1 Update on Proposed Prices and Standards Mailers’ Technical Advisory Committee Steve Kearney Vice President, Pricing & Classification Joe Moeller Manager,

Slides:



Advertisements
Similar presentations
® 1 Mail Prep and Entry Steering Committee Meeting May 14, 2013.
Advertisements

Master Plan. Citizens’ Health Care Working Group Master Plan November 2005.
Line Efficiency     Percentage Month Today’s Date
1 R Mail Preparation Changes NCSC January 18, 2007.
1 Shaping a More Efficient Future Pricing Change Effective Monday, May 14.
1 Product Redesign MTAC Update Cost-Based Rates for Periodicals and Standard Flats February 5, 2004.
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
Price Change 2015 USPS Pricing Overview May 2015.
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
State Milestones Subsidized Insurance Workgroup High Level Timeline 2011 Jan 2011 Feb 2011 Mar 2011 Apr 2011 May 2011 Jun 2011 Jul 2011 Aug 2011 Sept 2011.
Price Change Effective April 26, 2015 Northeast Area Mailing Industry Focus Group Meeting February 25,
1 Rate Case Update Mailers’ Technical Advisory Committee Michael K Plunkett Vice President (A), Pricing & Classification February 2007.
New Address Standards for Commercial Flat-Size Mail.
® Flats Symposium 2008 National Postal Forum ® National Postal Forum 2008.
FLAT MAIL PREPARATION OPTIMIZATION November 5, FLAT MAIL PREPARATION OPTIMIZATION Issue #81 MTAC November 5, 2003.
Welcome to the State Mail User’s Forum. Introduction to State Mail & Distribution Services.
FLAT MAIL PREPARATION OPTIMIZATION WORK GROUP #81 MTAC Report February 5, 2004.
Mailing Services Price Change Effective Jan. 22, 2012 Prepared by Product Classification, U.S. Postal Service October 2011 January 2012 Mailing Services.
New Mailing Services Prices – May 11, 2009 – Updated March 30 Greater Cleveland PCC April 24, 2009.
Optimizing Parcel Preparation & Entry for Seamless Acceptance Final Presentation MTAC Work Group # 109 Industry Leader: Wendy Smith USPS Leader: Jim Cochrane.
1 Shaping a More Efficient Future Pricing Change Effective Monday, May 14 and Sunday, July 15.
New Address Standards for Commercial Flat-Size Mail.
Product Redesign MTAC Update February 6, PRODUCT REDESIGN Bob O’Brien – Industry Co-Chair John DePiazza Joe Lubenow Clarence Banks Robert Lindsay.
1 Shaping a More Efficient Future Price Change Proposal Mailers’ Technical Advisory Committee Stephen M. Kearney Vice President Pricing & Classification.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Growth Initiatives Mailing Services MTAC February 18, 2010.
1 Operations’ Update Fall and Holiday Periods 2002 Mailers Technical Advisory Committee Meeting August 7, 2002.
Product Redesign MTAC Update November 7, Workgroups Joint Meeting of Workgroups –Originally Planning For Early 2003 –Primarily Information Sharing.
PRESORT OPTIMIZATION WORK GROUP November 6, PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe LubenowMarc McCrery Industry USPS.
Maximizing Postage Savings and Delivery for Small-Volume and Local/Regional Periodicals Max Heath, National Newspaper Association Susan Thomas, Mailing.
Recommendation of Texas Test Plan Team to RMS
January 2017 Price Structure Considerations
Jan 2016 Solar Lunar Data.
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
Q1 Jan Feb Mar ENTER TEXT HERE Notes
Periodicals Simplification Ideas February 23, 2017 Key Points

Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
USPS Proposed Pricing Overview
2018/2019 School Calendar July August September October November
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
GOMACTech-04 Technical Program Committee Timeline
Wireless Local Number Portability Timeline - Phase 2
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Exit Capacity Substitution and Revision
2019 Price Change Sharon Owens VP Pricing and Costing.
Price Change 2019 January 2019.
Safety Group Program Timeline
Gas Customer Forum DN Interruption Update - Introduction
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Transmission Workstream DN Interruption Update - Introduction
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Safety Group Program Timeline
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline
Wireless Local Number Portability Timeline - Phase 2
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
2013 Safety Group Advantage Program Timeline
Presentation transcript:

1 Update on Proposed Prices and Standards Mailers’ Technical Advisory Committee Steve Kearney Vice President, Pricing & Classification Joe Moeller Manager, Pricing Sharon Daniel Manager, Mailing Standards John Nagla Manager, Implementation November 2006

2 PRC Recommendation (March 2) Litigation (May through March 2007) May Jun July Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Filing Date (May 3, 2006) 10 Months 1 Year Proposed Standards (September 27) Proposed Standards Comment Period Ends (November 13) Update on Proposed Prices and Standards Timeline and Important Dates Revised Standards (Early January) Interim Final Standards (Early February) Final Standards (Early March) Implementation Decision (Early March) Implementation (May 6) We Are Here

3  57 Interveners  2,962 interrogatories  54 pieces of testimony filed by interveners  Hearings through November 8  Rebuttal testimony due November 20  December: More hearings, and briefs Update on Proposed Prices and Standards The rate case

4 Container Charge 85¢ container charge applies to pallets, sacks, and trays ContainerPays Bundles on palletsPer pallet Trays on palletsPer pallet Sacks on palletsPer sack SacksPer sack TraysPer tray Unsacked carrier route bundles entered at DDUs Per each 5-digit/scheme serviced by DDU Update on Proposed Prices and Standards Periodicals – Outside-County

5 Length 6” min. 15” max. Height 5” min. 12” max. Thickness Min: 0.009” Max: 3/4” Update on Proposed Prices and Standards Flats Automation  AFSM 100 standards with new flexibility criteria  Rigid pieces pay parcel or Not Flat-Machinable prices  Required scheme preparation

6 Update on Proposed Prices and Standards Standard Mail 9 Not Flat-Machinable

7  5-digit, 3-digit, ADC, mixed ADC prices  DDU-entry if sorted to 5-digit/scheme (no minimum)  Follow parcel preparation (no bundles) –Less than 6 oz., nonmachinable preparation –5-digit/scheme, 3-digit, ADC, mxd ADC –6 oz. and over, machinable preparation –5-digit/scheme, BMC, mxd BMC  Optional 5-digit bundles on pallets –5-piece minimum required to qualify for 5-digit price Update on Proposed Prices and Standards Standard Mail

8  Mailpiece review prior to production  One-on-one discussions  Ensures consistent acceptance  52 current participants  Over 600 Rulings last year  Contact: Update on Proposed Prices and Standards National Customer Rulings Greg Hall Manager, National Customer Rulings Pricing and Classification Service Center 90 Church Street, Suite 3100 New York, NY

9  USPS.com/ratecase  DMM Advisory –Subscribe: Update on Proposed Prices and Standards Communicating