September 2004 doc.: IEEE 15-04-0515-01 Submission Slide 1 Jack Pardee, INNOV8RS, LLC Project: IEEE 802.15 Working Group for Wireless Personal Area Networks.

Slides:



Advertisements
Similar presentations
Doc.: IEEE Submission May 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Advertisements

Doc.: IEEE s Submission January 2015 Mineo Takai, Space-Time EngineeringSlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0395r1 Submission July 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /156r1 Submission José A. Gutierrez/ Pat Kinney March, 2002 Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /0095r1 Submission Jan 2005 Gregg Rasor, FreescaleSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE /0136r0 Submission March 2006 Abbie Mathew, NewLANS Project: IEEE P Working Group for Wireless Personal Area Networks Submission.
July 2004 Jay Bain, Fearn Consulting doc.: IEEE /0379r0 Submission Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE /288r0 Submission September 2000 Tom Siep, Texas InstrumentsSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
September 2003 doc.: IEEE Submission Slide 1 Jason Ellis, Project: IEEE P Working Group for Wireless Personal.
September 2004 Roberto Aiello, Staccato Communications Slide 1 doc.: a Submission Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /317r0 Submission September, 2000 Allen Heberling, Eastman Kodak, CompanySlide 1 NOTE: Update all red fields replacing with your information;
Doc.: IEEE /430r0 Submission José A. Gutierrez November 02 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: b Submission January 2006 Marco Naeve, Eaton Corp. Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /263r0 Submission José A. Gutierrez July-2002 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Submission November 2015 Slide 1Li Qiang, Huawei Technologies Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Doc.: IEEE xxxxx Submission doc. : IEEE Slide 1 Junbeom Hur and Sungrae Cho, Chung-Ang University Project: IEEE P
Doc.: IEEE g TG4g Presentation Jan 2010 C.S. Sum1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)‏
Doc.: IEEE g Submission March 2011 Xing Tao (SIMIT/WSNIRI), Khanh Tuan Le (TI) Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /152r0 Submission May 2000 Tom Siep, Texas InstrumentsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0111r1 Submission May 2006 LEE, CUNYSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
<month year> doc.: IEEE /271r0 September, 2000
Sept 2002 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Add name of submission]
Name - WirelessHD doc.: IEEE g July 2010
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
doc.: IEEE <doc#>
<month year> doc.: IEEE <030158r0> March 2004
May 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]
doc.: IEEE <doc#>
Project: IEEE Wireless Personal Area Networks (WPANs)
March 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Toumaz response to TG6 Call for Applications]
January 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]
<month year> doc.: IEEE <xyz> January 2001
平成31年1月 doc.: IEEE /424r1 July 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c motion.
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4c Project Plan] Date Submitted: [15.
Sept 2004 doc.: IEEE b Sept 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Submission Title: [TG3a Closing Report September 2005]
<month year> doc.: IEEE <xyz> November 2000
<month year> doc.: IEEE / January 2005
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE /XXXr0 Sep 19, 2007 June 2009
<month year>20 Jan 2006
Sept 2004 doc.: IEEE a Nov 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
doc.: IEEE <doc#>
May 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]
平成31年4月 doc.: IEEE /424r1 July 2008 doc.: IEEE c
Project: IEEE Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Response to the No Comments Involving Time To Market.
<month year> <doc.: IEEE doc> January 2016
平成31年5月 doc.: IEEE /424r1 September 2007
doc.: IEEE <doc#1>
<month year> doc.: IEEE / July 2004
March 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [DF6 Radio-burst length over PSDU size] Date.
doc.: IEEE <doc#>
doc.: IEEE <doc#>
10 May 2000 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Open Issues with the TG3 Criteria Document]
January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [17.
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15.
September 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suggested TG3c PAR Changes] Date Submitted:
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
May 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15 May.
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
平成31年7月 doc.: IEEE /424r1 November 2007
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4c Project Plan] Date Submitted: [15.
Nov Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Report on IEEE PAC Draft Status]
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Specialty Networks (WSN) Submission Title: TG4z EIR Agenda for September 2019 Date.
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [ July.
Presentation transcript:

September 2004 doc.: IEEE Submission Slide 1 Jack Pardee, INNOV8RS, LLC Project: IEEE Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Response to the No Comments Involving Time To Market Issues] Date Submitted: [14Sept2004] Source: [Jack Pardee] Company [Innov8rs, LLC] Address [9135 W. Manitoba St. #2, Milwaukee, WI, USA] Voice:[ ], FAX: [], Re: [ a-consolidation-explanations-no-vote-confirmation.doc] Abstract:[Response to a No Vote Comments] Purpose:[Explain rationale for how one or more no votes for confirmation of DS-UWB merger #2 proposal have been addressed by the merger #2 comment resolution team.] Notice:This document has been prepared to assist the IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by

