Todos los derechos reservados para XM S.A E.S.P. October, 2006 Luis Alejandro Camargo S. Wholesale Market Manager XM S.A. E.S.P. THE NEW COLOMBIA FIRM.

Slides:



Advertisements
Similar presentations
The Single Electricity Market in Ireland
Advertisements

ENERGY MARKET REFORM: Gas Transportation & Distribution Issues Presentation to GTE 2 nd Annual Conference by Gerald Doucet Secretary General, World Energy.
Update on Demand Resource Participation in New Englands Forward Capacity Market Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
© 2013 Day Pitney LLP Overview and Update on the Ever-Evolving New England Wholesale Capacity Market presentation to Boston Bar Association May 23, 2013.
Better Align Capacity Markets with Policy/Planning Objectives James Daly, VP Energy Supply Restructuring Roundtable Sept 21, 2012.
1 Capacity mechanisms - IFIEC position June 12 th 2012.
Legal Framework, Investment Opportunities and Technical Innovation in the Electricity Sector Security of Supply through competitive markets: Design of.
Winter 2013/2014 Reliability Solution Including LNG MWHs N. Jonathan Peress Conservation Law Foundation Greg Lander Skipping Stone NEPOOL Markets & Reliability.
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
Generation Adequacy through Backstop Call Option Obligations Shmuel S. Oren University of California at Berkeley Presented at CREG Workshop, Bogotá, Colombia.
1 NBS-M017 – 2013 CLIMATE CHANGE: GOVERNANCE AND COMPLIANCE Electricity Market Reform Aims to integrate both the Wholesale and Low Carbon Electricity Markets.
1 MondayTuesdayWednesdayThursdayFriday January February March April May
World Bank Workshop on Electricity Supply Security vs. Intermittent Renewable Energies A tale of two systems: Brazil and Colombia Jaime Millán February.
Luis A. Camargo S. Wholesale Electricity Market Manager Colombia The Andean Electricity Market -TIE- Cartagena de Indias, October 14&15th
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
LTTR, FCM, RPM, MRTU: Do More Acronyms Mean Better RTO Markets? An Overview of Various RTO Capacity Constructs and their Impact on Load.
1 Resource Adequacy and Market Power Mitigation via Option Contracts Hung-po Chao and Robert Wilson EPRI and Stanford University Presentation at POWER.
©2003 Prentice Hall Business Publishing, Advanced Accounting 8/e, Beams/Anthony/Clement/Lowensohn Foreign Currency Concepts and Transactions Chapter.
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
Comments on “A Capacity Market that Makes Sense” James Bushnell University of California Energy Institute.
The Convergence of Market Designs for Adequate Generating Capacity Peter Cramton and Steven Stoft 24 March 2006.
1 Colombia Firm Energy Auction Peter Cramton (joint with Steven Stoft) 18 December 2006.
A Capacity Market that Makes Sense Peter Cramton & Steven Stoft 18 March 2005.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Gas & Power Coordination: Growing Pains in Time of Transition Mark Stultz, BP Natural Gas Supply Association OPSI Annual Meeting Chicago, Illinois October.
Energy Production and Use in California Source: California Energy Commission
Reliability Pricing Model (RPM) Overview Andrew Ott PJM Senior Vice President, Markets.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
1 PRR 776 in the Context of the ERCOT Market Design Eric S. Schubert Regulatory Affairs Advisor BP Energy Company.
RISK & CAPACITY INVESTMENT INCENTIVES IN ELECTRICITY MARKETS Peter Jackson Department Of Management University Of Canterbury.
©2003 PJM Factors Contributing to Wholesale Electricity Prices Howard J. Haas Market Monitoring Unit November 30, 2006.
An Overview of the Australian National Electricity Market Brian Spalding Chief Operating Officer.
Reliability Charge Colombia, an investment oportunity Paris, Octuber 15-16th, 2007.
1 RAO UES of Russia: Investment Phase of the Reform A. B. Chubais Chairman of the Management Board RAO UES of Russia 10th Annual Investor Conference "Russia:
For discussion purposes only Financial Transmission Rights: Design options Presentation to Electricity Commission 2 September 2009.
Reactive Power Federal Energy Regulatory Commission Open Meeting December 15, 2004.
Overview of the Capacity Markets in the United States 2008 APEX Conference in Sydney, Australia October 13-14, 2008 Hung-po Chao Director, Market Strategy.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006.
1 Colombia Capacity Auction Peter Cramton (with many ideas from Steven Stoft) 9 June 2006.
1 Futures Chapter 18 Jones, Investments: Analysis and Management.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Wholesale Electricity Market – Western Australia APEx Conference 2008 – Sydney Allan Dawson 13 October 2008.
Several problems in implementation of the investment programs in power industry Speaker: A.Y.Kopsov, Member of the “Nice Club”, Doctor of Technical Science,
Colombia’s Forward Energy Market Peter Cramton University of Maryland 5 November 2007.
New Regulatory Scheme to Guarantee Power Reliability Colombia, an investment oportunity Santo Domingo, March 14-15, 2007.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Todos los derechos reservados para XM S.A E.S.P APEx Conference October 14 to October 17 Paris, France Central and South American Markets Luis Alejandro.
Capacity mechanisms in Europe The fundamental issues behind the ongoing sector enquiry Session 2 - If a capacity mechanism, which design is most appropriate?
Distributed Generation/Demand Resources in ISO New England’s Wholesale Markets 2nd Annual Distributed Energy Conference - Building Resilient Communities.
Study Unit 9 Decision Analysis and Risk Management.
Security of Supply Comments P. CAPROS, RAE Greece.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
The Australian Market Evolution Dr Brian Spalding Chief Operating Officer NEMMCO.
S PIEGEL & M C D IARMID New England’s Forward Capacity Market: How Did We Get Here and Where Are We Going? Scott H. Strauss APPA Legal Seminar Cambridge,
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
Todos los derechos reservados para XM S.A E.S.P. Luis Alejandro Camargo S. Wholesale Market Manager XM S.A. E.S.P. Colombian Market Stress Experiences.
INVESTMENT IN GENERATION CAPACITY PAYMENTS IN COLOMBIAN MARKET Luis A. Camargo S. Wholesale Electricity Market Manager Colombia APEx Orlando. October.
Wholesale Electricity Markets: Opportunities and Challenges Howard HaasUSAEE October 27, 2015.
Todos los derechos reservados para XM S.A E.S.P APEx Conference October 14 to October 17 Paris, France Interaction between adjacent markets in South.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Mario S. DePillis Jr. USAEE Meeting, Pittsburgh, PA October 25-28, 2015.
Systems Analysis Certificates for developing renewables and efficient use of energy By Senior research specialist Poul Erik Morthorst Systems Analyses.
PEA POTENTIAL FUTURE SCARCITY PRICING JUNE 2013 (UNFINISHED BUSINESS OF APRIL 2013) Drafter Lewis Evans.
How to avoid blackouts in Europe?
Resource Adequacy and Market Power Mitigation via Option Contracts
Asia-Pacific Energy Regulatory Forum
Benefits of New England’s Proposed Capacity Market
Long-term Capacity Market
Presentation transcript:

