Www.see-grid-sci.eu SEE-GRID-SCI NA4 Progress PSC07 Zabljak, 22-23 February 2010 The SEE-GRID-SCI initiative is co-funded by the European Commission under.

Slides:



Advertisements
Similar presentations
Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
Advertisements

Polish Infrastructure for Supporting Computational Science in the European Research Space EUROPEAN UNION Services and Operations in Polish NGI M. Radecki,
KM3NeT, , Pylos © FIM-NewLearning 2007 KM3NeT Management & Reporting Dr. Roland Klein Project Office KM3NeT
Updated e-IRG recommendations Motivation and status.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
08/11/908 WP2 e-NMR Grid deployment and operations Technical Review in Brussels, 8 th of December 2008 Marco Verlato.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
1 Framework Programme 7 Guide for Applicants
EGI: A European Distributed Computing Infrastructure Steven Newhouse Interim EGI.eu Director.
SEE-GRID-SCI Miklos Kozlovszky SZTAKI NA3 – Dissemination and Training PSC06 Meeting, Istanbul, December 7-8,
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
SEE-GRID-SCI Regional Grid Infrastructure: Resource for e-Science Regional eInfrastructure development and results IT’10, Zabljak,
SEE-GRID-SCI SEE-GRID-SCI Operations Procedures and Tools Antun Balaz Institute of Physics Belgrade, Serbia The SEE-GRID-SCI.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
SEE-GRID-SCI Ognjen Prnjat, Project Coordinator Anna Loukakou, Project Financial Administration GRNET NA1: Project Administrative and.
INFSO-RI Enabling Grids for E-sciencE EGEE and Industry Bob Jones EGEE-II Project Director Final EGEE Review CERN, May 2006.
SEE-GRID-SCI Ognjen Prnjat, Project Coordinator GRNET NA1: Project Administrative and Technical Management PSC07 Meeting, Zabljak,
EU BON Meeting, Joensuu, March 2015 WP2 Task 2.3: Data sharing tools – Action Point MS232 : Technical workshop, review of documents, test versions of data.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
EGEE is a project funded by the European Union under contract IST User support in EGEE Alistair Mills Torsten Antoni EGEE-3 Conference 20 April.
SEE-GRID-SCI Miklos Kozlovszky NA3 Leader SZTAKI NA3 – Dissemination and Training Overview and achievements.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
SEE-GRID-SCI Seismo VO Planning The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures.
SEE-GRID-SCI The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures contract no.
SEE-GRID-SCI Seismology VO The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
Initial Operating Capability Task Force (IOCTF) Status Briefing September 21, 2008.
INFSOM-RI WP NA2 Dissemination, Training and Certification Isabel Matranga Engineering Ingegneria Informatica S.p.A. ETICS 2 Kick.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
Enabling Grids for E-sciencE EGEE Applications Registry Current status & latest developments Marios Chatziangelou.
SEE-GRID-SCI NA1-Technical Execution Plan Overview Open of PSC-03 Bucharest Ioannis Liabotis Greece GRNET iliaboti grnetSPAMFREE.gr.
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
EGEE is a project funded by the European Union under contract IST Generic Applications in EGEE-NA4 Roberto Barbera NA4 Generic Applications.
The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures contract no Workflow repository, user.
SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
INFSO-RI Enabling Grids for E-sciencE Quality Assurance Gabriel Zaquine - JRA2 Activity Manager - CS SI EGEE Final EU Review
SEE-GRID-SCI NA4 Progress PSC05, Dubrovnik, 9-11 September 2009 Cevat Şener Dept. of Computer Engineering, Middle East Technical.
Enabling Grids for E-sciencE EGEE Applications Registry Current status & latest developments Marios Chatziangelou.
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
SEE-GRID-SCI Meteo-VO: Overview The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures.
SEE-GRID-SCI NA4 Progress PSC06 Istanbul, 7-8 December 2009 The SEE-GRID-SCI initiative is co-funded by the European Commission under.
SEE-GRID-SCI Branko Marovic University of Belgrade JRA1 progress PSC05 Meeting, Dubrovnik, 8-11 September 2009.
1 st EGI CMMST VT meeting 19 February 2013 A. Laganà (UNIPG, Italy)
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
Resource Provisioning EGI_DS WP3 consolidation workshop, CERN Fotis Karayannis, GRNET.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
SEE-GRID-SCI Grid Operations Procedures Antun Balaz Institute of Physics Belgrade Serbia The SEE-GRID-SCI initiative.
EGEE is a project funded by the European Union under contract IST Aims and organization of the Biomedical VO Yannick Legré CNRS/IN2P3 NA4/SA1.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
Co-ordination & Harmonisation of Advanced e-Infrastructures Research Infrastructures – Grant Agreement n CHAIN sustainability guidelines Dr. Ognjen.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE Applications Database Past, Present.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI MPI VT report OMB Meeting 28 th February 2012.
How to integrate portals with EGI accounting system R.Graciani EGI TF 2012.
Transition to EGI PSC-06 Istanbul Ioannis Liabotis Greece GRNET
Bob Jones EGEE Technical Director
Regional Operations Centres Core infrastructure Centres
NA5: Policy and International Cooperation
JRA3 Introduction Åke Edlund EGEE Security Head
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
Action U-E-5 Technical Coordination – User Technical Support
Connecting the European Grid Infrastructure to Research Communities
Benefits and vision for the VRC community model
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Presentation transcript:

SEE-GRID-SCI NA4 Progress PSC07 Zabljak, February 2010 The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures contract no Cevat Sener Dept. of Computer Engineering METU, Ankara

SEE-GRID-SCI PSC07, Zabljak, February ■ NA4.1 Study the Grid applications ■ NA4.2 Adapt Grid applications ■ NA4.3 Support the deployed applications ■ NA4.4 Assess applications Grid usage and take-up Activities

SEE-GRID-SCI PSC07, Zabljak, February ■ DNA4.1 Target applications analysis ■ DNA4.2 Application deployment and support ■ DNA4.3 Porting guidelines for target scientific fields ■ DNA4.4 User community engagement and applications assessment Deliverables

SEE-GRID-SCI PSC07, Zabljak, February ■ MNA4.1 Regional applications analysed[PM04] ■ Means of verification: DNA4.1 Target applications analysis ■ MNA4.2 Three core user groups’ applications running on the regional Grid[PM24] ■ Means of verification: DNA4.4 User community engagement and applications assessment + Demonstration at review Milestones

SEE-GRID-SCI PSC07, Zabljak, February “In the second year of the project, the partners will need to place more emphasis on dissemination of the scientific outputs from the project. Deliverable NA4.4 due in M24, User Community Engagement and Applications Assessment, should signpost: the new science / new capabilities developed by the project; how the scientific state of the art has been advanced by the project; how the grid has helped advance the science base. In addition, it will be important to point to scientific papers produced by the project that have appeared in refereed conferences/journals outside the grid community in the scientific field of interest.” Review Recommendations

SEE-GRID-SCI PSC07, Zabljak, February ■ Almost all in “Deployed in Production” ! ■ Extension to GreenView: EnviMon from MD – Also “Deployed in Production” ■ CHERS – in “Developed Grid-mode” – almost ready for “Testing Grid-mode” ■ ROMS – in “Testing Grid-mode” Gridification Status

SEE-GRID-SCI PSC07, Zabljak, February ■ All applications are supposed to have a web page or a wiki section – In case of a web page, there should be a link from the wiki ■ These, especially, should make improvements asap: ■ MCSAES, CHERS, MSACM, MSERRHSA, CCIAQ, ROMS, ■ GreenView (missing info on EnviMon), ■ Lizza-PAKP (link broken on the wiki) – But, all need to consider the check-list for the content: ■ Scientific model implemented ■ User documentation*: guide, licensing info,... ■ Description of JRA1 AS/OT usage * Suggested to use the format given in “ User Documentation” of “Deliverable JRA1.3 – Application services design report” Web Pages / Wiki Sections

