Fabrizio Gagliardi EGEE project director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract.

Slides:



Advertisements
Similar presentations
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
Advertisements

DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 DataGrid Quality Assurance On behalf.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE-III Program of Work Erwin Laure EGEE-II / EGEE-III Transition Meeting CERN,
EGEE is a project funded by the European Union under contract INFSO-RI NA1 F. Gagliardi EGEE Project Director All Activity Meeting, 13 th September.
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
This work is part of EQUITY ACTION which has received funding from the European Union, in the framework of the Health Programme.
INFSO-RI Enabling Grids for E-sciencE Financial Status EGEE Collaboration Board – Athens – April 20 th, Severine Bergerot.
EGEE (EU IST project) – Networking Activities 4: biomedical applications NA4 Biomedical Activities Johan Montagnat First EGEE Meeting Cork,
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
LINKED Administrative & Finance overview18/03/2010 LINKED Leveraging Innovation for a Network of Knowledge on Education LIFE LONG LEARNING PROGRAMME LLP.
EGEE is a project funded by the European Union under contract IST The EGEE Project Fabrizio Gagliardi Project Director NA3 Induction Course,
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
Licia Florio & John Dyer1 The EGEE Project TERENA NA2 Dissemination All Activity Meeting Jan 2004 Licia Florio, John Dyer TERENA
SEE-GRID-SCI Ognjen Prnjat, Project Coordinator Anna Loukakou, Project Financial Administration GRNET NA1: Project Administrative and.
EGEE-II INFSO-RI Enabling Grids for E-sciencE 3 rd All-Activity Meeting Introduction and NA1 status Bob Jones – Project Director,
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
SEE-GRID-SCI Ognjen Prnjat, Project Coordinator GRNET NA1: Project Administrative and Technical Management PSC07 Meeting, Zabljak,
SLHC – PP Management Plan April 3 rd, 2008 M. Capeans, M. Ropka CERN April 3, 20081M.C.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
Fabrizio Gagliardi EGEE designated project director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
INFSO-RI ETICS Periodic Review – Administrative and Financial requirements Karin Burghauser, CERN Project Admin.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
Conference xxx - August 2003 Fabrizio Gagliardi EGEE designated Project Director EGEE: status and overall project planning.
EGEE is a project funded by the European Union under contract IST Collaboration Board F.Gagliardi Project Director Cork Conference, 20 th April.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Presentation of templates and supporting documents Anna Cook EGEE-II / EGEE II Transition.
EGEE is a project funded by the European Union under contract IST NA1 & NA5 Fabrizio Gagliardi Project Director AA Meeting, CERN, 18th June.
EGEE MiddlewareLCG Internal review18 November EGEE Middleware Activities Overview Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as.
Ismar Project management issues the non-scientific side of NEAREST Alessandra Borgatti ASTER Nearest Kick-off meeting Bologna, 11 October 2006.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE All Activity Meeting – 17 March NA2 Dissemination & Outreach EGEE is proposed as a project funded by the European Union under contract IST
INFSO-RI Enabling Grids for E-sciencE-II Anna Cook Dita Mocova Reporting procedures & Financial Guidelines.
INFSO-RI Enabling Grids for E-sciencE Severine Bergerot EGEE-2: Period 1 reporting instructions.
INFSO-RI Enabling Grids for E-sciencE Status of the Project Fabrizio Gagliardi, Project Director, CERN EGEE 1 st EU Review 9-11/02/2005.
LCG LCG Workshop – March 23-24, Middleware Development within the EGEE Project LCG Workshop CERN March 2004 Frédéric Hemmer.
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-II Status Bob Jones – Project Director.
Bob Jones EGEE technical director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract IST
WP1- Management EuroVO-DCA 1 st PCT Meeting – 3&4 May 2007 Mathias DEPRETZ – EuroVO-DCA Project Manager 1 st PCT meeting 3&4 May 2007 Strasbourg EuroVO.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
INFSO-RI Enabling Grids for E-sciencE Plans for the EGEE-2 EGEE 2 Task Force 3rd EGEE Conference, Athens, April 2005.
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
SA2 : Network Resource Provision All Activity Meeting – 17 March SA2 Execution Plan for the first year Jean-Paul Gautier SA2 Manager CNRS/UREC.
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
Last update: 03/03/ :37 LCG Grid Technology Area Quarterly Status & Progress Report SC2 February 6, 2004.
EGEE is a project funded by the European Union under contract INFSO-RI NA5 M. Heikkurinen NA5 Activity Manager All Activity Meeting, 13 th September.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
Bob Jones EGEE designated technical director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
INFSOM-RI WP1: Administrative and Technical Management Alberto Di Meglio Project Manager.
WP3 EGEE Steve Fisher / RAL 14/1/2004. WP3 Steve Fisher/RAL - 14/1/2004EGEE2 Credits My slides have been stolen from many sources including: –Fabrizio.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
INFSO-RI Enabling Grids for E-sciencE EGEE-II project proposal overview By Bob Jones EGEE Technical Director CERN.
Bob Jones EGEE Technical Director
AMICI WP1 – Management, coordination and dissemination
EGEE Middleware Activities Overview
JRA3 Introduction Åke Edlund EGEE Security Head
SA1 Execution Plan Status and Issues
EMI Project Processes and Tools
Ian Bird GDB Meeting CERN 9 September 2003
JRA1 (Middleware) Overview
Institute of Informatics & Telecommunications
Preparing for EGEE-III
EGEE is a project funded by the European Union
SKADS Controller’s Meeting Timeline Annual Financial Report
JRA2 Quality Assurance Geneviève Romier CNRS-UREC
Presentation transcript:

