BATTERY PERFORMANCE METER FOR ELECTRIC PROPULSION SYSTEMS Team Members: Ryan Bickham, Dennis Blosser Cody Dinkins, Todd Dutton, Rachel Shively December.

Slides:



Advertisements
Similar presentations
By: Alex Sowa Electrical Projects April 10 th, 2013.
Advertisements

In this presentation you will:
Mechatronics and microprocessor. Outline Introduction System and design of system Control, measurement and feed back system Open and closed loop system.
Team #2 Solar Car Project Senior Design
ME 388 – Applied Instrumentation Laboratory Temperature Measurement Lab.
Data Acquisition Risanuri Hidayat.
Capacitive Electric Load Leveling Systems Conceptual Design Review November 9, 2004 Erin Davis Fred Jessup Benton O’Neil.
Solar Car Data Collection System Matt Boyden Rene Dupuis Ryan Lavallee 4/23/08.
The Team Formerly Known as NREL 2 Ryan Manning Eric Simley Arvind Talukdar.
A6: Team Rallye Potable Water Still Presented by: Entire Group September 28, 2006 Eric Sabelhaus Nicole Del Rey Mike McConnellTim Rodts.
Multidisciplinary Engineering Senior Design Project Self-Triggered Tempo Meter Preliminary Design Review 02/24/06 Team Members: John Gifford (EE)
CheckMeter 2.3 Portable Working Standard Page 1 March 2009.
ASPPRATECH.
Lecture – 7 Basic input and output
CheckSystem 2.1 Portable Test Systems Page 1 April 2011.
Sensors and Actuators John Errington MSc. Sensors and Actuators Sensors produce a signal in response to a change in their surroundings e.g. Thermostat.
Automated Feeding Solutions for Dog Owners Preliminary Design Review October 19, 2007 Project Automated Dog Feeder Project Advisor Dr. Hongwei Wu The Canine.
Module 3 Eng. Asma Abu Baker. Introduction One of the most important uses of instruments or measuring devices is in the field of process control. If you.
Project 2 Gejing Xu. Electric Generator Electrical generators by definition are devices that convert mechanical energy into electric energy. The mechanical.
Bonitron Air Demand Scheduler Design Review Vanderbilt Senior Design Alex Brown Ajmer Dwivedi Cory Haugh February 04, 2008.
Hybrid Wind & Solar Generation Project
Power Supply Design J.SHANMUGAPRIYAN.
COE4OI5 Engineering Design Chapter 2: UP2/UP3 board.
Settings & Adjustments. Settings & Adjustments.
Jig Saw Dissection By: Shayne Welsh. Jig Saw Objective –How the saw operates from battery to motor This type is also known as a reciprocating saw.
Objectives: EE 465 Measurements Measurement is an important tool for engineers. As a student of engineering, You should learn : what can be measured what.
Module 1: Introduction to PLC
MUEV Phase III By: Kevin Jaris & Nathan Golick. Introduction Petroleum is a finite resource. Demand for clean energy is driving the increase in the production.
To come up with a practicum project that full filled the 411 requirements Create a fun project that would get kids interested in science and engineering.
Shutter Timing and Flash Synchronization System Joel Hoffa Shaun Pontsler November 10, 2005 Advisor: Professor Herr.
Power and Power Measurement ENGR 10 – Intro to Engineering College of Engineering San Jose State University (Ping Hsu and Ken Youssefi) 1 Introduction.
