9-1 ELC 347 project management Day 22. Agenda Integrative Project –Part 5 Feedback Posted –Part 6 (page 378) Due Dec 9 –Completed project plan and presentation.

Slides:



Advertisements
Similar presentations
Engineering Management Tidbits! © Washington State University James R. Holt, Ph.D., PE Professor Engineering Management.
Advertisements

“Critical Chain” Project Management Presentation for KCMPUG March 19, 2003 Dave Higgins Consulting, Inc. Website:
6-1 Goldratt’s Critical Chain  In 1997, Goldratt introduced the Critical Chain Project Management (CCPM) methodology to apply the theory of constraints.
MGMT 483 – Week 11.  The issues involved in developing a project plan and schedule in the face of constrained resources (people or facilities)  Critical.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 22.
Critical Chain Project Management
11-1 Critical Chain Project Scheduling Chapter 11 © 2007 Pearson Education.
11-1 ELC 347 project management Week Agenda Integrative Project –4 th part due –Outline of deliverables (posted in WebCT)Outline of deliverables.
Critical Chain Project Scheduling. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall11-2 Theory of Constraints (ToC) A constraint limits.
Critical Chain Project Scheduling
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 21.
March 20, Dixie Crow Symposium, Warner Robins, GA Slide 1 Critical Chain Management - Reducing Depot Maintenance Flow Days Scott R. Schultz Mercer.
Project Management Workshop By Jonathan W. Powell, CGFM, PMP.
4.0 CRITICAL CHANGE IN PROJECT MANAGEMENT 4.1 Why should there be need other methods for Project Management to replace or change? Given the level of project.
12-1 ELC 347 project management Week Agenda Integrative Project –4 th part Corrected.. Fedd back sent –5 Th part due –Outline of deliverables.
COS/PSA 413 Day 26. Agenda Assignment 4 Corrected –Wide disparity –Expected 3-4 pages Some only gave me a page or a paragraph –3 A’s, 2 B’s, 2 C’s, 2.
James R. Holt, Ph.D., PE. Constraints Management Washington State University’s Engineering Management Program
Elias M. Awad Third Edition ELECTRONIC COMMERCE From Vision to Fulfillment 12-1© 2007 Prentice-Hall, Inc ELC 200 Day 19.
Project Management © Wiley 2007.
Please CLOSE YOUR LAPTOPS, and turn off and put away your cell phones, and get out your note-taking materials. Today’s daily quiz will be given at the.
MANAGING PROJECT RESOURCES
Five Behaviors That Can Reduce Schedule Risk Getting Started Today Craig Peterson, PMP Multi-Discipline System Engineer The MITRE Corporation Co-Author:
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Midterm Review SE503 Advanced Project Management.
Quick Recap.
6-1 ELC 347 project management Day 16. Agenda Integrative Project –Part 3 due today –Part 4 Due Nov 10 (page 276) –Any of the first five sections can.
Time-Cost Tradeoffs Time-Cost Tradeoff Example Time-Cost Tradeoff Example (cont’d) Project Duration (weeks)Critical Path(s)Task(s) Reduced Total Direct.
File:CCPGS05 CC present Page: 1 ETXPGS
IS 556 Enterprise Project Management 1IS 556 -Spring 2008 Lecture 2 Apr 7, 2008 //48.
More on Scheduling. Recap of Last Class Activity dependencies are shown through CPM/PERT Chart. Critical path Completion date Slack time in non-critical.
1 Critical Chain From “Theory of Constraints” Developed by Elihu Goldratt in 1984 Goldratt – Many of his key ideas were first explained via “business novels”
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 23.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Last Day.
ELC 347 project management
© 2000 The TOC Center of Australia Pty Ltd 1 Critical Chain Overview – AIPM 2003 MktgCCSEAV01grh The TOC Centre of Australia Pty Ltd The.
WWU -- Chemistry Chemistry 351 ORGANIC CHEMISTRY I Dr. George S. Kriz Chemistry Building
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Chain Scheduling, PERT, and MS Project 2003.
MEM 612 Project Management Chapter 6 Allocating Resources to the Project.
Scheduling Work I love deadlines. I love the sound they make as they fly by. -- Douglas Adams.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 4.
Critical Chain Method These sides and note were prepared using 1. The book Streamlined: Building Lean Supply Chain Using the Theory of Constraints. Srinivasan.
Critical Chain Project Management. Outline Overview of Theory of Constraints Revisit conventional project management (Critical Path Management) Overview.
Critical Chain A Novel by Eliyahu Goldratt Copyright 1997.
Critical Chain A Novel by Eliyahu Goldratt Copyright 1997.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Critical Chain Project Management.
11-1 Critical Chain Project Scheduling Chapter 11 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
1 Critical Chain Project Management  A modern approach to dealing with uncertainty in project management (an alternative to PERT)  Developed by Goldratt.
9-1 ELC 347 project management Day 19. Agenda Integrative Project –Part 4 Due –Part 5 Due Nov 24 (page 342) –Any of the first five sections can be resubmitted.
PSYC 2314 Human Growth & Development/Lifespan Denise R. Boyd, EdD CRN# 12725, Summer, 2016 Mini-Term 3 Weeks.
12-1 ELC 347 project management Day 24. Agenda Integrative Project –Part 6 (page 378) Due –Completed project plan and presentation due December 1.
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Critical Chain Project Scheduling
Advanced topics in planning and scheduling
ELC 200 Day 18 – Quiz Day Copyright © 2010 Pearson Education, Inc.
ELC 347 project management
ELC 347 project management
ELC 347 project management
ELC 347 project management
ELC 347 project management
Critical Chain Project Scheduling
Today’s Agenda Go over exam #2 Go over exam #3 Lab 8 for 1 hour
PSYC 2314 Human Growth & Development/Lifespan
ELC 347 project management
ELC 347 project management
Project Time Management
Project Time Management
ELC 347 project management
Project Time Management
Presentation transcript:

