WLCG Grid Deployment Board CERN, 14 May 2008 Storage Update Flavia Donno CERN/IT.

Slides:



Advertisements
Similar presentations
Storage: Futures Flavia Donno CERN/IT WLCG Grid Deployment Board, CERN 8 October 2008.
Advertisements

Storage Issues: the experiments’ perspective Flavia Donno CERN/IT WLCG Grid Deployment Board, CERN 9 September 2008.
– n° 1 StoRM latest performance test results Alberto Forti Otranto, Jun
IT 499 Bachelor Capstone Week 9.
LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
SRM at Clemson Michael Fenn. What is a Storage Element? Provides grid-accessible storage space. Is accessible to applications running on OSG through either.
DPM CCRC - 1 Research and developments DPM status and plans Jean-Philippe Baud.
Special Publication : Interfaces for Personal Identity Verification Jim Dray NIST NPIVP Workshop March 3, 2006.
CERN, 29 August 2006 Status Report Riccardo Zappi INFN-CNAF, Bologna.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Status report on SRM v2.2 implementations: results of first stress tests 2 th July 2007 Flavia Donno CERN, IT/GD.
Status of SRM 2.2 implementations and deployment 29 th January 2007 Flavia Donno, Maarten Litmaath IT/GD, CERN.
SRM 2.2: tests and site deployment 30 th January 2007 Flavia Donno, Maarten Litmaath IT/GD, CERN.
SRM 2.2: status of the implementations and GSSD 6 th March 2007 Flavia Donno, Maarten Litmaath INFN and IT/GD, CERN.
Access Online Cardholder Transaction Approval Training 1 Client Logo.
CERN IT Department CH-1211 Geneva 23 Switzerland t Storageware Flavia Donno CERN WLCG Collaboration Workshop CERN, November 2008.
INFSO-RI Enabling Grids for E-sciencE DAGs with data placement nodes: the “shish-kebab” jobs Francesco Prelz Enzo Martelli INFN.
The huge amount of resources available in the Grids, and the necessity to have the most up-to-date experimental software deployed in all the sites within.
Andrew C. Smith – Storage Resource Managers – 10/05/05 Functionality and Integration Storage Resource Managers.
CS 3610: Software Engineering – Fall 2009 Dr. Hisham Haddad – CSIS Dept. Class Project OO Design Document Here is what you need to do for your class project.
SRM workshop – September’05 1 SRM: Expt Reqts Nick Brook Revisit LCG baseline services working group Priorities & timescales Use case (from LHCb)
Report on Installed Resource Capacity Flavia Donno CERN/IT-GS WLCG GDB, CERN 10 December 2008.
1 User Analysis Workgroup Discussion  Understand and document analysis models  Best in a way that allows to compare them easily.
INFSO-RI Enabling Grids for E-sciencE Enabling Grids for E-sciencE Pre-GDB Storage Classes summary of discussions Flavia Donno Pre-GDB.
WLCG Grid Deployment Board, CERN 11 June 2008 Storage Update Flavia Donno CERN/IT.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
GEtServices Purchasing Units & Materials Training For Suppliers Request.
SRM & SE Jens G Jensen WP5 ATF, December Collaborators Rutherford Appleton (ATLAS datastore) CERN (CASTOR) Fermilab Jefferson Lab Lawrence Berkeley.
1 Andrea Sciabà CERN Critical Services and Monitoring - CMS Andrea Sciabà WLCG Service Reliability Workshop 26 – 30 November, 2007.
Maarten Litmaath (CERN), GDB meeting, CERN, 2006/06/07 SRM v2.2 working group update Results of the May workshop at FNAL
VO management: Progress since Chicago Workshop Vincenzo Ciaschini 23/5/2002 CNAF – Bologna.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
CERN SRM Development Benjamin Coutourier Shaun de Witt CHEP06 - Mumbai.
Jens G Jensen RAL, EDG WP5 Storage Element Overview DataGrid Project Conference Heidelberg, 26 Sep-01 Oct 2003.
Automatic Resource & Usage Monitoring Steve Traylen/Flavia Donno CERN/IT.
Procedure to follow for proposed new Tier 1 sites Ian Bird CERN, 27 th March 2012.
Busy Storage Services Flavia Donno CERN/IT-GS WLCG Management Board, CERN 10 March 2009.
Procedure for proposed new Tier 1 sites Ian Bird WLCG Overview Board CERN, 9 th March 2012.
CERN IT Department CH-1211 Genève 23 Switzerland t HEPiX Conference, ASGC, Taiwan, Oct 20-24, 2008 The CASTOR SRM2 Interface Status and plans.
Storage Classes report GDB Oct Artem Trunov
LCG WLCG Accounting: Update, Issues, and Plans John Gordon RAL Management Board, 19 December 2006.
Author - Title- Date - n° 1 Partner Logo WP5 Status John Gordon Budapest September 2002.
Report from GSSD Storage Workshop Flavia Donno CERN WLCG GDB 4 July 2007.
Report on Installed Resource Capacity Flavia Donno CERN/IT-GS WLCG Management Board, CERN 25 November 2008.
Handling of T1D0 in CCRC’08 Tier-0 data handling Tier-1 data handling Experiment data handling Reprocessing Recalling files from tape Tier-0 data handling,
StoRM: status report A disk based SRM server.
INFSO-RI Enabling Grids for E-sciencE Enabling Grids for E-sciencE Storage Element Model and Proposal for Glue 1.3 Flavia Donno,
SRM-iRODS Interface Development WeiLong UENG Academia Sinica Grid Computing 1.
CMS: T1 Disk/Tape separation Nicolò Magini, CERN IT/SDC Oliver Gutsche, FNAL November 11 th 2013.
Middleware Status Markus Schulz, Oliver Keeble, Flavia Donno Oxana Smirnova (ARC) Alain Roy (OSG) ~~~ LCG-LHCC Mini Review 1 st July 2008.
Grid Deployment Board 5 December 2007 GSSD Status Report Flavia Donno CERN/IT-GD.
1 SRM v2.2 Discussion of key concepts, methods and behaviour F. Donno CERN 11 February 2008.
SRM 2.2: experiment requirements, status and deployment plans 6 th March 2007 Flavia Donno, INFN and IT/GD, CERN.
CMS User Support and Beijing Site Xiaomei Zhang CMS IHEP Group Meeting March
Bologna, March 30, 2006 Riccardo Zappi / Luca Magnoni INFN-CNAF, Bologna.
CERN IT Department CH-1211 Genève 23 Switzerland t DPM status and plans David Smith CERN, IT-DM-SGT Pre-GDB, Grid Storage Services 11 November.
Jean-Philippe Baud, IT-GD, CERN November 2007
Status of the SRM 2.2 MoU extension
Short term improvements to the Information System: a status report
SRM v2.2 / v3 meeting report SRM v2.2 meeting Aug. 29
SRM v2.2 planning Critical features for WLCG
SRM2 Migration Strategy
Proposal for obtaining installed capacity
OGSA Data Architecture Scenarios
To the ETS – Encumbrance Online Training Course
Stephen Burke egi.eu EGI TF Prague September 20th 2012
To the ETS – Encumbrance Online Training Course
INFNGRID Workshop – Bari, Italy, October 2004
ONLINE FILING Updates and Review
Presentation transcript:

WLCG Grid Deployment Board CERN, 14 May 2008 Storage Update Flavia Donno CERN/IT

WLCG Grid Deployment Board, CERN 13 May Overview Summary of the discussions on the SRM v2.2 Addendum to the Usage Agreement Some questions for the experiments

WLCG Grid Deployment Board, CERN 13 May The experiments requirements The goal of the SRM v2.2 Addendum is to provide answers to the following Main questions : What kind of spaces (T1D0, T1D1, T0D1) Space protection Space selection Pre-staging Space usage statistics Tape optimization (reducing the number of mount operations, etc.) Main dates: 19 May: technical agreement among the developers 23 May: experiment agreement. Document submitted to a few site representatives for comments. 2 June: document finalization with time estimation for implementation. 10 June: submission to the MB for approval. Start of the implementation phase.

WLCG Grid Deployment Board, CERN 13 May The document and validation 2 main parts: A detailed description of a full solution implementation independent Implementation plans per storage solution are also detailed with dates for each of the features. A summary of what can be achieved by the end of the year per implementation For the partial and full solutions a test suite will be ready for the validation of the implementations Most probably also a draft plan for certification and deployment will be included in the document.

WLCG Grid Deployment Board, CERN 13 May The MoU Addendum Spaces, files, copies and TURLs are defined The behavior of the implementations for a set of operations has been clarified. srmRm it is an operation on namespace only. srmLs must return the arrayOfSpaceTokens. srmPurgeFromSpace removes disk copies only. srmBringOnline can be used to bring a file in a different space srmPrepareToPut/PutDone does not allow to specify for how long the created copy stays on disk. This is system specific. It is not possible to release copies created via a Put cycle or via an srmCopy operation. At the moment srmCopy does not allow to pass tokens and destination copy lifetime. We will use a specific SRM structure to pass this info. Clients would need to be modified to check this structure. srmReleaseFiles must be properly implemented to allow releasing of files without specifying the request ID.

WLCG Grid Deployment Board, CERN 13 May The MoU Addendum Clients can now specify tokens for space selection on srmPrepareToGet, srmBringOnline, srmCopy srmChangeSpaceForFiles is not mandatory Space Tokens can be specified on Get The concept of file primary copy is not used in WLCG No tape transitions are allowed in WLCG srmLs fileLocality parameter reflects the status of all copies. If there is a nearline copy of a file in T1D0 and another online copy in T0D1, the status of the file is NEARLINE_AND_ONLINE To optimize tape usage the structure TExtraInfo can be used to pass additional implementation specific info that are ignored by other implementations

WLCG Grid Deployment Board, CERN 13 May The MoU Addendum Access Control Lists and a set of allowed operations are defined on spaces. Administrative interface. Read/Write/Stage/Purge are mandatory operations Release/Update/Query/Modify-ACLs are optional More granularity with implementation specific features Permissions on spaces are expressed in terms of DNs and/or VOMS FQANs. Optional FQAN wildcards. ACLs can be positive or negative. fqan:dteam/Role=production:RSWQP:ALLOW fqan:dteam/Role=lcgamin:DURWSPQM:ALLOW fqan:dteam RSQ:ALLOW fqan:EVERYONE:DURWSPQM:DENY NFSv4-type ACLs with either POSIX or NFSv4 matching algorithm Definition of ACLs modification operations

WLCG Grid Deployment Board, CERN 13 May Questions for exps Comments on pinning copies ? Pinning on Put is implementation specific Pinning will remain soft for some implementations The space after a file removal operation will not be made available immediately srmLs fileLocality returns the status of all copies srmReleaseFiles with no requestID Is this needed ? Please, provide valid use cases. Sign with the name of the experiment and person providing usecase. Comments on protecting spaces Is this enough ? It will slow down operations ? Wildcards on FQAN Anything else ?

WLCG Grid Deployment Board CERN, 14 May 2008 Thank You