September 2004 doc.: IEEE Submission Slide 2 Jack Pardee, INNOV8RS, LLC Time To Market – Overview Selection Criteria Definitions Representative No-Voter Comments Consolidated Comment Questions and Answers

September 2004 doc.: IEEE Submission Slide 3 Jack Pardee, INNOV8RS, LLC Time To Market – Selection Criteria Definition Time to Market addresses the question of when the proposed technology will be ready for integration Values The Proposal shall include an estimate of a schedule for when the Phy would be available for integration

September 2004 doc.: IEEE Submission Slide 4 Jack Pardee, INNOV8RS, LLC Representative TTM Comments #3 - It is not clear what the time to market for this proposal is. #55 - I would consider changing my "NO" vote for merged proposal #2 to a "YES" vote if: There is a better explanation of the time-to-market considerations. #84 - I also have concern for power and time to market. Lack of data for these items is still missing

September 2004 doc.: IEEE Submission Slide 5 Jack Pardee, INNOV8RS, LLC TTM Comments Continued #29 - Time to market Merge proposal #2 has repeatedly claimed time to market advantages because of "silicon shipping today". I have heard these claims for almost 2 years now repeated over and over again but there is no evidence that this is true. Since this proposal has changed as recently as last meeting, I am worried about time-to-market with this proposal because there is so much work to do and they are so far behind the dozens of vendors already building silicon and end products based on the MBOA proposal. Additionally, in the IEEE meetings the presenters or merged proposal #2 have repeatedly made contradictory statements about whether or not the proposal they are presenting represents the silicon they claim is commercially available …* For me to change my no vote to yes would require seeing working silicon that implements the proposal as I fear there is significant time to market concerns for merge proposal #2. In addition, I would require that credibility of their claims be re-established since there are so many inconsistencies in their past claims. * Some text omitted. See Comment resolution database for full text.

September 2004 doc.: IEEE Submission Slide 6 Jack Pardee, INNOV8RS, LLC TTM Comments Continued #73 - Merge proposal #2 claims time to market advantage of silicon that is supposedly available in the market as generation 3; however, merge proposal #2 has recently drastically changed and the silicon does not represent the proposal before us; does not meet performance requirements as specified by the selection criteria, including power consumption.

September 2004 doc.: IEEE Submission Slide 7 Jack Pardee, INNOV8RS, LLC TTM Comments Continued #152 - Merge proposal #2 claims time to market advantage of silicon that is supposedly available in the market as generation 3; however, merge proposal #2 has recently drastically changed and the silicon does not represent the proposal before us; does not meet performance requirements as specified by the selection criteria, including power consumption.

September 2004 doc.: IEEE Submission Slide 8 Jack Pardee, INNOV8RS, LLC TTM Comments Continued #200 - Freescale has not addressed the questions raised regarding time to market issues with their proposal. The proposal has changed significantly several times, and yet they have continued to say they have ICs ready to ship with each version of their proposal. This is not a realistic statement.

September 2004 doc.: IEEE Submission Slide 9 Jack Pardee, INNOV8RS, LLC TTM Comments Continued #253 - Time to Market - There is too much confusion in the argumentation about DS-UWB products. The arguments since 2003 are that "the silicon is already here, the production has started". However many changes have occurred since that time in Proposal#2, and the way the current silicon reflects or will reflect that (technical changes, interoperability, worldwide regulation) is very unclear to me (gate count, power consumption etc.).

September 2004 doc.: IEEE Submission Slide 10 Jack Pardee, INNOV8RS, LLC Consolidated Time To Market Comment Questions and Answers Q1: What is time to market for DS-UWB proposal? A1: The current version (… r3) of the Merged Proposal #2 Phy design proposal is available for integration now. (September ‘04)

September 2004 doc.: IEEE Submission Slide 11 Jack Pardee, INNOV8RS, LLC Time To Market – Consolidated Questions and Answers Q2: What is the currency of the specification proposed for standardization vis-à- vis the silicon chips in DS-UWB products currently being shipped? A2: Products using integrated circuits that implement the current version (…r3) of the Merged Proposal #2 are estimated to be available in the market from multiple Tier 1 vendors in Q4 of Experience gained from these pre-standard integration implementations provide real world validation of the technology and provide feedback for enhancing the final standard and expediting development of fully compliant products.