LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.

Slides:



Advertisements
Similar presentations
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Frascati, CSN1, 18 Settembre 2007 Oscar Adriani INFN Sezione.
Advertisements

Takashi Sako (STE lab/KMI, Nagoya University) for the LHCf collaboration HEAP 2011, Nov. 2011, KEK 1.
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Status report of the LHCf experiment: preparation for data taking
Muon g-2 and SLAC Detector Test T-519 Momentu m Spin e David Hertzog University of Washington.
LHCf Aspen Workshop on CRP, Apr 2007 W.C. Turner – The LHCf Experiment1 LHCf - an experiment for measuring the very forward production of neutral.
LHCf: a LHC Detector for Astroparticle Physics LHCf: a LHC Detector for Astroparticle Physics Lorenzo Bonechi on behalf of the LHCf Collaboration * University.
Calorimeter1 Understanding the Performance of CMS Calorimeter Seema Sharma,TIFR (On behalf of CMS HCAL)
Technical Report on the CERN LHCf experiment 12 Oct Measurement of Photons and Neutral Pions in the Very Forward Region of LHC O. Adriani(1), L.
Prague – September 9, 2005The LHCf experiment at LHCOscar Adriani The LHCf experiment at LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
CERN – March 10, 2006TAN Installation Workshop - The LHCf experimentOscar Adriani The LHCf experiment Measurement of Photons and Neutral Pions in the Very.
  Florence, June 28 th 2007 – RD07   – 
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
The performance of LHCf calorimeter was tested at CERN SPS in For electron of GeV, the energy resolution is < 5% and the position resolution.
The LHCf experiment Hiroaki MENJO INFN Firenze on behalf for the LHCf collaboration at 29 March 2010, MC4LHC.
M.Gallinaro, ``Innovative Particle and Radiation Detectors’’, Siena, October slide 1 The CDF MiniPlug Calorimeter Forward Physics Conceptual.
The Time-of-Flight system of the PAMELA experiment: in-flight performances. Rita Carbone INFN and University of Napoli RICAP ’07, Rome,
Massimo Bongi - RESMDD October Florence Massimo Bongi - INFN Florence LHCf Collaboration Astroparticle Physics at LHC: the LHCf experiment.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Tsuyoshi Mase for the LHCf collaboration
Beam test of scintillator strips Miho NISHIYAMA Shinshu University ・ scintillator strip calorimeter ・ Kuraray scintillator strips and KNU extruded ・ the.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Parma, 23 Settembre 2010 LHCf status report Oscar Adriani Università degli Studi di Firenze INFN Sezione di Firenze.
CERN, July 7 th, 2010 LHCf status report Oscar Adriani Università degli Studi di Firenze INFN Sezione di Firenze On behalf of the LHCf Collaboration.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 8 March 2011 Time Meeting, BNL.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
Preliminary study of electron/hadron discrimination with the NEUCAL detector.
KEK BT Summary &Plan Shinshu University Miho Nishiyama.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
LHCf Status Oscar Adriani University of Florence & INFN Firenze On behalf of the LHCf Collaboration June 13 th, 2012.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
LHCf Report Takashi SAKO for the LHCf Collaboration 18-Dec-2009 CERN Main Auditorium.
ATLAS Tile Hadronic Calorimeter:
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
The LHCf experiment at LHC Lorenzo Bonechi University and INFN – Firenze On behalf of the LHCf Collaboration CALOR 2006 Chicago, 5-9 June 2006.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
A N DY Status Commissioning with colliding beams L.C.Bland, for AnDY 27 March 2012 Time Meeting, BNL.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
Rita Carbone, RICAP 11, Roma 3 26/05/2011 Stand-alone low energy measurements of light nuclei from PAMELA Time-of-Flight system. Rita Carbone INFN Napoli.
The LHCf Collaboration ITALY Firenze University and INFN: O.Adriani, L.Bonechi, M.Bongi, G.Castellini, R.D’Alessandro, P.Papini, S. Ricciarini, A. Viciani.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
DAMPE: now in orbit G. Ambrosi – DAMPE coll.. DAMPE: now in orbit G. Ambrosi – DAMPE coll.
LHCf: Integration and compatibility with the luminosity monitor
Beam test of Silicon-Tungsten Calorimeter Prototype
Experimental Method: 2 independent detectors on both sides of IP
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Short review of physics topics and detector design Status.
Gamma-ray Large Area Space Telescope ACD Final Performance
Gamma-ray Large Area Space Telescope
CMS High Granularity Calorimeter (HGCAL) Beam H2 2017
LHCf – CSN1 Trieste O. Adriani
Production and test of the LHCf microstrip silicon system
ScECAL+AHCAL+TCMT Combined Beam FNAL
The status and preliminary results of the LHC forward experiment: LHCf
LHCf - an experiment for measuring the very forward
Experimental Method: 2 independent detectors on both sides of IP
The Measurement of Forward Particle Production in LHC
Presentation transcript:

LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size W90 x D280 x H620 Arm#1Arm#2 LHC Ring ATLAS

Where we are with Arm1? Arm1 was fully assembled in Japan in July 2006 (scintillators + fibers + Tungsten) and brought to CERN for the Beam Test

Plastic scintillators + Light guides + Tungsten: –Production in Japan finished in July 2006 –They were brought in Florence end of July First Silicon module (Milestone INFN): –Production in Florence finished in July 2006 Assembly of Arm2 for beam test was done in Florence in August 2006 Arm2 was brought at CERN for the beam test on August 16, 2006 To complete Arm2 3 more silicon modules are necessary –We will finish the modules before Christmas Arm1 and Arm2 are now both in Florence clean rooms Final integration of Arm2 will be done before March 2007 Where we are with Arm2?

Florence clean room (thanks to CMS!!!!!)

Pre-calibrations For all PMTs –PMT gain at "1 MIP" was pre-calibrated by using plastic scintillator with 90 Y beta ray. –HV dependence of gain was measured with all PMTs by using N2 laser. –Saturation effect was measured up to 7 TeV gamma shower maximum. For all Scintillators –The position dependence of light yield was measured to make correction tables For Scifi & MAPMTs –Gain and photon yield difference of each channel was measured by 12 C ion beam.

Pre-calibrations Position dependence of light yield of scintillator x x10 4 Light Intensity [MIPs] ADC Count 7TeV shower Maximum 7TeV shower Maximum Linearity Light Intensity - ADC PMT Linearity checked by N2 Laser.

Beam SPS Arm1 & Arm2 were delivered to Cern on August 16, 2006 They were set up for the beam test Beam period: August 28, September 4 H4 Test Area –Electrons up to 200 GeV –Protons up to 350 GeV –Muons Goal of the test beam: –Energy calibration of the calorimeter –Measurement of the spatial resolution of silicon system Florence telescope (ADAMO) is used to precisely reconstruct tracks

SPS Beam Test LHCf Detector Silicon Tracker Moving Table Trigger Scintillator CERN : SPS T2 H Aug. 28 – Sep. 4 Incident Particles –Proton 150,350GeV/c –Electron 100,200GeV/c –Muon 150GeV/c Setup DAQ rate –1kHz at Arm#1 ( fast enough for 7 TeV run)

Event View - electron r.l. e-e- Shower profile re-constructed from ADC of Scifi 200GeV/c Electron Beam 40mm Calorimeter. ADC of scintillator Layer : 2 r.l. step Layer : 4 r.l. step

Event View - proton - Proton 350GeV/c 40mm Calorimeter ADC 40mm shower profile ① 6r.l. ② 10r.l. ② 30r.l. ② 42r.l. Incident Position Arm # 1 40mmTower the Other Event

Status of Analysis Analysis of H4 beam line test is under going. Data and MC show reasonable agreement even at very preliminary stage. Now checking … –energy scale, energy resolution, position dependence, position resolution, particle identification. ADC distribution of third plastic scintillator layer (6r.l.) for 200GeV electron

Few plots of the beam test results for silicon A high energy electron shower seen on x and y silicon ~ 5 ADC counts XY

Energy measured 100 GeV electrons High Gain X Y

Energy measured 350 GeV protons High Gain X Y

Now the integration in LHC… 1.All the cables have been pulled on both sides 2.The quartz fibers for calibration have been pulled on both sides 3.The container for the fibers of Arm2 have been pulled, fibers will be installed later 4.Installation and commissioning dates have been fixed –LSS1L Bake-out of the section: December 2006; BRAN and LHCf commissioning: from 8/01/2007 to 26/01/2007; BRAN and LHCf final installation: from 14/08/2007 to 17/08/2007. –LSS1R BRAN and LHCf commissioning: from 23/04/2007 to 11/05/2007; bake-out of the sectiont= June, July 2007; BRAN and LHCf LSS1R final installation: from 09/10/2007 to 12/10/ Transport and installation procedure is under detailed study 6.Thermal tests in the Tan will be done this week with a thermal mockup. 7.Position of racks in USA15 are defined, racks are allocated, the precise crate allocation in the racks is under study Very big help from TS/LEA group (Anne-Laure Perrot and Daniela Macina)

Arm#1,Arm#2 ARM#1 ARM#2