Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab New kappa not yet in operation.

Slides:



Advertisements
Similar presentations
Tango Meeting DESY Status Report Thorsten Kracht Grenoble, 13. May 2009.
Advertisements

Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
Staus Report EMBL Hamburg Gleb Bourenkov Kappa Workgroup Meeting September 20-21, 2009 EMBL Grenoble.
Staus Report EMBL Hamburg Gleb Bourenkov Kappa Workgroup Meeting September 28-29, 2009 MAXLAB.
Research Instrumentation Special Interest Group Sensors & Instrumentation Knowledge Transfer Network Report on American Light Source Facilities Oliver.
2002 November 16 CLS PROJECT STATUS M.S. de Jong Project Leader November 16, 2002 Annual Users’ Meeting.
R. Nagaoka, A. Nadji, M.E. Couprie, O. Marcouillé
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt, weiß MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange.
Diamond Radiator Assessment Report on the CHESS run May 1-7, 2009 Richard Jones, Igor Senderovich, Franz Klein, Pawel Nadel-Turonski GlueX collaboration.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Epics Collaboration Meeting Pohang Oct 2012
M. Bieler, M. Ebert, L. Fröhlich, J. Keil, J. Klute, G. Kube, G. K. Sahoo, R. Wanzenberg, DESY, Hamburg, Germany Abstract Acknowledgment Commissioning.
Education and training for optimum use of
Bright Lights on the Horizon Future Perspectives for Nuclear Resonant Scattering of Synchrotron Radiation Ralf Röhlsberger DESY, Hamburg, Germany.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
Low Emittance RF Gun Developments for PAL-XFEL
Kappa Group Meeting - September BL13 — XALOC Guifré Cuní Jordi Juanhuix on behalf of the XALOC team.
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
Status of the Spanish Light Source David Beltrán.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
The Future of Photon Science and Free-Electron Lasers Ingolf Lindau Lund University and Stanford University MAX-Lab and Synchrotron Light Research KTH,
RREPS'11, Egham (UK) Status of Beam Loss Detector Tests and Developments at PETRA III & ESRF Gero Kube DESY (Hamburg) Introduction: PETRA III Extension.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
February 2010 ALBA Synchrotron Light Source Francis Perez.
ELECTRON MOVING AT CONSTANT VELOCITY
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
First results from the far-infrared beamline at the Canadian Light Source: High resolution analysis of acrolein in the 600 cm -1 region A.R.W. McKellar.
Dec 04 Beam Stability First considerations for beam stability at ALBA Marc Muñoz ALBA Team.
DESY Deutsches Electron Synchrotron Shima Bayesteh.
Thomas Jefferson National Accelerator Facility Page 1 Overview Talk Content Break-out Sessions Planning 12 GeV Upgrade Software Review Jefferson Lab November.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
Kappa Workgroup Meeting | Bessy | Nov 28-29, 2011Session 4: Beamline GUIs 1 Beamline GUIs at ALBA Guifre Cuni on behalf of the Controls Group.
BROOKHAVEN SCIENCE ASSOCIATES NSLS-II - New opportunities for high pressure research - Lars Ehm National Synchrotron Light Source Brookhaven National Laboratory.
TAC Synchrotron Radiation Project Dr. Zafer Nergiz Nigde University Science Faculty Physics Department.
Diamond update and kappa activities village structure 19 operational beamlines 5 operational MX beamlines one MX beamline (I23) under construction mini.
ESLS-RF Trieste, September 29-30, Åke Andersson RF systems for the MAX IV rings Åke Andersson On behalf of the MAX-lab RF team.
DAQ control system for multi-beamline simultaneous experiments at SACLA Takashi SUGIMOTO Japan Synchrotron Radiation Research Institute (JASRI/SPring-8)
Questions to automatic workshop. 13 BLs financed Another 5 under discussion MAX IV status: Injector linac running since May GeV ring under commissioning.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
ΟΡΓΑΝΩΣΗ ΚΑΙ ΔΙΟΙΚΗΣΗ ΕΠΙΧΕΙΡΗΣΕΩΝ 3 Ο ΜΑΘΗΜΑ. ΟΙ ΜΕΓΑΛΕΣ ΕΠΙΧΕΙΡΗΣΕΙΣ Η δημιουργία μεγάλων επιχειρήσεων είναι ένα από τα χαρακτηριστικά του 20 ου αιώνα.
Operation Status of the RF Systems and Taiwan Photon Source
NATIONAL SYNCHROTRON RADIATION CENTRE SOLARIS JAGIELLONIAN UNIVERSITY, KRAKOW, POLAND Piotr Goryl Tango Collaboration Meeting, Elettra,
Long Term Plans at MAX IV
Solaris status Wojciech Kitka, on behalf of CS&IT group and whole Solaris team Touluse,
National SYNCHROTRON Radiation Centre SOLARIS Jagiellonian University, Krakow, Poland Piotr Goryl Motion Workshop, Soleil,
TXO freelance mxCuBE & more.
Status of MXCuBE Beamline Control at BESSY II
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Status of the MAX IV Short Pulse Facility
Sara Thorin, MAX IV Laboratory
                                                                       TANGO Collaboration Experience for running a multi-site international software project.
Institute of Physics, University of Tartu, Estonia
Biology at Advanced Laser Light Sources
LCLS Instrument Development
Bubble Chamber Planning Meeting
The Storage Ring Control Network of NSLS-II
The EPICS running envirionments in the five accelerator projects
MAX IV Laboratory National Synchrotron Light Source – two storage rings (1.5 & 3.0 GeV) and a Short Pulse Facility Characteristics of User Program: 15.
ESRF Status report.
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Как да кандидатстваме по НИФ
ОПЕРАТИВНА ПРОГРАМА “ИНОВАЦИИ И КОНКУРЕНТОСПОСОБНОСТ“ „Подобряване на производствения капацитет в МСП“
Synchrotron Light Sources
WBS 5.0 LCLS Strategic Projects Division
Dual gripper sample changer implementation in MxCube
Solving Equations 3x+7 –7 13 –7 =.
Roger Ruber for the FREIA team 11 June 2013, Uppsala
Presentation transcript:

Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab New kappa not yet in operation

Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab

Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction

Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat

Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat I911-4 SAXS station Under commissioning

Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat I911-4 SAXS station Under commissioning I911-5 MX station Single-axis goniostat New monochromator

Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat I911-4 SAXS station Under commissioning I911-5 MX station Single-axis goniostat New monochromator I911-3 Tunable MX station Mini-kappa MK3

Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-3: Experiment station completely rebuilt March-May 2010 (new hutch, new experiment tables, new goniostat,...) Users during June 2010 Sample changer installation October 2010

Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab

Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab

Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab

Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-3: Control software: spec and mxCuBE mini-kappa MK3: not yet used

Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab MAX IV New facility replacing the present MAX I, MAX II & MAX III storage rings (and the present FEL test facility) Consisting of: GeV ring (96 m circumference, 6 nm rad) - 3 GeV ring (530 m circumference, 0.3 nm rad, 19 straight sections available) - a short pulse facility that could be extended with a FEL

Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab MAX IV Funding available for buildings and accelerator... but not for the beamlines We hope to have funding for 7 beamlines this autumn including a microfocus MX beamline and possibly a high-throughput MX beamline.