COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher October 20, 2004.

Slides:



Advertisements
Similar presentations
ERCOT Update on PUCT Posting changes DEWG Meeting 11/27/07 Matt Mereness.
Advertisements

DSWG Update to WMS May 17, DSWG Goals Update.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
Loads Acting as a Resource Relationships with QSEs and LSEs
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher August 23, 2005.
ERCOT Billing, Settlement Disputes & Data Extracts
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.
ERCOT PMO Update Robert Connell Director Program Management Fourth Quarter Results (Through 12/31/04) January 11, 2005.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
ERCOT Program Management Update RMS Meeting – May 15, 2003 Steve Wallace.
QSE Managers Working Group Meeting Notes 7 November, 2008 Report to WMS 19 November, 2008 David Detelich - Chairperson.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Nodal Settlement Delta Calculations and Statements – 7/11/06 Workshop  Objective: Describe design concepts of nodal settlement delta calculations and.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
UFE 2005 Analysis 1 UFE 2005 ANALYSIS Compiled by Load Profiling ERCOT Energy Analysis & Aggregation.
1 ERCOT Wholesale Settlement Module 3. 2 BENA iq = -1 * (Σ (RI iz + LI iz + URC iz + MISD iz + MISR iz ) z + TCRPAY Bei + Σ CSC Bei ) * LRS iq Can you.
GENERATION PROTOCOL AND SETTLEMENT TODAY COMET WG / RMS Workshop Electric Reliability Council of Texas May 2, 2007.
UFE 2008 Analysis 1 UFE 2008 ANALYSIS Compiled by Load Profiling Energy Analysis & Aggregation.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
ERCOT UFE Analysis UFE Task Force February 21, 2005.
Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher February 22, 2005.
Application of High Sustainable Limit With PRR 666/676 WMS November 15, 2006 Ino Gonzalez ERCOT Settlements.
Unit-Specific Bid Limits based on Modified Generic Cost.
Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
PRR525 SCE Method Comparison ERCOT Compliance December 3, 2004.
PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006.
October 13, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements Task.
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
ERCOT Wholesale Market Basics Module 3 Settlement.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Operations Update ERCOT Board Meeting March 18, 2003.
© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
QSE Managers Working Group Report to WMS September 19, 2007.
Update: 30-Minute Emergency Response Service (ERS) Pilot Project Mark Patterson, ERCOT October 7, 2013.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
QSE Managers Working Group Meeting Notes November 10, 2009 Report to WMS November 18, 2009 Jennifer Troutman – Vice Chair.
COPS PRR 599 Notification for Mismatched Inter-QSE Energy Schedules WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher September 27, 2005.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
December 8, 2006 PUCT DR Workshop Status of LaaR Participation in RPRS.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
RPRS March 23, 2006 Presented by ERCOT Art Deller Bill Kettlewell
Nodal Program Update to Cops
TAC Report to the ERCOT Board
RMS Enhance ESI-id Look-up Function
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
The New Texas Wholesale/Retail Market
Presentation transcript:

COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher October 20, 2004

PROJECTS:  PR30014 – Load Research Sampling:  TDSP Pilot – Initiated 08/18/04  Estimated Deployment: November 1, 2004  PR40005 – NIDR to IDR Default Profiling (PRR-471)  Estimated Deployment: November 3, 2004  PUCT – Final REC Purchasing Requirements  Estimated Deployment: late November 2004  PRR-488 – Weather Responsiveness  Estimated Deployment: early December 2004  PR30026 – EPS Meter Data Extract  Estimated Deployment: mid December 2004  PR40104 – Zero Charge Elimination  Estimated Deployment: 2 nd Quarter of 2005  Lodestar Upgrade  Estimated Deployment: 1 st Quarter of 2005

EMMS R4 COPS presentation Ryan Aldridge, ERCOT 9/20/04

4 Projects Affecting Settlements  PR (RPRS)  PR-30131_02 (Resource Plan Improvements)  PR (Resource Specific Bid Limits)  PR (OOM Tool)

PR (RPRS)  PRR’s 413 and 491  11 new Bill Determinants  Changes to both Zonal and Local RPRS Settlement formulas

PR (RPRS) Zonal -- Current  Current Zonal RPRS Formula  PCRP qiuz = -1 * MCPCRP iz * ZCRP qiuz PCRP qiuz = Replacement Reserve Service Payment by Resource per interval for that QSE PCRP qiuz = Replacement Reserve Service Payment by Resource per interval for that QSE MCPCRP iz = Highest Replacement Reserve Market Clearing Price MCPCRP iz = Highest Replacement Reserve Market Clearing Price ZCRP qiuz = Accepted Unit Adjustment Replacement Reserve Service Capacity Quantity (MW) ZCRP qiuz = Accepted Unit Adjustment Replacement Reserve Service Capacity Quantity (MW)