Todos los derechos reservados para XM S.A E.S.P. October, 2006 Luis Alejandro Camargo S. Wholesale Market Manager XM S.A. E.S.P. THE NEW COLOMBIA FIRM ENERGY MARKET

Todos los derechos reservados para XM S.A E.S.P. October, 2006 Luis Alejandro Camargo S. Wholesale Market Manager APEx 2006, Seoul

3 Due to the high Hydro component of supply, the Colombian system is vulnerable to energy shortages, while currently capacity is not an issue 0 1,000 2,000 3,000 4,000 ene-92 jul-92 ene-93 jul-93 ene-94 jul-94 ene-95 jul-95 ene-96 jul-96 ene-97 jul-97 ene-98 jul-98 ene-99 jul-99 ene-00 jul-00 ene-01 jul-01 ene-02 jul-02 ene-03 jul-03 ene-04 jul-04 ene-05 Total DemandTotal GenerationHydro GenerationThermal Generation rationing El Niño

4 A centrally administered mechanism has been in place for the last 10 years Capacity payment is assigned every year using a hydro-thermal generation model run for a critical hydrology defined by the Regulator, considering the costs and availability of the plants No explicit obligation for the generators who received the payment Verification of availability through random Audits

5 A Firm Energy Market was designed to reach multiple objectives In theory, these can be achieved through an energy only market, and some market have placed their bets on this approach. It implies a high variability in both cash flows for investors and energy prices for the demand. Others, opted for a capacity mechanism (market o administered), to ensure generation adequacy by allowing stable cash flows. A Firm Energy Market was the selection for the Colombian case. COMPETITION INVESTMENT & PERMANENCE EFFICIENCY MARKET POWER CONTROL RELIABILITY

6 The Firm Energy Market Proposal (1) The whole physical Demand buys the right to pay a maximum spot price defined by the Regulator (Scarcity/Strike Price) Generators receive an Option Price, which will be determined by the market in a descending clock auction

7 A Generator with Energy Firm Options receives the Option Price and is subjected to a Reward or a Penalty: (Q supplied – Qobligation) x (Pspot – PStrike) Scarcity/Strike Price Option Price The Firm Energy Market Proposal (2)

8 A Firm Energy Market was designed to reach multiple objectives REDUCE MARKET POWER AND SCARCITY RENTS AVOID BOOM/BUST CYCLES AND REDUCE INVESTOR RISK IMPROVE SPOT MARKET EFFIENCY AND REDUCE ITS VOLATILITY ACHIEVE DESIRED RELIABILITY – AVOID SHORTAGES ATRACT NEW AND ENOUGH GENERATION INVESTMENT

9 A new Firm Energy Market has been regulated from December 2006, using a financial call option backed by the physical capability to supply firm energy Generators are allowed to offer firm energy up to a centrally verified realistic limit Hydro generators are constrained by their hydrological characteristics and history Thermal generators are constrained by historical capacity and fuel contracts $12.00 = P0 P1 P2 P3 QuantityDemand Round 5 Round 4 starting price clearing price Aggregate supply curve P4 P5 $6.17 = P6 Round 3 Round 2 Round 1 excess supply $6.00 = P6’ descending clock auctions are held annually, three to four years in advance Generators acquire a firm energy obligation An administered demand curve represents the marginal value of additional firm energy. Price Limits: 2 x Cost of New Entry –CONE- to 0.5 CONE

10 The first auction will be held in May 2007 for 2010 commitments …2006 TRANSITION Existing resources New entrantsUp to 20 years 2010 auction Existing resources New entrantsUp to 20 years 2011 auction Existing resources New entrantsUp to 20 years 2012 auction (Dec. - Nov.) During the transition (initial) period, generators will be assigned the obligation pro rata of their declared firm energies The Option price will be defined by the Regulator in this period

11 Security mechanisms are provided to adjust positions and to avoid shortages Primary auctions Reconfiguration auctions Secondary market Last Resort generators Voluntary desconectable demand Fail-safe mechanism for inadequate supply or insufficient competition

12 References Colombia Firm Energy Market. Cramton, Peter and Stoft, Steve. 15 September 2006 Colombian Energy and Gas Regulation Commission. Resolution 071 and 079 of

Todos los derechos reservados para XM S.A E.S.P. October, 2006 Luis Alejandro Camargo S.