Fabrizio Gagliardi EGEE project director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract IST NA1 execution plan

EGEE all activity W/S Jan ‘ Objectives of the activity and partners involved NA1 - Management Management and administration of the project Relationship with the EU Commission Partners:  CERN based (all other partners present for audit certificates only)

EGEE all activity W/S Jan ‘ NA1 deliverables and milestones (year 1) Deliverables DNA M3Quarterly reports DNA1.2M3Gender Action Plan DNA1.3.1M9Periodic report MNA1.1M11Successful completion of first review

EGEE all activity W/S Jan ‘ EGEE management G. Zaquine A. Aimar I. Bird C. Vistoli F. Hemmer E. Laure M. Aktinson J. Dyer V. Breton F. Harris JP. Gautier J. Orellana ? F. Gagliardi B. Jones A. Blatecky E. Jessen T. Priol D. Snelling

EGEE all activity W/S Jan ‘ NA1: Project Office staff and plans By April 1 st existing EDG/EGEE CERN Project Office will be gone With the following exceptions: Karin Burghauser will be back at 60% and Marie-Laure Bourgeois-Schutz will continue on detachment from CNRS September ’04 3 new persons have been hired Anna Cook (project Secretary) started on February 1 st Kristina Gunne (administrator) started on March 16 th Severine Bergerot (financial officer) started on March 1 st Two PR/information officers will start soon (for NA2) To replace Rosy Mondardini on April 1 st who is moving to general CERN IT PR office which will offer general support to EGEE Leticia Martignon Marc-Elian Begin CERN has confirmed general legal and administrative support (auditing, reporting etc.)

EGEE all activity W/S Jan ‘ NA1 Resource Plan

EGEE all activity W/S Jan ‘ NA1 tasks and products Overall project management and administration Quarterly and period reports Cost claims, EU payments, deliverables management etc. Periodic EU reviews Relations with the EU and preparation for future call(s) Dissemination and Public Relations activity In collaboration with NA2 Overall technical management Control and monitoring of deliverables and milestones Coordination with LCG Organization of the following project boards: External Advisory Committee - Meets twice per year (at project conferences) Project Executive Board - Meets weekly with extended meetings once per quarter Project Management Board - Meets once per month (conf calls) + face to face (at project conferences) Project Collaboration Board - Meets twice per year (at project conferences) Project Administration Board - Meets once per quarter

EGEE all activity W/S Jan ‘ Gender action plan Plan for how gender issues will be addressed within the project Work started in collaboration with all partners, documented on the web site Please make sure to provide Marie-Laure with statistics of the gender distribution in your hiring process Specific deliverable (DNA1.2) due by PM3

EGEE all activity W/S Jan ‘ LCG/EGEE coordination LCG Project Leader in EGEE Project Management Board EGEE Project Director in LCG POB Cross technical management relations between LCG and EGEE being established (Middleware and Operations Managers in common between LCG and EGEE PEBs) EGEE Technical director in LCG PEB EGEE HEP applications hosted in CERN and core resource of the LCG ARDA prototype

EGEE all activity W/S Jan ‘ Effort estimation for each task identifying groups involved and key individuals The detailed figures needed for the effort of each task has been calculated based on the experience gained in the EDG project (i.e. project office) and scaling-up taking into account the number of partners.

EGEE all activity W/S Jan ‘ Training requirements New Project Office staff will require formal and informal training (severe overhead for Project Management) Covering admin procedures used within the project Training for financial administrator CERN and EU accounting procedures Should foresee training on project management tools to be used within the project (not software development tools) Calendar/agenda tool (agenda maker) EDMS (document management tool) Effort reporting tool (to be defined) How to write a quarterly report How to write an annual report

EGEE all activity W/S Jan ‘ Risk analysis Late signature of contract delaying start date: negotiating with partners and the EU Late hiring: start the hiring process before the project start date Non-delivery of deliverables: use PEB to do regular checks on advance of work Poor quality deliverables rejected by the EU: use internal review procedure to ensure good quality deliverables Non-delivery of PPT tool: foresee backup manual procedure for handling QRs and periodic reports Non-availability of NA1 personnel (absence, illness etc.): ensure sufficient overlap so someone else in NA1 can complete necessary tasks Late payment of cost claims: ensure correctness of cost claims before sending to EU There is no contingency in the financial plan for the project. NA 1 must coordinate, within the limits of the CA, the resolution of any difficulties arising

EGEE all activity W/S Jan ‘ Issues/actions related to other activities Relations to NA2 dissemination activities Relations to training NA3 (take over tutorials from EDG) Relations to NA4 (meetings with HEP applications, general applications) Other projects support (NA5, SA, JRA etc.) Relations to eInfrastructure EU reflection group Relations to national and international activities

EGEE all activity W/S Jan ‘ Changes requested to the TA Nothing foreseen for NA1 for the moment

EGEE all activity W/S Jan ‘ Steps to be taken between now and the project startup, + 3 months CA and contract signature processes have started, administrative and management structures are in place. Establish reporting relations to new CERN management, adapt to LCG new plans NA1: Contract received on March 6 th Consortium Agreement finalised on March 6th Signatures are being collated and it is foreseen that the contract will be signed by CERN week beginning March 22 nd, all issues being resolved (US) Major milestone: to have PO in place and federation infrastructure working by April 1 st In Q1: handle the advance payment and prepare Q1 report NA5: complete the hiring and finalize the job description