PR (RPRS) Zonal – R4  EMMS R4 Zonal RPRS Formula  PCRP qiuz = -1 * Max (PABCRP iu, MCPCRP iz ) * ZCRP qiuz  PABCRP iu = CBPRP iu /N + HOBPRP iu PABCRP iu = Bid Price of the single Resource awarded Replacement Reserve PABCRP iu = Bid Price of the single Resource awarded Replacement Reserve CBPRP iu = Capacity bid price submitted by the QSE for the single Resource CBPRP iu = Capacity bid price submitted by the QSE for the single Resource N = Number of hours that this Resource is continuously procured N = Number of hours that this Resource is continuously procured HOBPRP iu = Hourly operational bid price submitted by the QSE for the single Resource HOBPRP iu = Hourly operational bid price submitted by the QSE for the single Resource

PR (RPRS) Local -- Current  Current Local RPRS Formula  LPCRP qi = -1 * SUM (PABCRP iu * LCRP qiu ) u LPCRP qi = Replacement Reserve Service Payment by Resource per interval for that QSE LPCRP qi = Replacement Reserve Service Payment by Resource per interval for that QSE PABCRP iu = Bid Price of the single Resource awarded Replacement Reserve of that interval PABCRP iu = Bid Price of the single Resource awarded Replacement Reserve of that interval LCRP qiu = Accepted single Resource Replacement Reserve Service Capacity to solve Local Congestion (MW) per interval per QSE for that single Resource. LCRP qiu = Accepted single Resource Replacement Reserve Service Capacity to solve Local Congestion (MW) per interval per QSE for that single Resource.

PR (RPRS) Local – R4  EMMS R4 Local RPRS Formula  LPCRP iuq = -1 * MAX (0, LPSRP iu + LPORP iu )  LPCRP iq = -1 * SUM (LPSRP iu + LPORP iu ) u LPCRP qi = Replacement Reserve Service Payment by Resource per interval for that QSE LPCRP qi = Replacement Reserve Service Payment by Resource per interval for that QSE LPSRP iu = Price for starting a unit that is selected for Replacement Reserve Service to resolve Local Congestion LPSRP iu = Price for starting a unit that is selected for Replacement Reserve Service to resolve Local Congestion LPORP iu = Price for operating a unit that is selected for Replacement Reserve Service to resolve Local Congestion LPORP iu = Price for operating a unit that is selected for Replacement Reserve Service to resolve Local Congestion  LPORP iu = SUM [(RCGMEC c – MCPE jz ) * MIN (MINCAP ju /4, MR ju )] j  LPSRP iu = RCGSC c /N RCGMEC c = Resource Category Generic Minimum energy Cost for a specific category of generation unit. RCGMEC c = Resource Category Generic Minimum energy Cost for a specific category of generation unit. MCPE jz = Market Clear Price MCPE jz = Market Clear Price MINCAP ju = Generating Unit Low Sustainable Limit as reported in the unit’s Resource Plan MINCAP ju = Generating Unit Low Sustainable Limit as reported in the unit’s Resource Plan MR ju = Actual metered output of the Resource MR ju = Actual metered output of the Resource RCGSC c = Resource Category Generic Startup Cost for a specific category of generation unit RCGSC c = Resource Category Generic Startup Cost for a specific category of generation unit N = Number of hours that this Resource is continuously procured N = Number of hours that this Resource is continuously procured

PR-30131_02 Resource Plan Improvements  PRR’s 359  No new Bill Determinants  No Settlement formula changes

PR-30131_02 Resource Plan Improvements  PRR 359 allows QSEs to update their Resource Plans after the adjustment period  EMMS R4 will take a snapshot of the Resource Plan every 15 minutes  All data passed to Settlements from the Resource Plan will come across as 96 hourly interval cuts instead of the current 24 hourly interval cuts  QSEs will see the 96 hourly interval cuts and will need to scale to 24 hourly interval cuts in order to shadow settle

PR Resource Specific Bid Limits  PRR 485  Bringing back LEIOL’s  Small change to Local Balancing Energy Down formula

PR (Bringing back LEIOL’s)  PRR 485 allows resources to indicate if they are bid or non-bid resources  Deployments to non-bid resources will be paid OOME (NMLEIOL or OOMIOL)  Deployments to bidding resources will be paid as bid (LEIOL)

PR LBE Down formula change -- Current  Current LBEDN formula  LPCRSD quiz = -1 * Σ((MCPE iz - BPM qiuz ) * Max(0, Min(OL qiuz -MR quiz, OL qiuz - IOL qiuz ))) u LPCRSD quiz = Payment to QSE for providing Balancing Energy Down from specific unit to solve Local Congestion per QSE per interval per zone LPCRSD quiz = Payment to QSE for providing Balancing Energy Down from specific unit to solve Local Congestion per QSE per interval per zone MCPE iz = Market Clearing Price of Energy per interval per zone MCPE iz = Market Clearing Price of Energy per interval per zone BPM qiuz = Decremental bid premium specified for that specific unit per interval BPM qiuz = Decremental bid premium specified for that specific unit per interval OL quiz = Resource Plan output level submitted by the QSE for the unit given the unit-specific instruction for that interval OL quiz = Resource Plan output level submitted by the QSE for the unit given the unit-specific instruction for that interval MR quiz = Meter reading per unit per interval MR quiz = Meter reading per unit per interval IOL quiz = The instructed output level for the unit given a unit-specific instruction IOL quiz = The instructed output level for the unit given a unit-specific instruction

