Massachusetts Institute of Technology Kavli Institute for Astrophysics and Space Research 5 December 2011MWA PE Status The First Three Phases of 128T Bob.

Slides:



Advertisements
Similar presentations
Agenda Benefits of Campus LAN Other Benefits Survey Prerequisities
Advertisements

Connecticut Education Network February 4, 2004 Statenets CEN Project Update Robert P. Vietzke, Network Architect & Program Director.
WIYN Planning Meeting, February 28, 2013 Wisconsin, Indiana Yale, NOAO 0.9m Half Degree Imager – First Light.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments.
CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE Copyright ©2013 EuroGeographics UN-GGIM Europe 12 June.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
What is Cloud Computing? o Cloud computing:- is a style of computing in which dynamically scalable and often virtualized resources are provided as a service.
LIGO-G W LIGO Hanford Observatory Manpower Frederick J. Raab, LIGO Hanford Observatory.
MWA Project:. Site: Murchison Radio Observatory Australia’s proposed SKA Site Strategy: 512 Antenna “Tiles” Explore “Large N / Small D” regime Correlate.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
LIGO- GXXXXXX-XX-X Advanced LIGO Data & Computing Material for the breakout session NSF review of the Advanced LIGO proposal Albert Lazzarini Caltech,
WorldFIP optical repeaters 1 | status Feb 2013: 66 repeaters ordered to HLP; never delivered Feb 2014: HLP announced eminent closure Jun 2014: 40 of the.
IT Broadband Connectivity Infrastructure Projects Projects Status.
Active Security Infrastructure Stuart Kenny Trinity College Dublin.
Jim UlvestadEVLA Mid-Project Review May 11-12, EVLA Operations Jim Ulvestad Array Science Center Concept (Requirements) Staffing and Cost Plans.
An Automated Component-Based Performance Experiment and Modeling Environment Van Bui, Boyana Norris, Lois Curfman McInnes, and Li Li Argonne National Laboratory,
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
IMPRS June Space Research, in praxis, illustrated by a ground-based example The „Ozonometer“ as a student project.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
MCCS Status Update SOFIA SITR Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.
Managed by UT-Battelle for the Department of Energy 1 Integrated Catalogue (ICAT) Auto Update System Presented by Jessica Feng Research Alliance in Math.
New Data Center Update Brian Shannon & Anne Silvester.
Southeastern Universities Research Association SURA is comprised of 53 colleges & universities from 15 states and the District of ColumbiaSURA is comprised.
Nlr.net © 2004 National LambdaRail, Inc 1 NLR Update Dave Reese Joint Techs February 2007.
Campus Cyberinfrastructure – Network Infrastructure and Engineering (CC-NIE) Kevin Thompson NSF Office of CyberInfrastructure April 25, 2012.
Technical Policy and Standards Andy Gorton – Senior Architect: Institutional Networks.
Focus on 128T Steven Tingay. Where are we? Prior to NSF proposal review, I prepared a contingency plan in Australia - use Australian-only (and Indian,
Trust, Innovation and Performance We are guided by our values, aligning all our people towards a common goal:
Project Manager Reports Ron Remillard (MIT) & Tom Booler (Curtin, Aurecon) MWA Project Meeting December 5, 2011.
MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.
Mileura Widefield Array – Low Frequency Demonstrator MHz * Currently in “Early Deployment” phase Goal: HI at redshift 6 to 17.
Jeju Island 2009 = Jeju island demo 2013 = smart city deployment 2020 = Metropolitan Area Deployment 2030 = Nationwide Deployment.
THE MURCHISON WIDEFIELD ARRAY: FROM COMMISSIONING TO OBSERVING D. Oberoi 1,2, I. H. Cairns 3, L. D. Matthews 2 and L. Benkevitch 2 on behalf of the MWA.
Seeing © 2014 Project Lead The Way, Inc.Computer Science and Software Engineering.
IACC-ITS.PPT June 1, 2001 Computer Lab Operations Dan Inlow IACC-ITS Joint Meeting June 1, 2001.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. In most cases, the information.
Centre of Excellence for All-sky Astrophysics MWA Project: Centre of Excellence for All-sky Astrophysics Centre of Excellence for All-sky.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
CERN - IT Department CH-1211 Genève 23 Switzerland t High Availability Databases based on Oracle 10g RAC on Linux WLCG Tier2 Tutorials, CERN,
Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Internet2 Applications Group: Renater Group Presentation T. Charles Yun Internet2 Program Manager, Applications Group 30 October 2001.
UI SE CE WN A metropolitan Area Grid A metropolitan Area Grid C. Vuerli ( 1,2 ), R. Pugliese ( 3 ), F. Liello ( 4 ), F. Pasian.
AFRENA (Afghanistan Research and Educational Network Association) Presenter: Mohammad Tariq “Meeran” Assistant Professor Computer Science Department Kabul.
Implementation Review1 Archive Ingest Redesign March 14, 2003.
Entering the Broadband Business. Owensboro Is located in Western Kentucky. Is located in Western Kentucky. 54,000 Citizens. 54,000 Citizens. Is on the.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
The Internet2 Network and LHC Rick Summerhill Director Network Research, Architecture, and Technologies Internet2 Given by Rich Carlson LHC Meeting 25.
Project Manager’s Report MWA Canberra Meeting January 2009 Prof. Steven Tingay Curtin University of Technology 19 January 2009.
Mark Hill. 2 MilestoneTarget Date 3.01Complete 3.02Complete 3.03Complete 3.04May 3.05June 3.06July 3.07August 3.08September 3.09October 3.10 General ReleaseNovember.
Agenda MC Aug 13.
Space Data Services Session 2: Space Data Country Outreach and Delivery Agenda Item #3 Brian Killough CEOS Systems Engineering Office (SEO) February 25,
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
EVLA M/C Software PDR, 14 May 2002
Scheduling Toolkit Observation Scheduling Boyd Waters, NRAO
McDonald’s Kalender 2009.
Background Information P.Napier
McDonald’s calendar 2007.
EVLA Operations Jim Ulvestad
February 2007 Note: Source:.
Fueling the Future of the Fairbanks North Star Borough
McDonald’s calendar 2007.
2015 January February March April May June July August September
Presentation transcript:

Massachusetts Institute of Technology Kavli Institute for Astrophysics and Space Research 5 December 2011MWA PE Status The First Three Phases of 128T Bob Goeke, Project Engineer

2 The End of 32T ◊X16 could have been better, but we got some useful science data ◊That data is being used by the Data Analysis group to prepare for Commissioning ◊Testing with 500m of LMR forced us to face dynamic range issue Filter reduces 16db range -> 8db ◊X16 could have been better, but we got some useful science data ◊That data is being used by the Data Analysis group to prepare for Commissioning ◊Testing with 500m of LMR forced us to face dynamic range issue Filter reduces 16db range -> 8db 5 December2011MWA PE Status

3 Whitening Filter 5 December2011MWA PE Status

4 Phase Zero: Contracts ◊Infrastructure ◊Receivers First unit 20 February; last 2 July ◊Tiles & Beamformers All arrive by 1 May ◊PFB & Computers for Correlator/RTC On hand ◊Infrastructure ◊Receivers First unit 20 February; last 2 July ◊Tiles & Beamformers All arrive by 1 May ◊PFB & Computers for Correlator/RTC On hand 5 December2011MWA PE Status

5 Phase One: Infrastructure ◊February -> May Trenching Tile location survey 240VAC mains power to receiver locations ◊ Includes provision for 256T expansion Fiber optics to receiver locations Power & Fiber from PowerStation/DPF to Hub ◊February -> May Trenching Tile location survey 240VAC mains power to receiver locations ◊ Includes provision for 256T expansion Fiber optics to receiver locations Power & Fiber from PowerStation/DPF to Hub 5 December 2011MWA PE Status

6 5 December2011MWA PE Status

7 5 December2011MWA PE Status

8 5 December2011MWA PE Status

9 Phase Two: Deployment ◊June -> October 32 Tiles & 4 Receivers; repeat 4 times ◊ Engineering Acceptance; Science Commissioning ◊Nominal Support Case ASKAP/MWA Data Processing Facility available 128T Correlator/RTC/M&C installed in DPF MWA Data Archive Computer installed 1 Gbps internet connection ◊June -> October 32 Tiles & 4 Receivers; repeat 4 times ◊ Engineering Acceptance; Science Commissioning ◊Nominal Support Case ASKAP/MWA Data Processing Facility available 128T Correlator/RTC/M&C installed in DPF MWA Data Archive Computer installed 1 Gbps internet connection 5 December2011MWA PE Status

10 Phase Two Alternative ◊Backup Support Case Use 32T 240V generator 32T Software Correlator, M&C in Telstra hut MWA Data Archive Computer in Telstra hut 1Gbps internet connection ◊Backup Support Case Use 32T 240V generator 32T Software Correlator, M&C in Telstra hut MWA Data Archive Computer in Telstra hut 1Gbps internet connection 5 December2011MWA PE Status

11 Phase Three: Commissioning ◊Science and Commissioning run hand-in- hand Nov > 2013 ◊Incremental Ops Cost Scenario Order-of-Magnitude: $120/hr ◊ ObsScripts + M&C + Archive => 1 FTE ($90/hr) ◊ Fuel: $30/hr NB: Ops plan has 6 FTEs to maintain instrument for nominal operations ◊Science and Commissioning run hand-in- hand Nov > 2013 ◊Incremental Ops Cost Scenario Order-of-Magnitude: $120/hr ◊ ObsScripts + M&C + Archive => 1 FTE ($90/hr) ◊ Fuel: $30/hr NB: Ops plan has 6 FTEs to maintain instrument for nominal operations 5 December2011MWA PE Status