9-1 ELC 347 project management Day 22

Agenda Integrative Project –Part 5 Feedback Posted –Part 6 (page 378) Due Dec 9 –Completed project plan and presentation due December 1 PM –Any of the first five sections can be resubmitted for rescoring prior to finals week. The recorded score will the average of the original score and the score on the resubmitted section. Please notify me via which sections you will be resubmitting. Assignment 7 corrected –13 A’s, 1 B and one that I cannot read (Project 2010 files) Assignment 8 (Last One) Posted –Due Dec 12:35 PM Exam 2 Graded –2 A’s, 4 B’s, 9 C’s –Threw out two faulty questions Course Evaluations Discussion on Critical Chain Project Scheduling 6-2

Schedule for rest of semester Today –Chap 11 Dec 2 –Chap 12 –More on MS Project Dec 6 –Group Work –Assignment 8 due Dec 9 –Chap 13 & 14 –IP Part 6 due Dec 1 PM –Quiz 3 Chaps –IP Project’s due 6-3© 2007 Prentice-Hall, Inc

11-4 Critical Chain Project Scheduling Chapter 11 © 2007 Pearson Education

11-5

11-6 Theory of Constraints & Critical Chain Project Scheduling A constraint limits system output. The Goal – Goldratt TOC Methodology 1.Identify the constraint 2.Exploit the constraint 3.Subordinate the system 4.Elevate the constraint 5.Repeat the process

11-7 Variation Common Cause Inherent in the system Special Cause Due to a special circumstance Managers should Understand the difference between the two Not adjust the process if variation is common cause Not include special cause variation in risk simulation Not aggregate discrete project risks

Dropping a marble Top leftTop right Bottom left Center 11-8

11-9 Dr J Edwards Deming

11-10 CCPM and the Causes of Project Delay How safety is added to project activities 1.Individual activities overestimated 2.Project manager safety margin 3.Anticipating expected cuts from management time 25% 50% 80% 90% Gaussian Distribution

11-11 Wasting Extra Safety Margin 1.The Student Syndrome a.Immediate deadlines b.Padded estimates c.High demand 2.Failure to pass along positive variation a.Other tasks b.Overestimation penalty c.Perfectionism 3.Multitasking 4.Path Merging

11-12

11-13 Critical Chain Solutions  Central Limit Theorem  V ∑ = n * V, SD 2 = n * V, SD = n 1/2 * V 1/2  Standard deviation of the sum is less than the sum of the standard deviations!  Aggregating risk leads to reduced risk

9-14

 Activity durations estimated at 50% level  Buffer reapplied at project level –Goldratt rule of thumb (50%) –Newbold formula (2σ)  Feeder buffers for non-critical paths 11-15

11-16

11-17

CCPM Original50% Probability ActivityDuration A105 B62 C147 D21 E83 F126 Total New estimate = 24 + (52-24)/2 = 38

11-19 CCPM Changes  Due dates & milestones eliminated  Realistic estimates – 50% level not 90%  “No blame” culture  Subcontractor deliveries & work scheduled ES  Non critical activities scheduled LS  Factor the effects of resource contention  Critical chain usually not the critical path  Solve resource conflicts with minimal disruption

11-20

11-21

11-22 Critical Chain Solutions Bob Feeder Buffer Project Buffer Bob Buffers protect constraints and prevent delays

11-23 Joe.mpp

11-24 Critical Chain Project Portfolios Drum – system-wide constraint that sets the beat for the firm’s throughput Drum – person, department, policy, resource Capacity constraint buffer – safety margin between projects Drum buffer – extra safety before the constraint

11-25 Applying CCPM to Project Portfolios 1.Identify the drum 2.Exploit the drum a.Prepare a schedule for each project b.Determine priority for the drum c.Create the drum schedule 3.Subordinate the project schedules (next slide) 4.Elevate the capacity of the drum 5.Go back to step 2

11-26 Subordinating Project Schedules Schedule projects based on drum Designate critical chain Insert capacity constraint buffers Resolve any conflicts Insert drum buffers so the constraint is not starved

11-27

11-28 CCPM Critiques  No milestones used  Not significantly different from PERT  Unproven at the portfolio level  Anecdotal support only  Incomplete solution  Overestimation of activity duration padding  Cultural changes unattainable