SEE-GRID-SCI PSC07, Zabljak, February ■ Scientific publications (incl. submissions) within PY2 ■ CHERS: 1+1, GreenView: 10+0, Lizza-PAKP:1+0, ROMS:0+1, BG Apps:10+2 => Total for Envo: 22+4 ■ WRF-ARW: 3+1, REFS: 4+0 => Total for Meteo: 7+1 ■ ELF: 1+0, FPS:1+1, SDS: 3+1, SRA: 1+3, MDSSP-WA: 1+1, NMMC3D: 2+1 => Total for Seismo: 9+7 ■ a+b means 'published/just submitted' + 'near-future plan' – More emphasis should be given to publications! ■ List of scientific events & journals to be announced (and then kept updated) by VOs in order to guide members ■ Achieved only by Seismo VO, so far, at Application Dissemination

SEE-GRID-SCI PSC07, Zabljak, February ■ VOMS groups are ready for all applications ■ Some collaborators still not registered, eg., ■ Ljupco Jordanovski to MDSSP-WA ■ BG partners to SRA ■ ME and GE partners to REFS ■ Application developers should check if all collaborators are registered to the applications' VOMS groups; ■ When such exists, VOMS admin should be contacted ■ Note: Regional collaborators in ROMS ! Application Accounting Collaborators in VOMS Groups

SEE-GRID-SCI PSC07, Zabljak, February Application Accounting Number of Jobs – See the file Accounting_ xls –

SEE-GRID-SCI PSC07, Zabljak, February Application Accounting Base CPU Time – See the file Accounting_ xls –

SEE-GRID-SCI PSC07, Zabljak, February ■ Other applications not seen on the output ■ Differences between VO totals of per-application accounting and per-VO accounting numbers? ■ Some sites not publishing the accounting data have been identified – Could any other such site exist? ■ All zero: CHERS, ROMS, SDA ■ WRF-ARW + WRF-ARW/Role=developer ? Application Accounting

SEE-GRID-SCI PSC07, Zabljak, February ■ All are met for all Vos ■ Number of applications deployed ■ Number of users ■ Number of countries involved ■ Number of research groups involved ■ Except ■ Number of users for Meteo VO ■ Expected: 35, Now: 30 PM24 Metrics

SEE-GRID-SCI PSC07, Zabljak, February ■ GENESI-DR works on defining and developing data policies and tools to support the data and service access. ■ There are two tendencies among partners GENESI-DR partners on data policy: ■ To make public the spatial data, especially for EC projects, education and research (e.g. GMES, GEO) ■ To make data private and to require particular license (e.g. RapidEye, JRC – by individual contract) ■ Combination of the first two solution (e.g. ESA) GENESI-DR Interaction Background

SEE-GRID-SCI PSC07, Zabljak, February ■ SEE-GRID-SCI uses just the public data and services provided by GENESI-DR, available as batch files. ■ SEE-GRID-SCI continues to make experiments on functional development and performance evaluation of tools and services considering data availability, format, dimension, location, etc. ■ GENESI-DR does not provide yet data we require in production. ■ SEE-GRID-SCI has made a proposal to GENESI-DR to develop and provide a set of pilot data repositories to be available for the development of the SEE-GRID-SCI applications. ■ The pilot repositories are resident on the sites of GENESI-DR data providers. ■ Data could be accessed through secured ways and policy (i.e. certificates to access Portal and distributed repositories), as any other production data. GENESI-DR Interaction Status

SEE-GRID-SCI PSC07, Zabljak, February ■ Gridification Guideline updates (reflecting the information contained in DNA4.3) should be completed by the relevant contributors of DNA4.3 by 15 March ■ To be guided/followed by Davor. DNA4.3 and

SEE-GRID-SCI PSC07, Zabljak, February ■ Taken from “ ■ EGEE Regional Support Applications Registry ■ This registry is the central point for gathering and providing information about the scientific applications deployed in EGEE, exploiting the project's international Grid infrastructure. ■ If you are interested in adding your application in the Regional Applications Database, please contact the team responsible for your region: EGEE APPDB

