current is almost zero. Means the HV cable connection is OK. 1 st layer 4th layer 3rd layer 2nd layer Charge Current test 15

After HV reach the set value, current is stable, but 2 nd layer current is very small, almost 0. That is why we think the 2 nd layer disconnected tested by Viktor and Zhimin. The FEC Electronics self-test no error found. Gas pipe is bubbling. No gas leakage for this module. All the connections are OK, however, very little hits. So this module is still puzzling us. One possible reason is the spacers in RPC chambers in the module unglued much. 16

Conclusions EH1 RPC data have a valley, may caused by RPC gas. From the data we can see it is slowly going back to normal. Suggest change the cylinder a couple of days in advance before gas cylinder exhaust. EH2 and EH3 is running stably. HV trip appeared once in EH3, fixed. Electronics error appeared once in EH2, fixed. The reason of 5.5 module rare triggers is still un- confirm. 17