APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.

Slides:



Advertisements
Similar presentations
Trigger & DAQ Ole Hansen SBS Collaboration Meeting 19 March 2010.
Advertisements

Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
12 GeV Trigger Workshop Session II - DAQ System July 8th, 2009 – Christopher Newport Univ. David Abbott.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
1.Status update from May 2011  FADC250 and Trigger modules  Two crate testing success 2.Schedule  How about those requirements?  What’s happened since.
Outline Experiments Setup and DAQ configuration Fastbus for SBS: performance and status GEn/GMn - trigger and DAQ GEp - trigger and DAQ GEM readout Outline.
MB, 9/8/041 Introduction to TDC-II and Address Map Mircea Bogdan (UC)
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
 Brief status update of DAQ/Trigger production hardware  Firmware development for HPS application  CLAS12 CTP ‘upgrade’ notes  Summary Status of the.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
DAQ Issues for the 12 GeV Upgrade CODA 3. A Modest Proposal…  Replace aging technologies  Run Control  Tcl-Based DAQ components  mSQL  Hall D Requirements.
Data Acquisition for the 12 GeV Upgrade CODA 3. The good news…  There is a group dedicated to development and support of data acquisition at Jefferson.
Pions for SoLID May 7 th 2013 SoLID EC meeting A. Camsonne.
David Abbott - JLAB DAQ group Embedded-Linux Readout Controllers (Hardware Evaluation)
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
BigCal Reconstruction and Elastic Event Selection for GEp-III Andrew Puckett, MIT on behalf of the GEp-III Collaboration.
SuperBigbite DAQ and Trigger electronics Alexandre Camsonne Hall A Jefferson Laboratory SBS Review.
Hall A DAQ meeting January 12 th Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
Compton Trigger Design Update Tanja Horn Compton Working Group 6 June 2008.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
SoLID review DAQ recommendations Alexandre Camsonne.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Calorimetry for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory Workshop on General Purpose High Resolution.
Methods to reduce dead time and achieve higher trigger rate. Sparsification Event blocking Parallel DAQ systems SFI Sequencing.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
DAQ deadtime memo Kaz, Grass 2012/01/04 1. Current dead time Dead time measured on 2011/09/29  With TDCmax=4, Deadtime =350 us  With TDCmax=8, Deadtime.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
SBS / A1n DAQ Alexandre Camsonne 02/27/2013. APV25 Standard VME access ok : can configure board Check address assignment in VME64X crate Need to debug.
DAQ Speed and Run2 Estimates April 3, Summary of FADC Development for Faster Performance NameReadoutTrigger ScalersScaler S1 (helicity gated), S2.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Digital Acquisition: State of the Art and future prospects
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Counting Mode DAQ for Compton
Hall A Compton Electron detector overview
Slot number is not critical. Traditionally, Slot 2: ADC,
JLAB Front-end and Trigger Electronics
Alexandre Camsonne August 27th 2016 SoLID collaboration meeting
VETROC for Edet DAQ Bob Michaels (presenting) Scott Barcus Alexandre Camsonne Ben Raydo and the GRINCH group (Todd Averett et. al.) Compton Meeting.
Mott DAQ Speed February 16, 2015.
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
during Fall GMp run (high current)
Example of DAQ Trigger issues for the SoLID experiment
CLAS12 Timing Calibration
JParc-K DAQ System Mircea Bogdan December 9-10, 2006.
Mott DAQ Timing R. Suleiman February 12, 2014.
Alexandre Camsonne January 12th 2016 SoLID collaboration meeting
Alexandre Camsonne January 13th 2015
Alexandre Camsonne September 12th 2015 SoLID collaboration meeting
Possible parasitic measurement during Fall GMp run
August 19th 2013 Alexandre Camsonne
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Presentation transcript:

APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne

Outline HRS Channel count Trigger rates Triggers Deadtime using 3 crates TDC sparsicification Sci Fi readout Possible upgrades – FADC – TDC – Event blocking 4/19/20152APEX DAQ

HRS Detectors Central Ray 2 PMTs S2m Gas Cherenkov Total 4 layers 368 wires each VDC S0 16 Paddles 10 PMTs 2 segmented layers of lead glass blocks 3 APEX DAQ4/19/2015 RHRS Calorimeter S1 ?

Detector channels 44/19/2015APEX DAQ DetectorDetector Channels DAQ channels Gas Cherenkov1010 time 10 amplitude Scintillators time 34 amplitude Calorimeter128 – RHRS 68 – LHRS 128 amplitude 68 amplitude VDC time RHRS 172 amplitude channels – 3 ADC modules 1516 time channels – 16 TDC modules LHRS 112 amplitude channels – 2 ADC modules 1516 time channels – 16 TDC modules

Trigger rate 54/19/2015APEX DAQ SettingABCD Energy (GeV) e - (kHz) π - (kHz) e + (kHz) π + (kHz) Trigger Reduce coincidence timing Suppress pions Possible Improvements DAQ Using of sparsification

Trigger Logic 6APEX DAQ4/19/2015

Trigger rate 74/19/2015APEX DAQ SettingABCD Energy (GeV) e - (kHz) π - (kHz) e + (kHz) π + (kHz) T6 rate (kHz) 20ns window π + rejection = For 4 kHz DAQ dead time is 10% APEX can run without any improvement to DAQ!

