1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
F Specifications for the dark current kicker for the NML test facility at Fermilab S. Nagaitsev, M. Church, P. Piot, C.Y. Tan, J. Steimel Fermilab May.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Stripline Kicker Project LBL LLNL SLAC KEK DESY. Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β,
CIEMAT ACTIVITIES ON STRIPLINE KICKERS I. Rodríguez.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
CLIC RTML collimation systems and beam stabilisation R. Apsimon CERN, TE-ABT-BTP ECFA LC2013 at DESY, Hamburg 27 th -31 st May 2013.
1 Experience at ATF To get a low emittance beam Junji Urakawa KEK Circumference: m Arc Cell Type: FOBO Number of Arc Cells: 36 Energy: GeV.
XFEL Pulser Specification of Pulser Dump pulser with a Belhke switch
Status of Fast Pulser and Kicker Work at UIUC and Cornell Robert Meller Cornell University Laboratory for Elementary-Particle Physics.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
1 Injection tuning of ATF Design acceptance of the ATF-DR Emittance(x,y)3x10 -3 m Timing +/-350ps dE/E+/-1.5% To supply stable beams to ATF2, the injector.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Status of ATF Fast Kicker Experiment
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Injection/extraction R&D Summary S. Guiducci (INFN), Thomas Mattison (UBC) KEK - ILCDR07, Dec 207.
SPring-8 upgrade : a fast kicker system for beam injection Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
Non-EC R&D KEK Junji Urakawa at INFN. Discussing issues : 1. Experimental confirmation for the threshold of Fast ion instability Need clear data.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
ATF2 Status N.Terunuma, KEK
TPS pulse magnet measurement
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
LCLS_II High Rep Rate Operation and Femtosecond Timing
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Fast Kicker R&D in the Americas Region
Junji Urakawa (KEK) for ATF International Collaboration
Conclusions of LCWS08 & ILC08, Chicago, November ‘08
Bunch Separation with RF Deflectors
Damping Ring Kicker Tests at AØ
Thursday morning – optics correction
Strip-line Kicker R&D at KEK-ATF
Intra-Pulse Beam-Beam Scans at the NLC IP
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
Summary of Week 16 G. Arduini, J. Wenninger
Feed forward orbit corrections for the CLIC RTML
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Specifications for the XFEL Beam Switchyard Kickers
Presentation transcript:

1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito

2 ILC kicker Kick angle 0.6 mrad b x at kicker 50 m Repetition rate of the burst 6 - 2MHz Number of macro-pulse 1320/2625/5120 Repetition rate of the macro- pulse 5 Hz Rise and fall time < ns Peak kick stability 0.07 % Residual kick < 0.42  radian ILC kicker parameters Multi-units of strip-line kicker

3 Time response measurement using 30cm long strip-line electrode. The drive pulser(FID Co. Ltd) have 1.5ns rise time, 5kV peak voltage, 3MHz and 3000 burst pulse. The measured rise time was 3ns, which meets the ILC requirement. Single unit test(30cm long strip-line) (To confirm 3ns of the rise time of the strip-line kicker) Waveform of FID pulsr 5kv peak, 1.5ns rise time

4 Beam extraction test(1) Extraction kicker The beam extraction test was carried out to confirm the performance of the strip-line kicker. The pulsed magnet kicker was replaced to two units of 60cm long strip-line kicker. To help the lack of the kick angle, a local bump orbit and an auxiliary septum is used. ATF2 Extraction line Damping Ring Kicker pulse (10kV) Kicker field

5 Beam extraction test(2) The time sequence is that, 1.10 bunches with 5.6ns bunch spacing beam is injected to the DR three times, 30 bunches total. 2.The local bump orbit is excited gradually after all of beam is damped. 3.The beam is kicked out bunch-by- bunch by the strip-line kicker. 4.The local bump orbit is return to zero.

6 Steer Mag(5mrad) Strip-line kicker 60cm 9mm gap, 11mm gap The drive pulsers are located to the outside of the shielding. 6m cables Kicker and PS location

7 Pictures of the installed components Strip-line electrodes Aux. Septum FDI pulsers Bump PS and Septum PS

8 Precise triggers for each pulser and the timing control is required. The pulse measurement by the scope and the timing control by digital delays consist the trigger timing feedback. The step of the digital delay is 60ps. The trigger system could keep the pulse timing in the range of 200ps. Programmable Digital delay

9 Improvements for multi-bunch extraction Stable beam storage to the DR Previous experiment could not realize stable beam extraction, which come from unstable beam storage to the DR | Stable 5.6ns laser system for RF gun and other effort could cure the beam blow up at the inection. Timing adjustment circuit is newly installed We already understood FID pulser has timing shift at the burst mode, when changing the interval. | Timing adjustment circuit is used to make stable stable kicker pulse timing.

10 Multi-bunch extraction (30 bunches) with 308ns bunch spacing 2010/06/17 The intensity of each bunch is not flat and unstable. The horizontal beam position was distributed to two position.

11 Pulse train delay adjustment circuit w/o delay with delay Use for beam extraction

12 Multi-bunch Beam in the DR and the extraction line Stable beam extraction was confirmed at the extraction line. The beam reach to the beam dump without any beam loss. 30 bunches of the beam are stored to the DR, stably.

13 Orbit and jitter measurement Left figure shows the kick angle as a function of the pulse number. The kick angle of the multi- bunch distributes around 1%. It shows the difference of the kick field for each pulse. Right figure shows the kick angle jitter ratio for the kick angle as a function of the pulse number. The jitter ratio for the kick angle was distributed from 1x10 -3 to 4x10 -3 for each pulse. This value is larger than the single bunch jitter. The timing adjustment was not enough at this time.

14 Jitter 1.05e-6/3e-3=3.5e-4 Jitter 2.24e-6/3e-3=7.4e-4 Single bunch jitter

15 Use for ATF2 beam We could confirmed the dispersion correction of the ATF2 beam line by the beam profile change of the MS1IP wire scanner. The measured size was limited to 1.4um due to the wire size.

16 Profile of the kick field and the jitter Plot shows the beam position at MQM16FF BPM, when scanned the kicker pulse timing. There is no flattop of the kick field and the jitter increased at the both side of the peak. To make stable beam kick, careful timing adjustment of four pulses is needed. 200ps

17 Problem single bunch 1 train 9 bunch 1 train Itot=2x bunch 3 train Itot=6x10 10 Blue line: current Red line: v size 2hour The stored current decreased gradually when the multi-bunch operation. The current decrease depends on the stored current. Several minutes after the beam stop, the situation recovered. We suspect the heating of the strip-line electrode made such a happeninig.

18 Summary and Next step For the next step, we have to clear following problems, 1.High current beam storage is limited by the horizontal aperture of the strip-line(9mm). 2.The stored current reduction have to cure. Fast kicker performance was confirmed by the multi- bunch beam extraction from the ATF-DR to the ATF2 extraction line. The kick angle stability 3.5x was measured for the single bunch beam. The multi-bunch kick angle and the stability were measured.