Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.

Slides:



Advertisements
Similar presentations
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
Advertisements

The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
27 Feb 2012 Erwin Siesling 1 TSR Max Planck Institute Heidelberg Hie-Isolde LOI endored Jan 2011 TDR submitted Jan.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team 49th INTC Meeting CERN, 11 February 2015.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
PH Dept News Long shutdown 1: Baseline Project Project Leader Freddy Bordry Injector shutdown Dec 2012-Mar 2014 means 1 year stop for ISOLDE Physics LS2.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Report from the HEBT working group + Commissioning plan and Schedule 5th HIE-ISOLDE Physics Coordination Group Meeting D. Voulot on behalf of HEBT and.
Update on the Laser Beam Line
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team HIE-ISOLDE Physics Coordination WG Meeting CERN, 16 February 2015.
Report from HIE-ISOLDE HEBT WG J.Bauche‎, P.Farantatos‎, M.Fraser‎, B.Goddard, Y.Kadi‎, D.Lanaia‎, D.Nisbet‎, E.Siesling‎, G.Vandoni‎, D.Voulot‎, E.Zografos.
2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva,
Maria J. G. Borge Beam Lines for HIE-ISOLDE. Status of HIE-ISOLDE 2 May 2010: 34 LoI submitted 1 Nov 2012: INTC endorsed the increase of 2 GeV-proton.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
HIE-ISOLDE Project Status Report 52nd ISOLDE & nTOF Technical Committee meeting February 3rd 2016 Y. Kadi On behalf of the HIE-ISOLDE Project Team.
HIE-ISOLDE Project Status Report: Planning of Phase II 74th ISOLDE Collaboration Committee meeting November 10th 2015 Y. Kadi.
Maria J. G. Borge 10th November 2015 News of the Group Courtesy of M. Huyse on behalf of IS557.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
Richard Catherall EN-STI CERN, 3 rd November 2011 ISOLDE Technical Report for the INTC.
Duy Phan, EN-STI-RBS. Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns.
Richard Catherall EN-STI CERN, 3 rd November 2011 ISOLDE Technical Report for the ISCC.
ISOLDE & HIE ISOLDE Status and Plans Richard Catherall EN-STI ISOLDE Technical Coordinator IEFC Workshop 7 th – 9 th March 2012.
HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor.
Plans and schedule for the Long Shutdown LS1 Hie Isolde Physics Coordination Group CERN, 1 March 2012 Hie-Isolde Erwin Siesling.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
HIE-ISOLDE Status Report Yacine Kadi on behalf of HIE-ISOLDE project team ISOLDE Annual Workshop, 5 December 2011.
Installation at Isolde (and costs) TSR at Isolde workshop CERN, 29/30 October 2012 Isolde Erwin Siesling.
Status and Future Perspective of the HIE-ISOLDE Project CERN, November 19-20, 2012
Beam Dynamics Studies of the HIE-ISOLDE Superconducting LINAC at CERN
Framework Schedule from EYETS 2016 to LS2
Workshop, 10/2012 “The Project”
Status HIE ISOLDE installation and shutdown work
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Status of Cryogenics Facilities Design
YETS Dec 2017 – March 2018 LS Experiments requirements / Services (un)availability F.Butin / EN-EA EACM meetings outcome, thanks to all participants.
HIE-ISOLDE Project Status Report
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
13-block rotation schedule
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
PH Dept News Long shutdown 1: Baseline Project
Report on HIE-ISOLDE Status
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
CERN-ISCC Meeting “Storage Ring Facility at HIE-ISOLDE”
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
66th ISOLDE Collaboration Committee meeting
HIE-ISOLDE contribution packages
Ciprian Plostinar Workshop on Testing and Commissioning
Beam Transfer Line Stage 1:
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Accelerator Installation Schedule
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 2 Abstract Hie-Isolde – Impact on the facility Work during and around LS1 –Until LS1: Civil Engineering, Main Services –During LS1: Civil Engineering (tunnel in hall), Main Services, Cryogenics, Beam transfer Line –End of LS1 and into the 2014 run: Cryogenics, Beam transfer Line, Cryo Modules, commissioning –Possible other LS1 activities..

