Need for Commercial Cargo to ISS William Gerstenmaier NASA Associate Administrator for Space Operations FAA Commercial Space Transportation Advisory Council.

Slides:



Advertisements
Similar presentations
2013 Key Issues Review: Enabling Sustained Deep Space Exploration with a Broad Vision Congressional Visits Day Preparatory Briefing Teleconferences February.
Advertisements

Options appraisal, the business case & procurement
Commercial Orbital Transportation System (COTS) Status
NASA Commercial Crew Program COMSTAC May 2011 Page 1 National Aeronautics and Space Administration COMMERCIAL CREW PROGRAM COMSTAC May 2011 E. Mango Commercial.
The Vision for Space Exploration – Challenge & Opportunity ISS Panel Report Robert D. Cabana ISS Panel Chair March 30, 2005.
U.S. Commercial Space Presented to Association of Space Explorers by Jim Voss.
National Aeronautics and Space Administration Commercial Crew and Cargo Program Overview June 17, 2009 Doug Cooke.
National Aeronautics and Space Administration Commercial Crew Program (CCP) Key Paradigm Changes Presenter Title Date of Presentation Philip McAlister.
C2V2 Technical Requirements and Constraints
May, 2007 Commercial Crew & Cargo Program Marc Timm Program Executive, Commercial Crew & Cargo Program NASA Exploration Systems Mission Directorate Program.
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status to the COMSTAC Philip McAlister NASA Exploration Systems Mission.
National Aeronautics and Space Administration The Future of Space Exploration Orion, Ares and Beyond.... AIAA / NSC / JPL Town Hall Meeting 26 April 2007.
NASA_G_O_02_09_05.ppt 1 National Goals and Objectives National Goal To advance U.S. scientific, security, and economic interests through a robust space.
The Commercialization of Space Transportation April 2007.
International Space Station Origin: The international space station project began as a cooperative agreement to build and operate a large orbital station.
Space Exploration Technologies Corporation Spacex.com 1 Rocket Road Hawthorne (Los Angeles) CA USA 1212 New York Ave, Suite 1025 Washington DC
Current uses and facts. Proton Exchange Membrane Fuel Cells were developed by General Electric in the 1960s Current Fuel Cells use Hydrogen gas and Oxygen.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Space Exploration R4ctaCBapM Columbia explodes on re-entry.
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status with a Focus on Insight / Oversight Approach to the COMSTAC.
1 Board Meeting September 29, 2014 Public-Private Transportation Partnership Board.
1 Head of Russian Federal Space Agency ISS Program International Cooperation Paris, June 17, 2009.
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold.
Futron Corporation 7315 Wisconsin Avenue, Suite 900W Bethesda, Maryland Phone Fax ISO 9001 Registered Better.
Transition to 6-person crew ASE conference, Praha Oct 8, 2009 Andreas Schön, ESA All dates used in this presentation are examples only, they do not necessarily.
Current Need Aging space shuttle fleet’s retirement is imminent If the ISS is going to continue operation there needs to be a replacement to get humans.
2008 Non-Geosynchronous Orbits Commercial Space Transportation Forecast John Sloan Federal Aviation Administration Office of Commercial Space Transportation.
1 SpaceX proprietary data constituting “Confidential Information” under applicable agreements. Tim Hughes Vice President & Chief Counsel.
1 Commercial Crew Program The Next Step in U.S. Space Transportation Brent W. Jett October 11, 2012 Commercial Crew Program - Same Crew…New Ride.
1 JSC Welcome to Systems Engineer Workshop To the optimist, the glass is half full. To the pessimist, the glass is half empty. To the engineer, the glass.
Suborbital Experiment Platform Presented to National Council of Space Grant Directors Executive Committee October 30, 2007 James E. Ball Spaceport Development.
EXPLORATION COMMITTEE and Ad hoc BIOMEDICAL COMMITTEE October 16, 2008 NASA ADVISORY COUNCIL.
CHAPTER 2 Supply Chain Management. Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin 2-2 Supply Chain Management.
Space Station Will it be accessible for You and Me?
AMC Governance and Institutional Support. Objectives Build on existing capacity Ensure appropriate independence and credibility through transparency,
National Aeronautics and Space Administration Transitioning Toward the Future of Commercial Human Spaceflight COMMERCIAL CREW PROGRAM AIAA Spring Dinner.
The Augustine Committee Review of Human Spaceflight Plans Committee Briefing to COMSTAC October 29, 2009 Review of US Human Space Flight Plans Committee.
Commercial Space Commercial Space Industries Launchers Cargo vehicles Crew vehicles Space tourism Communications and operations satellites Exploration.
Constellation Space Transportation Planning Office July 30, 2009.
CCS Policy Development Approach & Preliminary Results Shuvendu Bose May 24, 2011.
K A Y S E R - T H R E D E Conference and Exhibit on International Space Station Utilisation October October; Florida International Microgravity.
11 Space Transportation Policy and Market Risks Panel 5 – International Customers, Competitors and Partners The George Washington University Elliot School.
The final Space Shuttle has landed… Now what??. The Space Shuttle Since 1981, NASA space shuttles have been rocketing from the Florida coast into Earth.
COMSTAC Launch Operations Support Working Group May 17, 2007 Jim Ball Spaceport Development Manager NASA Kennedy Space Center Kennedy Space Center Spaceport.
AST Research & Development Activities 26 October 2004 COMSTAC RLV WG Presentation by Shelia Helton-Ingram.
SPACE TAXI Marcel Milanes December 14 th, 2010
Service Level Commitments (SLC) Negotiating Performance Metrics Assessing SLC SLC Outcomes.
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
October, 2005 NASA’s Exploration Architecture. 2 A Bold Vision for Space Exploration  Complete the International Space Station  Safely fly the Space.
03/20/021 Spaceport Vision Team Members Organizations that contributed: Air Force NASA NCSS FAA Industry University Etc.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
Page No. 1 ISS_CM_019 (Rev 01/2011) Sponsoring Org/Office Code: MIO/OC Name of Forum: POIWG Date: 07/27/2011 Increment Manager/Melissa Owens Increment.
William Prosser April 15, Introduction to Probability of Detection (POD) for Nondestructive Evaluation (NDE) This briefing is for status only and.
Sumara M. Thompson-King Deputy General Counsel NASA Headquarters Office of the General Counsel November 2012 NASA’s Commercial Space Activities.
Phil Dempsey ISS Vehicle Office July 15, 2014 Inspection Considerations from the ISS Program NASA In-Space Inspection Workshop 2014.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Cindy Grant SPACE-X & Orbital Lead POD Office/EO
EPA SmartWay Transport Partnership: Assessing Transportation Emissions in the Supply Chain Government Services Administration Governmentwide Transportation.
Page No. 1 ISS_CM_019 (Rev 09/2011) Pre-decisional, For Internal Use Only Payload Safety Review Panel (PSRP) Process Updates/Status International Space.
Office of Infrastructure and Management Results-Oriented Government: The Executive Branch Management Scorecard January 25, 2006 White House Summit on Federal.
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
I NTERNATIONAL S PACE S TATION (ISS) Visualization.
National Goals and Objectives
The International Space Station (ISS)
An Introduction to the NanoRack Platform and CubeLab Modules
Role of external contractors - Assistance, monitoring and evaluation
SpaceX Dragon 2.
Developing Sustainable Projects
Deep Space Exploration Requires the best from all of us
Presentation transcript:

Need for Commercial Cargo to ISS William Gerstenmaier NASA Associate Administrator for Space Operations FAA Commercial Space Transportation Advisory Council May 18, 2007

ISS_CM_019 2 ISS Cargo Supply Strategy NASA is developing an ISS Cargo Supply Strategy that uses a mixed fleet (ATV, HTV, Progresses and US domestic cargo service providers). Strategy requires purchase of domestic delivery services as soon as available. International Partner barters will also be used as identified in the original ISS agreements. Purchase of Russian cargo delivery services will bridge the gap between Shuttle and the new US domestic cargo service providers. Russian services are currently the only other proven upmass capability. The Russian services that have been procured are the minimum needed for ISS survival; commercial services are projected to be required in Once US commercial services are available, no other Russian cargo delivery services will be procured.

ISS_CM_019 3 Initial Assessment of upmass requirements to support life of ISS has been performed. Results indicated at least 48.8 metric ton shortfall beyond capabilities of: Shuttle flyout (13+2+1) ATV offset (3.4 of 5 flights will be US cargo) HTV offset (4.3 of 7 flights will be US cargo) Russian procurement (4.2 MT in ‘10 and 1.4 MT in ‘11) Absolute minimum needed to ensure ISS survival in event of COTS delay. Remaining shortfall to be met by US commercial services: Refinement of cargo upmass requirements is ongoing. FY08FY09FY10FY11FY12FY13FY14FY15TOTAL Shortfall Requiring COTS: Purchase Mass w/1.63 Packing Factor: ISS Cargo Requirements Assessment

ISS_CM_019 4 ISSP Preparations for Commercial Services Finalizing generic visiting vehicle interface requirements Developing them for use during the COTS Phase I process More than typical launch vehicle requirements—proximity operations, berthing, Station arm requirements, hatches, environment, etc Continuing to evaluate future cargo requirements Monitoring system performance (system hardware driver). Monitoring crew usage (crew supplies driver). Analyzing post Shuttle consumable requirements (water, gas, and propellant consumption). Working with other government agencies who could use ISS as a national laboratory (e.g., NIH). Initiated planning for commercial cargo services procurement Evaluating when’s the right time to begin formal procurement activities Weighing different contract structures and configurations Assessing demonstration criteria for launch services and ISS proximity operations

ISS_CM_019 5