SEE-GRID-SCI PSC07, Zabljak, February ■ Task NA4.4 - “Assess of the application and takeup” ■ Assesses and quantifies the applications usage of the infrastructure, and application take-up in the community, ■ Finish with the deliverable DNA4.4 [PM24] ■ Leader: RBI ■ Working plan: ■ Accounting, for every application – the number of jobs, total CPU time, based time, ■ Per country application accounting (at least for the countries that are involved in the application development) - CPU time, based time, number of jobs, ■ Per country engagement – number of jobs, CPU based time, CPU time ■ Total application usage per VO (summary of the application accounting) ■ Raw accounting data could be very useful! NA4.4

SEE-GRID-SCI PSC07, Zabljak, February ■ DNA4.4 – “User community engagement and application assessment” [PM24] ■ Final and overall assessment of the involvement of the end-user community and application usage and take-up in the project ■ Editor: RBI ■ What is to be reported? ■ Application aims and benefits – description of the VOs (env,meteo,seismo), social and scientific benefits per VO, social benefits ■ Summary of user community involvment – number of users, country distribution, number of user per VO, ■ Summary of international collaboration – other project with MoU, VOs, national VOs and other user groups, user community established between the project partners DNA4.4

SEE-GRID-SCI PSC07, Zabljak, February ■ Proposed structure for application assessment, per VO, per application ■ Application ■ Short description ■ Usage scenario ■ New scientific results – new capabilities developed within the project, scientific stat of the art advances, how the grid has helped advance the science base ■ Scientific/social impact of the application (?) ■ Overall user community and end-user involvement ■ Application status on the grid ■ Resource & requirements ■ Developed by / Collaborations DNA4.4 (2)

SEE-GRID-SCI PSC07, Zabljak, February ■ Analyzing the usage of the SEE-GRID infrastructure ■ Analysis per scientific field – number of jobs, CPU time, based time ■ Analysis per application ■ Infrastructure usage by the applications ■ Analysis per country engagement ■ Summary of infrastructure requirements DNA4.4 (3)

SEE-GRID-SCI PSC07, Zabljak, February ■ Existing APs on the followings are still valid with updates: ■ Scientific (most preferably, refereed) publications ■ Extended papers from UF to ESI – deadline 28 Feb'10 ■ ISTGW submissions ■ User community enlargement ■ Collaborations with other researchers, projects, applications ■ Use of VOMS roles ■ Registering collaborators to application's VOMS group ■ List of scientific events and journals by VOs ■ Web pages / Wiki sections with (i) Scientific model implemented, (ii) User documentation*, (iii) Description of JRA1 AS/OT usage *: for the user documentation, the format given in “ User Documentation” of DJRA1.3 is highly suggested ■ Updating Gridification Guide at wiki till – to be followed by Davor Action

SEE-GRID-SCI PSC07, Zabljak, February ■ New APs: ■ Meteo VO to note: (i) PM24 metric 'number of users' not met yet and (ii) REFS accounting + WRF-ARW accounting << Meteo VO accounting ■ CHERS and ROMS to be deployed in production asap ■ Lizza PAKP and NMMC3D to investigate the accounting issues ■ BBmSAM to start submitting tests with Envo VO credentials – towards end of project ■ Complete the gridification of EnviMon and its integration with GreenView (incl. info on the web/wiki) ■ MDSSP-WA to have the final version for production ■ SRA application will work on getting input data from other countries like MK, MD, BG. ■ SDSAS source version control by C.Ozturan ■ Format of the AL earthquake data to be corrected Action

SEE-GRID-SCI PSC07, Zabljak, February ■ New APs (cnt'd): ■ ToC for DNA4.4 is to be finalized and contributions to the deliverable to be collected by Davor. Need to cover both the technical and scientific points of view. ■ Developers consider adding their applications to EGEE APPDB at “ ■ SEE-GRID-SCI logo to put on the applications' web pages ■ Classification of NA4 publications as Grid and non-Grid Action