1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.

Slides:



Advertisements
Similar presentations
CM-22 Magnet Issues, 6 June MICE Magnet Cool Down and Other Issues Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Advertisements

1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
SS and AFC Control Systems Brian Martlew 21 st Sept 2011.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Major items from field affected component list MICE Magnetic shielding review C.Macwaters 23/9/13.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE - UK Project Progress Roy Preece 30 th April 2013.
CRYOGENICS AND POWERING
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MOM Report Galina Vankova RAL, MICE Video Conference.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
Electrical & Control Power Supplies Trevor Hartnett.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 Mice Collaboration Meeting CM28 Bankya Palace Spa Hotel, Sofia, Bulgaria 3 rd -8 th Oct 2010 Daresbury Laboratory Spectrometer Report Authors : Ian Mullacrane.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
1 Engineering Session Summary Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Power Supply System Discussion Topics Steve Virostek / John Joseph LBNL Spectrometer Solenoid Workshop May 10, 2011.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
A Gallagher Oct 2015 Electrical Integration MPB October 2015.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
S A Griffiths CM42 June 2015 Electrical & Control.
Electrical Configuration and System Protection
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
MICE RF System Power Supplies, Control and Monitoring Status report
Electrical & Control.
Focus Coil Quench Detector
Presentation transcript:

1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane John Webb Steve Griffiths Chris White

Recent Electrical Infrastructure work Power feeds for Cryo compressors via distribution boards and local sockets for Phase 2 compressors. 2 3-phase power sockets for cooling channel compressors mounted on shield wall

3 400 / 208 V Distribution transformer installed for Spectrometer Solenoid power supplies Water cooling pumping system for cooling channel compressors Power feeds and inverter drives. Power Distribution

4 - PPS field wiring in MICE Hall complete - Rack wiring termination now about 80% complete Personnel Protection System

Recent Electrical Infrastructure work Target: additional interlocks for PSU Inhibit installed Luminosity Monitor cable installation completed TOF 2 / KL Relocation and Cabling. Modifications made to drive system control box. Reinstalled and tested. 5

Electrical Infrastructure Liquid Hydrogen system prototype controller (PLC & Intrinsic Safety Barriers) 6 Control Testing at AS Scientific (Abingdon) during cool down Gas panel under construction with electrical testing to follow

7 Future Electrical Work for MICE Install cabling systems for EMR Detector Complete Gas Panel Control tests for H 2 delivery system at AS Scientific Upgrade MICE Hall Mains Power Distribution System to meet expected load requirements Build & Install 1 st Spectrometer Solenoid Control System Install Magnet Power Supply cabling Transfer Tracker controls into larger rack to allow room for control crate and power distribution equipment Separate tracker cryostat interlocks and relay to Control Room (Temperature, vacuum, pressure etc.)

DL Electrical Visit to LBNL/Wang NMR to Review Spectrometer 22 nd & 23 rd Feb 2010 Following the Visit, a Report / Recommendations and Actions Document was written and circulated as a discussion document. The following is a summary of the main contents 8

Recommendations/Actions Re-arrange the present Spectrometer power supply racks from a TWO rack power supply system into a THREE rack system and house the dump circuits in the additional rack. This removes the cooling water supplies from the power supply racks and re-establishes the cable access space at the bottom of the racks. House the FOUR Lakeshore 218 (temperature monitoring) units and the TWO AMI 135 (Liquid Helium level sensing) units in the re-arranged racks. 9

Recommendations/Actions “Due to the above rack requirements, investigate whether additional space can be provided in the MICE Hall. This could prove useful for anticipated additional rack space required for future AFC and RFCC power supplies and dump circuits”. 10 Upper Tier (left to right) BPM High Voltage equipment Control System Spare Network Lower Tier (left to right) AFC & RFCC Dump Circuits AFC & RFCC Power Supplies Spectrometer Solenoid #2 Power Supplies Spectrometer Solenoid Dump Circuits Spectrometer Solenoid #1 Power Supplies Diffuser Tracker Planned rack layout is now as shown

Rack Layout – Plan Views 11 Upper Tier (left to right) BPM High Voltage equipment Control System Spare Network Lower Tier (left to right) AFC & RFCC Dump Circuits AFC & RFCC Power Supplies Spectrometer Solenoid #2 Power Supplies Spectrometer Solenoid Dump Circuits Spectrometer Solenoid #1 Power Supplies Diffuser Tracker Ground Floor Level Mezzanine Level

Recommendations/ Actions STFC DL electrical staff to modify rack wiring and power distribution/cable management in line with UK electrical standards. Spare 300A Xantrex power supply and AMI controller to be sent to UK to aid design Control of the DC contactors to be undertaken by the MICE Spectrometer control system. Could also incorporate a PPS interlock if required. Water cooling systems to dump circuits should be flow and temperature monitored with possible UPS back up for an anticipated 30min period of RAPID discharge. 12

Recommendations/ Actions DL EE&PS Group power supply specialists strongly recommend that earth leakage protection/interlocking be implemented. An earth fault / leakage would cause an undetected current to flow in the MICE Hall protective earth network Ohm Leakage Resistors for Xantrex 300A Power Supplies Voltage taps to be made available for quench diagnostics to highlight areas of concern and as a means to prevent internal HTS lead over heating. Additional external circuitry will be required to achieve this.

Further Recommendations / Actions 14 DL EE&PS Group power supply specialists to liaise with Wang NMR directly, as agreed, to gather further information on the AMI420 quench detection system and the Lakeshore 60A power supply earth leakage arrangements to assist in resolving any issues. Fermil ab to provide requirements for mapping and operating procedures considering the long ramp times with no quench protection. (Note: during long ramp times (many hours), with no quench protection, the spectrometer must be supervised at all times). Spectrometer PSU sequence control to be provided by MICE Spectrometer control system. This will require documented information following tests at Wang and magnet mapping at Fermilab. This could prove a KEY requirement. Wang NMR to provide a full circuit schematic diagram of the discharge diode arrangements, both INTERNAL and EXTERNAL. This will allow a detailed energy discharge analysis to be performed, to verify that all circuit components are rated accordingly, if not already done.

Further Recommendations / Actions 15 Investigate the FULL extent of a Helium release in the MICE hall (possibly all 18 magnets) during a quench, to see if additional extraction/monitoring is needed. Check water flow rates in the MICE Hall are sufficient for cooling of cryogenic compressors. (Steve Virostek) DL electrical design to investigate the locations of the requested MAG ON lamps for the SC magnets and ensure that non-magnetic fittings are used around the cooling channel. For complete reference please refer to full report document from IM/JW and Wang NMR PS & Control documentation from Spectrometer Review Nov 10 th 2009.