PR LBE Down formula change – R4  EMMS R4 LBEDN formula  LPCRSD quiz = -1 * Σ(MAX(0,(MCPE iz - BPM qiuz )) * Max(0, Min(OL qiuz -MR quiz, OL qiuz - IOL qiuz ))) u LPCRSD quiz = Payment to QSE for providing Balancing Energy Down from specific unit to solve Local Congestion per QSE per interval per zone LPCRSD quiz = Payment to QSE for providing Balancing Energy Down from specific unit to solve Local Congestion per QSE per interval per zone MCPE iz = Market Clearing Price of Energy per interval per zone MCPE iz = Market Clearing Price of Energy per interval per zone BPM qiuz = Decremental bid premium specified for that specific unit per interval BPM qiuz = Decremental bid premium specified for that specific unit per interval OL quiz = Resource Plan output level submitted by the QSE for the unit given the unit-specific instruction for that interval OL quiz = Resource Plan output level submitted by the QSE for the unit given the unit-specific instruction for that interval MR quiz = Meter reading per unit per interval MR quiz = Meter reading per unit per interval IOL quiz = The instructed output level for the unit given a unit-specific instruction IOL quiz = The instructed output level for the unit given a unit-specific instruction

 Current LBEDNAGG formula  LPCRSD qviz = -1 * Σ((MCPE iz - BPM qivz )) * Max(0, Min(OL qivz - MR qviz, NETDEQ iv )))v * LBEAG iv LPCRSD = Payment to QSE for providing Balancing Energy Down from specific Aggregated unit to solve Local Congestion per QSE per interval per zone LPCRSD quiz = Payment to QSE for providing Balancing Energy Down from specific Aggregated unit to solve Local Congestion per QSE per interval per zone MCPE iz = Market Clearing Price of Energy per interval per zone MCPE iz = Market Clearing Price of Energy per interval per zone BPM qivz = Decremental bid premium specified for that specific Aggregated unit per interval BPM qivz = Decremental bid premium specified for that specific Aggregated unit per interval OL qivz = Resource Plan output level submitted by the QSE for the Aggregated Unit containing the unit given the unit- specific instruction for that interval OL qivz = Resource Plan output level submitted by the QSE for the Aggregated Unit containing the unit given the unit- specific instruction for that interval MR qviz = Meter reading per Aggregated Unit per interval MR qviz = Meter reading per Aggregated Unit per interval NETDEQ iv = The overall net direction per the instructions given to the Aggregated Unit results in a down direction NETDEQ iv = The overall net direction per the instructions given to the Aggregated Unit results in a down direction LBEAG iv = The percentage of the aggregated instructions to the Aggregate Unit that represents the OOM Energy market. LBEAG iv = The percentage of the aggregated instructions to the Aggregate Unit that represents the OOM Energy market. PR Aggregated LBE Down formula change Current

PR Aggregated LBE Down formula change R4  EMMS R4 LBEDNAGG formula  LPCRSD qviz =-1 * Σ(MAX(0,(MCPE iz - BPM qivz )) * Max(0, Min(OL qivz -MR qviz, NETDEQ iv ))) v * LBEAG iv LPCRSD quiz = Payment to QSE for providing Balancing Energy Down from specific Aggregated unit to solve Local Congestion per QSE per interval per zone LPCRSD quiz = Payment to QSE for providing Balancing Energy Down from specific Aggregated unit to solve Local Congestion per QSE per interval per zone MCPE iz = Market Clearing Price of Energy per interval per zone MCPE iz = Market Clearing Price of Energy per interval per zone BPM qivz = Decremental bid premium specified for that specific Aggregated unit per interval BPM qivz = Decremental bid premium specified for that specific Aggregated unit per interval OL qivz = Resource Plan output level submitted by the QSE for the Aggregated Unit containing the unit given the unit- specific instruction for that interval OL qivz = Resource Plan output level submitted by the QSE for the Aggregated Unit containing the unit given the unit- specific instruction for that interval MR qviz = Meter reading per Aggregated Unit per interval MR qviz = Meter reading per Aggregated Unit per interval NETDEQ iv = The overall net direction per the instructions given to the Aggregated Unit results in a down direction NETDEQ iv = The overall net direction per the instructions given to the Aggregated Unit results in a down direction LBEAG iv = The percentage of the aggregated instructions to the Aggregate Unit that represents the OOM Energy market. LBEAG iv = The percentage of the aggregated instructions to the Aggregate Unit that represents the OOM Energy market.

PR (OOM Tool)  No PRR  Probable new Bill Determinants  No changes to Settlement formulas

PR (OOM Tool)  The requirements for this project have not been fully defined  EMMS design has not been finalized yet  Changes to Settlements will result in the designed changes on the EMMS side