Wind Turbine Simulation (Phase IV)
IV. Implementation system by Hardware Fig.3 Experimental system.
University of Tehran 1 Microprocessor System Design IO Applications Omid Fatemi
Wind Test Plan ●Test individual components, system in different conditions ●Calculate expected power under various conditions Wind block diagram.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
FM CONVERTER. Team Members Dan Harkins Team Leader Beau Blackwell George Henry Shawn Welch Dr. Georgios Lazarou Advisor.
YASKAWA VS-606 V7 COMPACT VECTOR - CONTROLLED INVERTER FOR GENERAL USE 230V (Single-Phase).1Kw ~ 3.7Kw (.13HP ~ 5HP) 230V (Three-Phase).1Kw ~ 7.5Kw (.13HP.
Senior Design II Mid-Semester Presentation. Single Phase Inverter Team Members Team Leader Electrical Engineer Control System Design Power Electronics.
Temperature Signal Simulator Sponsor: Emerson- Kent Burr Advisor- Dr. Semih Aslan Group: NPPH(2.4) Victor Pinones, Taylor Nash, Rey Perez, and Travis Howell.
Path The purpose of this project is to design a universal data recording device to monitor the health of a Dresser-Rand compressor during operation. In.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
Midterm Presentation Senior Design II February 28, 2012.
BATTERY PERFORMANCE METER FOR ELECTRIC PROPULSION SYSTEMS Team Members: Ryan Bickham, Dennis Blosser Cody Dinkins, Todd Dutton, Rachel Shively February.
CheckMeter 2.1 Portable Working Standard Page 1 March 2009.
Thank You Sponsors. Thank You Sponsors Problem Statement Identification of Critical Subsystems Identification of Vehicle States Analysis of Vehicle States.
Plasma Sense Amplifier
Basic Equipment and Schematic Reading. Objectives Learn the basic equipment that will be used in the Lab. Learn some of the basic symbols used on electrical.
Team 2 Electricivic Ben Dannan Mark Snyder Matt Klutzke Mike Mitchell 1.
Preliminary Detailed Design Review Group P16228: Mike, Zach, Joe, Elijah & Bernie.
AMCOM MK66 IAB Presentation Adrian Lauf (Comp.E) Jason Newquist (Mech. E)
Dynamometer Redesign and Build for Future RIT Automotive Laboratory Project Sponsored by: Mechanical Engineering Dept, Dave Hathaway and Mark Steinke.
BATTERY PERFORMANCE METER FOR ELECTRIC PROPULSION SYSTEMS Team Members: Ryan Bickham, Dennis Blosser Cody Dinkins, Todd Dutton, Rachel Shively January.
BLDC Motor Speed Control with RPM Display. Introduction BLDC Motor Speed Control with RPM Display  The main objective of this.
Proportional and Servo Valves
Arduino based Automatic Temperature Controlled Fan Speed Regulator.
Components of Mechatronic Systems AUE 425 Week 2 Kerem ALTUN October 3, 2016.
INTRODUCTION TO ELECTRONIC INSTRUMENTATION
BATTERY PERFORMANCE METER FOR ELECTRIC PROPULSION SYSTEMS
Module 1: Introduction to PLC
Measurements & Instrumentation – Module 3
Solid State Amplifier Development at PSI
BATTERY PERFORMANCE METER FOR ELECTRIC PROPULSION SYSTEMS
BATTERY PERFORMANCE METER FOR ELECTRIC PROPULSION SYSTEMS
BATTERY PERFORMANCE METER FOR ELECTRIC PROPULSION SYSTEMS
DC MOTOR SPEED CONTROL 1. Introduction
Ruggedized Camera Encoder
MSD P15280 RIT HOT WHEELZ TEST BENCH
Introduction to Motor Drives
Presentation transcript:

BATTERY PERFORMANCE METER FOR ELECTRIC PROPULSION SYSTEMS Team Members: Ryan Bickham, Dennis Blosser Cody Dinkins, Todd Dutton, Rachel Shively December 11, 2007 Project Sponsor: Patrick Taylor, Ph.D., AMRDEC

Operational Concept Characterize UAV electrical propulsion systems –Battery pack and electric motor –Simulate load conditions during a typical mission –Characterize voltage and current to predict amount of time left in battery pack Wind tunnel testing –Determine power needed for various mission conditions –Simulate conditions like banking, climbing, and diving

Battery Monitor Features and Applications Requirements NumberRequirementSpec 1.1Physical Outer enclosure dimensions: The monitor should be of minimum size allowable to retain ease of adjustment Not yet defined 1.2Electrical 1.2.1Operating voltage: The battery monitor shall operate on a voltage of12 V - 36 V 1.2.2Operating current: The battery monitor should draw less than1.5 A 1.3Battery Source 1.3.1Battery type: The battery monitor shall monitor a battery of the typeLi-Ion Battery capacity: The battery monitor shall monitor a battery of capacity 2000 Ah Ah Battery Monitor System Requirements

1.4Output / Feedback Parameters Voltage level: The battery monitor shall report battery voltage to precision of0.01 V Current level: The battery monitor shall report current drawn from the battery to precision of0.01 A Remaining battery capacity: The battery monitor shall report remaining battery capacity to precision of 0.01 Ah or 0.1 Ah Elapsed mission time: The battery monitor shall report the elapsed time to a precision of0.1 s 1.5Interface 1.5.1Display: The battery monitor shall report parameters by LCD, PC Monitor Control: If using an LCD, the battery monitor shall report parameters chosen by the user's input by a keypad Battery Monitor System Requirements

Mechanical System Requirements Dyno & Mechanical Instrumentation Requirements NumberRequirementSpec 2.1Coupler The coupler shall transmit power between motor and dynamometer with no slippage 2.1.2The coupler shall be structurally sound and durable The coupler shall fit the physical limitations of the motormount / motor / dyno systemNot yet defined 2.2Motor Mount The motor mount must be easily used and adjustable in 6 directions: 3 rotational, 3 translational The motor mount shall fit within the physical constraints of the table and mount to the provided mounting holesNot yet defined The motor mount shall hold the motor stationary and in alignment without slippage

Mechanical System Requirements 2.3Shield The shield must prevent shards of a shattering coupler from harming nearby people 2.3.2The shield must be able to absorb energy on order of approx.50 J 2.4Cooling System The cooling system shall maintain the dynamometer at optimal operation temperature of °C The cooling water shall meet the physical requirements of the dyno heat exchanger

System Diagram – 3 Part

1) Device Under Test Motor –Connected to Dyno by means of coupler Battery –Outputs voltage and current to instrumentation

2) Dynamometer Coupler Water In/Out TSC 401 Conditioner –Torque –Speed DES 310 Power Supply –Excitation TSC 401 Conditioner

3) Instrumentation Battery Monitor –Voltage and current DSP6001 Controller –Torque, speed, and excitation Thermocouples –Monitor water temperature PC –RS 232 from controller DSP6001 Controller

BatteryMotor Battery Monitor Coupler Dynamometer DES 301 P/S TS 401 Signal Conditioner DSP6001 Controller PC InOut Thermocouples RS 232 ExcitationTorque Speed Voltage Current Device Under Test Dynamometer Instrumentation System Diagram – Expanded

RECENT DEVELOPMENTS Mechanical: Cooling system effectively analyzed and planned: Water quality & pressure information obtained and studied Determined components for procurement Electrical: Made preliminary decision of FPGA for order Outlined other components required for project D/A Converter Misc. circuitry for signal scaling

Water Cooling System Water Quality –All requirements are met, including hardness, pH, and iron –Still researching other parameters Pressure –Max input pressure must not exceed 2 bar –Standard faucet pressure ranges from 60 – 80 psi (4.14 – 5.52 bar) –Pressure regulator needs to be purchased

Cooling System, Continued Procurement –902H25 Standard 25 PSI Regulator –Thermocouples, K-type –Clear plastic hose –Hose clamps –Pipe fittings, ¾”NPT, 5/8” swagelok with 1/8” T junction for thermocouple

Altera Nios II Development Kit, Cyclone II ed. Cost: $995 + additional fees Key Features of Included Components - Nios II Embedded Processor Suitable for a wide range of apps w/o sacrificing performance - Cyclone II 33k Logic Elements 475 I/O pins - Quartus II Software Package Pin Assigner Incremental Design FPGA Development/Evaluation Kit

NEXT STEPS Mechanical: Design cooling system Receive motor from AMRDEC Electrical: Audit FPGA design course (MWF 10:10 – 11:00 AM) Begin base design of FPGA Learn Quartus II Development Software Thoroughly investigate Li-ion batteries