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 3 Isolde changes

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 4 Hie-Isolde Planning Hie-Isolde installation planning in EDMS: Projects – Accelerators - Hie-Isolde – Infrastructure & Integration - Planning :V0/P:CERN :V0/TAB3

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 5 Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q Civil Main services Cryo CM 1&2 CM 3&4 5.5MeV/u 10MeV/u Beam Transfer Line CM 5&6 Hie-Isolde Planning Activities until LS1: Civil Engineering & Main Services Dec Apr 2014 sd CM1&2 Isolde & REX Ops shutdown LS1 Cryo Mod 1 & 2 install (Isolde normal operations) (REX perturbations) Timeline: sd Ventilation Demi water Electrical syst.s Start LS1 3 dec 2012

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 6 Until LS1 GS/SE: DANIEL PARCHET, ELISEO PEREZ-DUENAS LS1 Civil Engineering

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 7 Civil Engineering Construction starting date: Aug 2011

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 8 Civil Engineering Removal of the transport hangar September 2011

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 9 Civil Engineering Cutting the Hall 170 wall & Terrain flattening October 2011

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 10 Civil Engineering New SAS January 2012

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 11 Access 2012 run Move of the controlled access Shutdown, February 2012

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 12 Civil Engineering Compressor Building B.198 Start February 2012

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 13 Civil Engineering Cold Box Building B.199 Civil Engineering finished July 2012

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 14 Main Services Electrical systems, Cooling & Ventilation Start installation Main Services July 2012

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 15 Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q Civil Main services Cryo Beam Transfer Line Hie-Isolde versus LS1 Dec Apr 2014 sd CM1&2 Isolde & REX Ops shutdown LS1 Cryo Mod 1 & 2 install (Isolde normal operations) (REX perturbations) Timeline: sd Main services Winter physics Jan-March 2013 ? Ventilation Cooling water Electrical syst.s (dismantling + installation works) Start LS1 3 dec 2012 End LS1:Start Low E physics apr 2014 CM 1&2 Activities during LS1: Civil Engineering (tunnel in hall), Main Services, Cryogenics, Beam transfer Line CM 3&4 5.5MeV/u 10MeV/u CM 5&6

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 16 Into LS1 EN/EL: RENE NECCA LS1 Electrical systems

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 17 Electrical systems Electrical systems: July 2012 – June 2013

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 18 Cooling & Ventilation EN/CV: PAUL PEPINSTER, BENOIT LACARELLE LS1 Start of LS1: 3 dec - Keydate!

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 19 Cooling & Ventilation EN/CV: PAUL PEPINSTER, BENOIT LACARELLE LS1 Point of No Return!

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 20 Cooling & Ventilation Cooling & Ventilation: July 2012 – June 2013

Around LS1, SGUI 2 Feb 2012 Erwin Siesling Ventil units 21 Cooling & Ventilation Cooling & Ventilation: July 2012 – June 2013

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 22 Cooling & Ventilation Ventilation unit Cooling units Cooling & Ventilation: July 2012 – June 2013

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 23 Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q Civil Main services Cryo CM 1&2 CM 3&4 5.5MeV/u 10MeV/u Beam Transfer Line CM 5&6 LS1 and 2014 run Dec Apr 2014 sd CM1&2 Isolde & REX Ops shutdown LS1 Cryo Mod 1 & 2 install (Isolde normal operations) (REX perturbations) Timeline: sd Ventilation Demi water Electrical syst.s Activities LS1 into 2014 run: Cryogenics, Beam transfer Line, Cryo Modules, commissioning End LS1:Start Low E physics apr 2014

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 24 Cryogenics TE/CRG: NICOLAS DELRUELLE, JOS METSELAAR LS1 CM1&2 LS1 and 2014 run

