Ans Pardons (with input from Jean-Marc Cravero) CERN CNGS Horn Experience (issues since NBI2010) Ans Pardons, CERN 1 NBI2012.

Slides:



Advertisements
Similar presentations
QUALITY AND TECHNOLOGY quality of the. When used in electrical installations where harmonics are present, the application of a conventional capacitor.
Advertisements

QUALITY & TECHNOLOGY HARMONIC PROBLEMS IN CAPACITOR BANKS.
Daikin Altherma™ Troubling Shooting
Now2008 Paola Sala for the CNGS SBWG CNGS status Paola Sala, INFN Milano on behalf of the CNGS Secondary beam working group.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
Week 3 Electrical Circuits and Components. It’s a Radio!
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
AB-PO-PH 2005 Pulsed and High voltage converters Responsibilities: PS complex exploitation, active maintenance (documentation, improvement, spare), follow-up.
Software GPure is a software used to simplify 3D Models generated with Catia. This software is developped by Delta CAD a company based in Paris. This company.
Progress of the BEPCII Injection System Kang Wen.
12 June 2002 J.M.Maugain 1 HORN PROTOTYPE STATUS For the Neutrino Factory J.M.Maugain EP-TA3 For the Horn working group.
Lesson 6 Capacitors and Capacitance
31.March.2004 C. A. Martins, CERN AB/PO 1 Analysis of the possibility of using of a ALICE/LHCb type power converter in TT2A target test by Carlos DE ALMEIDA.
Workshop on Special Compact and Low Consumption Magnet Design
Power Factor Correction Most domestic loads (such as washing machines, air conditioners, and refrigerator) and industrial loads (such as induction motors)
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
MSI-V J. Borburgh, B. Balhan, E. Carlier, J.M. Cravero, B. Goddard, D. Nisbet, P. Van Trappen, F. Velotti.
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
TE-MPE-EE, 16-Apr CLIQ Power supply design J. Mourao TE-MPE-EE.
Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.
Electrical Installation 2
NBI CNGS Horns Status Presented by Sandry Wallon 1 NBI 2003 – KEK, Japan 7-11 nov CNGS Horns : Status 8 nov
Electrical Systems.
17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)
The CNGS Horns Electrical Systems The CNGS Horns Electrical Systems 4th workshop on Neutrino Beams and Instrumentation 7 – 11 November 2003 at KEK Gilles.Maire.
1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns.
Trieste (IT), 20 may 2008POPCA A novel 60 MW Pulsed Power System based on Capacitive Energy Storage for CERN PS machine Jean-Paul BURNET CERN, European.
CERN ISOLDE / HIE ISOLDE 1 Isolde Target Modulator Prototype development prepared by T. Gharsa TE-ABT-EC CERN.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Electrical Discharge Circuit for CNGS Horn & Reflector PH/DT1 Group Meeting, 23 October 2007 Gilles MAIRE PH/DT1-IC Section Leader.
Status of PDS A.Lebedev MIT AMS TIM Meeting, Houston, January 2007.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
Jean-Paul BURNET, AB/PO ATC-ABOC days, 22 January 2007 PS Main Power System: What has been done from June 2006? What will be the situation in 2007? PS.
ESRF PSG safety for equipment and personal related to power converters 2 nd POCPA 15th of June 2010 Jean-François Bouteille.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Power Quality Karsten KAHLE Electric Power Converter Group (TE-EPC) High Power Converter Section Review of CERN’s Electrical Power Network October.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
INTRODUCTION Strain gauge measurement is a point strain measurement method developed in the USA c.a independently by E. Simmons and A. Ruge. It.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 3. CERN proposal -> in order to minimize the CERN overhead in the work.
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
Troubleshooting of PA system
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
POPS: Power for PS A novel 60 MW Pulsed Power System based on Capacitive Energy Storage Jean-Paul Burnet June 2010.
SOLID STATE RELAYS are used to produce reliable signal and to avoid expensive relay replacement.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
Mikhail Ovsienko TE-MPE-EE
Auxiliary power supply (APS) Hossein Harimi 2014
Situation of the Static Var Compensators at CERN.
Lesson 5: Power In Balanced Three-Phase Systems
3AH5 Vacuum Circuit-Breaker For Standard Applications
the CERN Electrical network protection system
BT1 SMV10 Stripline Failure
TE-MSC activities in SPS during YETS
POPS Strategy for Restarting & Repairing
3AH5 Vacuum Circuit-Breaker For Standard Applications
CNGS horn / reflector in 2005: The story of the glass ring insulator
Experimental Areas – LS2 planning
3AH5 Vacuum Circuit-Breaker For Standard Applications
Rebuilding the ON0EME power amplifier
IOT operation in the SPS Long term experience TWC 800 MHz
Presentation transcript:

Ans Pardons (with input from Jean-Marc Cravero) CERN CNGS Horn Experience (issues since NBI2010) Ans Pardons, CERN 1 NBI2012

Outline Introduction –CNGS Horns –Memorable Moments –Electrical Properties –Power Convertor Circuit CNGS horns operation issues –Exit Inductances –Thyristor –Capacitor Banks Summary 2 Ans Pardons, CERN

Introduction: CNGS horns 150/180kA, 0.3Hz avg. (20Hz inst.) Water-cooled Design lifetime: double pulses CERN Gran Sasso 3 Ans Pardons, CERN

Introduction: CNGS horns Ans Pardons, CERN 4 Underground: 150/180kA 7.7kV, 9.4kA (horn) 6.3kV, 5.6kA(refl) Water cooling & Demineralisation (20m) High Voltage cables (1km, 12 per horn) On the surface HORN/REFLECTOR POWER CONVERTORS TRANSFORMERS X16(H) x32 (R)

Introduction: Memorable Moments 5 Ans Pardons, CERN Double pulses

Introduction: Memorable Moments 6 Ans Pardons, CERN 2006: water outlet leak –Badly designed brazed & machined ceramic assembly –All brazed ceramics in horns replaced 2007: broken stripline cable –Insufficiently restrained & brazing-weakened cables –Replaced with restrained & (more) rigid solution of Ag- plated copper plates

Introduction: Electrical Properties Ans Pardons, CERN 7

Converter Circuit Diagram Ans Pardons, CERN 8 1 st 2 nd

Ans Pardons, CERN 9 History –Recuperated from WANF, no documentation at the time –Found later from manu- facturer’s documentation: Under-dimensioned for CNGS –Replaced with new, correctly dimensioned inductances  all OK Failure details Mechanical fatigue  Insulating foil degradation  Short circuit at the exit of the power converters Exit Inductance Failure: mid 2011

10 Thyristor Issues: Mid 2011 Thyristor firing board Inductance For pulse 1 - Pulse 2 Thyristor stack for pulse 1 – pulse 2 At each inductance failure –The output of the converter is in short-circuit, leading to the destruction of the thyristor stacks Additional observation –Sometimes pulse 1&2 fired at the same time due to the EM susceptibility of the thyristor firing board –Problem solved with filter added on the board and additional EM shielding

Capacitor Banks Issue: Early 2012 Ans Pardons, CERN 11 History –New capacitors installed in 2006, 24 capacitor cans per horn –Designed for 20 million pulses at 10kV Performance –During machine stop early 2012, measured capacitance value found to be at ˜50% (horn) and 90% (reflector) of nominal –At this moment, only 10 million pulses and max. 7kV  life time issue

Capacitor Banks Issue: Early 2012 Ans Pardons, CERN 12 Solution –For 1 st half of 2012: 7 spare cans (original design) were installed  horn up to 84%  ok until new –In June 2012: 24 new cans installed in the horn converter (new design from manufacturer) –No degradation observed since Reason for premature wear-??? –Unknown (awaiting tests results from manufacturer)

Summary : Many mechanical issues, lots of repair & re-design work done, many lessons learnt (and in parallel: enhancement of other systems) This seems to have paid off: no mechanical or cooling issues in : Electrical issues found and solved Lessons learnt: –Double check when recuperating existing equipment  Do look the gift horse in the mouth! –Capacitor banks have to be measured on a regular basis to detect life time issues (early). –EM compatibility is always a tricky issue when dealing with kA current pulses Ans Pardons, CERN 13