4/19/20158APEX DAQ

4/19/20159APEX DAQ

g2p 4/19/201510APEX DAQ

3 Crate configuration 114/19/2015APEX DAQ RHRS 172 amplitude channels – 3 ADC modules 1516 time channels – 16 TDC modules Crate 1: 5 TDC + 1 ADC Crate 2: 5 TDC + 1 ADC Crate 3: 6 TDC + 1 ADC LHRS 112 amplitude channels – 2 ADC modules 1516 time channels – 16 TDC modules Crate 1: 5 TDC + 1 ADC Crate 2: 5 TDC + 1 ADC Crate 3: 6 TDC By reducing number of channels which go to each crate we reduce the amount of data to be recorded and improve dead time.

Sparsification Common Stop Start from background Start from signal full- scale window 0-32 µs (8ns step) Sparsification 0-8µs (0.5ns step) Gate Typical TDC spectrum without sparsification. Only 300ns window out of 1.5µs full scale window has useful data Enabling of sparsification allows to significantly reduce event size. All TDC modules have been tested to work in sparsification mode. 124/19/2015APEX DAQ To be implemented ( Kalyan )

SciFi Readout 4 FADC in each HRS 1 VME64X crate in each HRS – 21 slots – Intel CPU readout – 100 MB/s sustained rate ( 5 x faster than Fastbus ) Could add Cerenkov and other detectors if more FADCs 4/19/201513APEX DAQ

1881M 10 Megawords /s : 40 MB/s – 20 MB/s sustained 16 Hits/channel Conversion time : 12 us 13 bit – 9 us 12 bit AS-AK Handshake Time: 125 nsec typical, 150 nsec maximum. DS-DK Handshake Time: 65 nsec typical, 75 nsec maximum. 4/19/201514APEX DAQ

1877S 10 Megawords /s = 40 MB/s, 20 MB/s sustained 16 Hits/channel Conversion time : 1.2 us + 50 ns/hit 1.75 us Min 7.6 us Max Suppression : windows with steps of 8 ns AS-AK Handshake Time: 125 nsec typical, 150 nsec maximum. DS-DK Handshake Time: 65 nsec typical, 75 nsec maximum 4/19/201515APEX DAQ

164/19/2015APEX DAQ RHRS 172 amplitude channels – 11 FADC modules 1516 time channels – 16 TDC modules Crate 1: 5 TDC Crate 2: 5 TDC Crate 3: 6 TDC Crate 4: 11+4 FADC fits in one crate LHRS 112 amplitude channels – 7 ADC modules 1516 time channels – 16 TDC modules Crate 1: 5 TDC Crate 2: 5 TDC Crate 3: 6 TDC Crate 4: FADC Gain from 1.4 us up to 7.25 us encoding depending on VDC occupancy Deadtime dominated by VDC data transfer 26 FADCs ~ 130 K$ Might be able to borrow from JLab ADC channels on FADC

Event size TDCs 4 x 368 = 1472 channels 368 = 4 TDCs Cluster 5 wires = = 7 words = 28 bytes Time transfer crate block transfer : – 50 us + 2 /16 * 5 = 51 us Time transfer standard : – 7 * ( ) = 7 x 225 = us Block transfer saves time for more than 222 words 4/19/201517APEX DAQ

TDCs on VME 3 VME64X crates available from DVCS 3 VXS crates Need 1472 channels for each HRS – CAEN 1190 : 12 TDCs = 120 K$ – VETROC : 12 VETROC = 60 K$ – F1 : 24 F1 Max 240 K$, can do 120 K$ with JLAB VETROC Need 48 F1 ( most likely not enough ) Can mix F1 and VETROC Improvement : – x2 with 1 crate 9 KHz – x4 with 2 crates 18 KHz 4/19/201518APEX DAQ

Event Blocking Readout Triggers ReadoutOverhead ReadoutOverheadReadoutOverhead Triggers Readout Overhead For one channel readout. 4 events no EB – 280 µs 4 events with EB – 220 µs 194/19/2015APEX DAQ 20µs 50µs 20µs 50µs 20µs 50µs 20µs 50µs 20µs 50µs 50µs 50µs 50µs Readout time is 50 µs + 2 µs per 16 channel. 64 channels – 58 µs 128 channels – 66 µs

Event Blocking test results 204/19/2015APEX DAQ Event Blocking Number of channels Number of modules Life time (%)  20 kHz rate  New TI version 3  Linux CPU

Event blocking Can improve up to 30 % deadtime – 4.5 KHz to 5.8 KHz Depends on rate and event size Need 5 new TI for each HRS = 10 TI and new TS If all VME and event blocking : up 200 KHz rate expected 4/19/201521APEX DAQ

Conclusion Using TDC sparsification should reach 4.5 KHz with 10 % deadtime Use of 3 fastbus crates helps reduce deadtime Will try implement event blocking but needs hardware, testing and modification of analysis software Optimize transfer depending on event size Options for upgrade for some costs 4/19/201522APEX DAQ