Emulsion processing at Gran Sasso a brief update The new building Meetings between Company’s management and GS staff to fully define the project ‘Work.

Slides:



Advertisements
Similar presentations
JJ, your No.#1 high quality manufacturing source ! Electrical Products Since 1998.
Advertisements

MGT Liquid & Process Systems Designing and manufacturing of custom-made, innovative stainless steel process solutions Privately owned 40 years of experience.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Mine Construction. Start of Barge Landing area. A trailer, excavator and generator. Early Barge Landing June 2007 with one trailer to start construction.
All-American Mold, Inc. Designers and builders of plastic injection molds. Builders of stamping dies, fixtures, gages and components. Production machining.
Status of OPERA RPC production. A. Garfagnini Opera collaboration meeting Nagoya, 12 march 2002  RPC production at GT;  Schedule for OPERA in 2002; 
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Status report from Swiss labs Ciro Pistillo LHEP Bern University Opera Emulsion Workshop Nagoya December 7 / 9.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
Even More SQA: Work Procedures
Emulsion quality WG2 report Thanks to all the OPERA colleagues who are engaged on handling and developing emulsion.
CBM Superconducting Dipole Magnet
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
OPERA bricks LNGS G.Rosa, C.Sirignano Emulsion Workshop, 7-9 December 2006.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Emulsion Gluing Bologna Group Outline: - Adhesive tape - PVC frames - Vacuum supports for emulsion - 2 nd gluing machine.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
TRU v2 production BoM problems 2 CON26P-EHT113_RA_LC, J2, EHT S-D-RA-LC, SAMTEC CON50P-EHT125_RA_LC, J1, EHT S-D-RA-LC, SAMTEC.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
1 1 Aeronautical Information Services Brief to AIXM User Group 27 February 2007.
TRACI V3 Status & Delivery Plans UPDATE Paolo Petagna LHCb CO2 cooling meeting Apr 15 th, 2015.
F. Sabatié Slides from D. Attié, S. Procureur June 18 th, 2014 Forward-Tagger Tracker – Status & Plan – – Status & Plan –
Assembly Organisation and Duration. Work Site Organisation STORAGE SMA18 UNLOADING CLEAN ROOM CERN-SITE CLEANING MANUFACTURE DIRTY TRIAL ASSEMBLY ISO7.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
1 Silicon Testing at KSU Sergey Korjenevski Kansas State University 06/18/2002 (11 slides total)
RUTGERS INTELLIGENT TRANSPORTATION SYSTEMS INSPECTION AND MAINTENANCE SOFTWARE (RITSIMS) NJDOT TRAINING CASE STUDY.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
OPERA Coll.Meet. October 2002Luca Stanco - Padova1 1.Status of Magnets and financial orders (including RPC) Mario Spinetti15’ 2.Status of RPC (including.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
TG 11 overview / Material screening Hardy Simgen MPI für Kernphysik for Task Group 11.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
SJDAdvisory Committee May Production & Maintenance Steven J. Durand May 2006.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
ELENA installation progress F. Butin / ELENA collaboration.
Teleconference ACS – FREIA 31th May 2017
LIU Wire Scanner Milestones June 2017
BSS Prep work at CERN and Acceptance of Parts
PLC-based control systems at SOLEIL - ICALEPCS 2017
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
Mechanics: (Tim).
The SABRE Crystals Frank Calaprice.
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Stainless Steel Water Well Casing.
March 2018 Facility Planners Meeting
X-ray Pump-Probe Instrument
Electronic Reimbursement Project
Welcome! BI Executive Sponsors June 16, 2016
Retreatment of Superconducting Cavities for the European XFEL
Final Design Authorization
Overall time schedule of SRF activities
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Summer Assignment for AP Psychology
Presentation transcript:

Emulsion processing at Gran Sasso a brief update The new building Meetings between Company’s management and GS staff to fully define the project ‘Work delivery’ (consegna dei lavori) on May, 18th  formal delivery date is 15 months since this date! Area cleared and delimited (also our Cosmic-ray hut displaced...) Excavation expected to start this week We are expected to provide Fe for Cosmic-ray pit shielding by summer The prototype chain Test site hall assigned and prepared for OPERA Main structure assembled, several details defined (e.g. cabling, steel protection, rescue of any leakage, etc.) Several electric components assembled Electronic boxes for manual control and check in prepara-tion (ready next week) Full series of stainless steel tanks in production (prototypes accepted)  Ready and equipped for full scale tests by July, then “automation” program will start G. Rosa / OPERA Coll. Meeting Hamburg, June 2004

The prototype chain INFN Rome A.Buccheri, A. Pelosi, G. R. LNGS D. Di Martino

Emulsion storage – Hall B Nagoya meeting......April......now!