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 25 Cryogenics Compressors: July 2013 – December 2013 Cold Box: Jan 2014 – June 2014

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 26 Tunnel and Cryo Line Cutting walls & install tunnel: Sep 2013 LS1 Cryo Cold Line: January 2014 – June 2014

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 27 Modular installation Superconducting Linac

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 28 Modular installation Courtesy: Matteo Pasini, Matthew Fraser Schematic:

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 29 Superconducting Linac TE/MSC: JEAN-PHILIPE TOCK, YANN LECLERCQ, ARNAUD BOUZOUD LS1 Cavity and CM development and tests: Isolde facility not affected

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 30 Superconducting Linac LS1 TE/MSC: JEAN-PHILIPE TOCK, YANN LECLERCQ, ARNAUD BOUZOUD CM1&2

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 31 Hie-Isolde SC Linac First 10MeV/u by March 2016 Hie-Isolde SC Linac: Bunched beam by 2017 ? 5.5MeV/u by the autumn of 2014

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 32 Beam Transfer Line

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 33 Beam Transfer Line EN/HDO: YACINE KADI, TE/EPC: DAVID NISBET, TE/MSC: JEREMY BAUCHE, TE/ABT: BRENNAN GODDARD, BE/OP: DIDIER VOULOT LS1 CM1&2

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 34 Straight line with 2 branches – Oct Sept 2014 Miniball move: Oct 2013 – April 2014 Miniball Actar / Helios Beam diagnostics Exp. station Miniball Beam Transfer Line Stage 1

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 35 The bend Miniball Actar / Helios TSR Spectrometer Exp. station 2nd Miniball move and Spectrometer installation TSR and beyond.. Stage 3: Beam Transfer Line Stage 2 Stage 3

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 36 TSR Max Planck Institute Heidelberg Possible LS1 activities Hie-Isolde LOI endored Jan 2011 TDR submitted Jan 2012 (K. Blaum, Y. Litvinov)

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 37 Proposed layout to fit the TSR: Installation above the CERN service-tunnel Tilted beamline coming up from the machine. Cost study: Eliseo Perez-Duenas GS/SE 24.6m23.3m 3m3m Hie-Isolde Jura (west) side

Around LS1, SGUI 2 Feb 2012 Erwin Siesling Increasing the surface of the Solid State Lab in building B.115: For RP safety reasons all solid state activities will be moved from B.275 to B.115 This will suppress the existing workshop in B.115 and courtyard between B.115 and B Replace the existing building 507 by a new building / modular cabins: Ground floor (only accessible from within the surveyed area): - Labs and workshop First floor (accessible from outside the surveyed area): - Data Acquisition rooms - Meeting room/Visitors Center Cost study: Eliseo Perez-Duenas GS/SE under discussion User Facilities

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 39 Present situation : - ground floor Control room User Facilities

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 40 Replace building 507 Control room Possible future situation: - first floor 507 accessible from outside the surveyed area):

Around LS1, SGUI 2 Feb 2012 Erwin Siesling 41 Acknowledgement GS/SE: DANIEL PARCHET, ELISEO PEREZ-DUENAS, NATASHA LOPEZ-HERNANDEZ EN/MEF: STEPHANE MARIDOR BE/ABP: FREDERIK WENANDER BE/OP: DIDIER VOULOT PH/SME: YORICK BLUMENFELD EN/HDO: YACINE KADI BE/RF: MATTEO PASINI, MATTHEW FRASER EN/CV: PAUL PEPINSTER, BENOIT LACARELLE EN/EL: RENE NECCA TE/CRG: NICOLAS DELRUELLE, JOS METSELAAR EN/STI: RICHARD CATHERALL, ANA-PAULA BERNARDES GS/DI: CYRILLE BEDEL TE/MSC: JEAN-PHILIPE TOCK, YANN LECLERCQ, ARNAUD BOUZOUD