Project Final Presentation 5-13-2009 Joe Featherall.

Slides:



Advertisements
Similar presentations
Lecture # 2 : Process Models
Advertisements

Project What is a project A temporary endeavor undertaken to create a unique product, service or result.
Filament Winding Machine. Project Name – Filament Winding Machine Project Number – P09226 Project Family – Competitive FSAE Autosports Systems Project.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
BRAKE DYNAMOMETER DEVELOPMENT FOR DREXEL UNIVERSITY FSAE RACE TEAM MEM-01 Dr. Tein-Min Tan Frank DiMentoAlfredo Vitale Anthony TofaniJohn Henry.
Snapshot Presentation for:  NIATT seeks to be a leader in “Green Vehicle” technologies  Hybrid Technologies can improve performance as well as efficiency.
P09226 Dept of Mech Eng (Sponsor) Dr. Alan Nye (Faculty Advisor) Alexander Sandy (ME), Christofer Brayton (EE), Tiago Santos (ME), Daniel Weimann (ME),
P11228 Week 4 Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss.
EDGE™ Concept Level Project Plan P08110 – UAV Based Digital Imaging System David Eells (Mechanical Engineering)
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
Introduction to Software Engineering Dr. Basem Alkazemi
Project Status Update II R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME)
RIT Senior Design I, Project Review P07310: Electronic Shifted Manual Transmission George Slack Team Guide Jason BotterillTeam Leader, Mechanical Engineer.
EDGE™ Concept Level Project Plan P08110 – UAV Based Digital Imaging System David Eells (Mechanical Engineering)
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
EDGE™ Centering Magnet Device P08028 By: Aaron Burger.
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
EDGE™ Project Status Update P09141 – Satellite Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
EDGE™ Final Project Plan P09701 – Corning Tropel LightGage™ Metrology System Matthew Bradley (ME) Images Courtesy of Corning Tropel.
EDGE™ P08222 – FSAE Engine Management System Erich Fiederlein (EMEN)
Presented by, Jeffrey Ryan.  To develop testing and data collection capabilities for the RIT Baja team and to help them utilize all available resources.
The objective of this project was to design a dynamic similarity test rig to replicate the operating conditions of the main crank bearing in the Dresser-Rand.
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Project Update Joe Featherall Jeffrey Ryan Christopher Crowley.
Project Status Update R09220 – Competitive FSAE Autosports Systems Aaron Heyman (IE) Shijo George (ME) Stephanie Malinowski (ME) Alex Sandy (ME) Greg Wall.
P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.
Project Status Update R09220 – Competitive FSAE Autosports Systems
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
Educational Laboratory Virtual Instrumentation Suite (ELVIS) May Client: National Instruments Advisors: Dr. Mani Mina, Dr. Diane Rover Group Members:
1 Dr. Ralph R. Young Director of Software Engineering PRC, Inc. (703) DOORS USER GROUP CONFERENCE Reston, VA September 17,
Chapter 3 Dr. Bahaa Al-Sheikh & Eng. Mohammed Al-Sumady Intoduction to Engineering Introduction to Engineering Design 1.
P16221 – FSAE Shock Dynamometer System Level Design Review September 29, 2015.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Software Product Line Material based on slides and chapter by Linda M. Northrop, SEI.
Process: A Generic View
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number:
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
FINAL PRESENTATION SENIOR DESIGN P14315 UNIVERSAL PUMP DATA ACQUISITION SYSTEM.
P16221 – FSAE Shock Dynamometer Problem Definition Review.
Tim Southerton Brian Grosso Matthew Morris Lalit Tanwar Kevin Meehan Alex Reid.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
What has been accomplished at the end of MSD 1 & 2?
Project Kick Off R09233: Flight Parameter Measurements Michael Skube (ME)
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
Lightweight Fuel Efficient Engine Package. Team Members Evan See, ME Chris Jones, ME John Scanlon, ME Stanley Fofano, EE Taylor Hattori, ME Brittany Borella,
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Marble Cake Process Improvement – Final Review Aaron Delahanty Arwen Sharp Benson Yu Kenyon Zitzka Ryan Norris.
Integrated Hands-On Mechanical System Laboratories Arif Sirinterlikci, Ph.D., Professor of Engineering Tony Kerzmann, Ph.D., Assistant Professor of Mechanical.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
How IoT Initiatives are Changing Product Development.
P07307: Controls for Dynamic Suspension
Turbomachinery Flow Visualization P08453
P07203 Dynamometry Laboratory Infrastructure
Concept Level Project Plan P08008 – ArcWorks Process Improvement
End of DPM Presentation P08405—Novel Materials Technology
Concept Level Project Plan P08453 – Turbomachinery Flow Visualization
Baja Hybrid Drivetrain Design P14224
MOOG EMA Installation MSD1 - P12251
P08310 PNEUMATICALLY CONTROLLED AUTOMATED SHIFTING SYSTEM FOR A POLARIS OUTLAW / Polaris Industries - Joel Notaro (Sponsor) Professor.
Project Status Update R09220 – Competitive FSAE Autosports Systems
P07107: Mission Control Procedures Aerospace Systems and Technology
P10457: D-R Process Improvement
Project Readiness Review P10029 – Air Muscle Artificial Limb
Final Project Plan P09004 – Eye Movement Tracking Device
MSD I Review February 22, 2008 (9:00 AM) Room
Formula Hybrid - Fall 2018 Lafayette College ECE 491.
Presentation transcript:

Project Final Presentation Joe Featherall

Project Name 3 Projects To be Determined Roadmap Number R10221 Project Family RIT Baja SAE Roadmap Track Automotive Engineering Start Term End Term Faculty Guide Dr. Nye Faculty Consultant Professor Deminco Primary Customer RIT Baja SAE

Stage Outcomes

Chris Crowley

 By implementing a hydraulically actuated sway bar it will be possible for the team to increase there handling dynamics while starting a low risk vehicle control system.  Improvements can be made to both the Dynamic events as well as in Design presentations

 Linear Actuation Development For SAE Teams  Linear Actuation For MSD Implementation  Leverage ATV Auto Shift For Maximized Outcome  Instructional Tool for Vehicle Controls Classes

 Project must:  Be direct bolt in to Baja Vehicle  Be robust  Be cost effective  Compact  Comply with all Baja SAE Rules

Active Swaybar  Industry’s first iteration vehicle control  Team has significant amount of documented research  System can be easily integrated into Baja or Formula car  Plan to use hydraulic actuator with steering wheel position sensor

NameDisciplineRole / Skills Chris DemincoME Faculty Guide, Will work closely with the team on an on-going basis to facilitate success, vast knowledge of vehicle dynamics. TBDEEFaculty Consultant, Will provide support with control system selection, integration and refinement. Chris CrowleyME Project Manager, Schedule meeting, book keeping, and keep team and project on track. Encourage team members. Provide link to the Baja Team and machining knowledge. TBD StudentEEShare responsibility for the selection and integration of the control system and electrical sensors TBD StudentEEShare responsibility for the selection and integration of the control system and electrical sensors TBD StudentMESpec out hydraulic actuator that can supply required load

 Baja Car  CAD Models of the Car  Sensors  Actuators  Team Advisor works at MOOG Controls Inc.

PersonWeek 0->1 TasksWeek 1->2 TasksWeek 2->3 Tasks ME- Project Manager Schedule team meetings and get group information, as well as get group caught up with background information of the project, and expectations. Develop Team norms. Make sure everyone from the group is on task, and is up to speed with each other. Update website, and schedule any needed meetings with Baja. Update website, make sure everyone is on track. Help the other MEs with the design and fabrication of test stand. EE Research sensors and get together with controls professor to go over project scope. Continue research, start looking into where we can get the resources needed for the project. Start finalizing designs for the test stand, and make sure all the necessary recourses are lined up for building it. EE Research sensors and get together with controls professor to go over project scope. Continue research, start looking into where we can get the resources needed for the project. Start getting a hold of actuators and sensors, and wiring and testing them to make sure they will work as needed. ME Get together with the project manager, and help review and research designs. Start to familiarize self with vehicle dynamics and verify loading scenarios Continue working with project manager for finalizing the design of the test stand.

 Lack of Controls Knowledge  Electrical Interfacing  Design Durability  Implementation of design by team

A successful project would result in a functioning linear actuated sway bar on the baja car with the control system and sensors required for the operation.

 Defined Budget  Continued meetings with Faculty Advisor  Meet with Controls professor

Presented by, Jeffrey Ryan

 To develop testing and data collection capabilities for the RIT Baja team and to help them utilize all available resources to better their competitive edge.  Improve Driveline System

Develop Capabilities Dyno. Test Stand Measurement Abilities Testing Procedure Full Drive train testing Test Baseline Current components Further Develop Testing Procedures Identify trends in components Analyze Data Optimization and Innovation “Perfect” current components CVT and Planetary Introduce new components Sequential Manual Mech. Shift

 Driveline component knowledge  Verifies Current Designs and assumptions  Utilizes stagnant resources  More Testing/Data Acquisition  Increase Efficiency  Independent of Vehicle  Instructional tool

DisciplinePurpose ME (Jeff)Integration of Mech. Sys. To Elec. Sys, Controls Development METest Fixture/Mechanical Design METest Fixture/Mechanical Design EE Sensor and Data Acquisition Development, Controls Development

Week 1 Team Values and Norms Background Discussion Intro to Baja Team Project Description Dyno. Capabilities/Usage Tour Dyno. Lab/Baja Shop Week 2 Get Physical Dyno. Measurements Evaluate current components Concept Generation Physical structure Measurement needs What to test Week 3 Finalize Project and testing Plan Begin modeling of structure System level designs Start a detailed materials list Possibly begin ordering

 Engine Dynamometer (Department)  Vehicle components (Baja Team)  Sensors  Material for Test Stand (Department)  Software (Department)

The SD team will be responsible for delivering to the Baja team the Peak Engine Torque Peak Engine Hp Corresponding rpm This can then be used to optimize the CVT that is currently on the Baja car.

 Revisit QFD with Baja Team and SD Team  Finish Uploading to Edge  Further Understanding of Dyno. usage and capabilities  Possibly find or create some documentation